 Issue dateTitleTopic
ML16067A14428 January 2016SEP-ISI-PNPS-002, Rev 2, Pilgrim, Fifth Ten-Year Interval Inservice Inspection (Isi/Iwe) Program Plan.Ultimate heat sink
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Biofouling
EVT-1
Through-Wall Leak
Dissimilar Metal Weld
ML15237A25820 August 2015Refueling Outage (RFO)-20, In-Service Inspection (ISI) Owners Activity Report (OAR-1) SubmittalCoatings
Through-Wall Leak
ML14091A40725 March 2014Relief Request PRR-25 Rev. 1, Proposed Alternative, Request for Relief for Temporary Acceptance of a Flaw in Salt Service Water (SSW) System Pipe Spool JF29-8-4Ultimate heat sink
Mission time
Weld Overlay
Nondestructive Examination
Temporary Modification
Functionality Assessment
Seismically rugged
ML11230A9195 August 2011Revised Relief Request (PRR)-21, Contingency Repair Plan for Reactor Pressure Vessel (RPV) Standby Liquid Control Nozzle Weld, RPV-N14-1Non-Destructive Examination
Weld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
ML11235A72927 July 2011Refueling Outage (RFO)-18 In-Service Inspection (ISI) Owner'S Activity Report (OAR-1) SubmittalCoatings
ML09245059224 August 2009Submittal of Refueling Outage (RFO) -17 In-Service Inspection (ISI) Owners Activity Report (OAR)-1
CNRO-2009-00003, Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activ17 March 2009Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination ActivitiesNondestructive Examination
ML08115071616 April 2008Request for Approval of Proposed Relief Request VR-4A to Extend 5-Year Test Interval on a One-Time Basis for One Main Steam Safety Valve RV-203-4A, Transmittal of Inservice Testing Relief Request No. RV-07, Letter No. 2.08.021Foreign Material Exclusion
ML07218023731 July 2007Refueling Outage 16, Inservice Inspection (ISI) Summary ReportCoatings
ML07143018816 May 2007Third Ten-Year ISI Interval Relief Request, PRR-42, Examinations of Component Welds with Less than Essentially 100% Examination Coverage
ML05216027429 July 2005Inservice Inspection Summary Report for Refuel Outage 15Weld Overlay
VT-2
Pressure Boundary Leakage
Dissimilar Metal Weld
ML0507404047 March 20052005 On-Line and Refueling Outage (RFO) - 15 Inservice Inspection (ISI) PlanVT-2
EVT-1
ML05063039724 February 2005Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request PR-03 (TAC N0.MB8779)Mission time
ML0416203922 June 2004Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station, Fourth Ten-Year In-service Testing (IST) Program, IST Relief Requests: PR-03 (TAC No. MB8779), VR-03 (MB8777), VR-04 (MB8778), and VR-06 (MB8780)
JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs14 April 2004Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure StudsIncorporated by reference
ML0325911418 September 2003Startup Test Report Cycle 15Shutdown Margin
ML0322500571 August 2003Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Summary ReportVT-2
Dissimilar Metal Weld
ML0707902288 July 2003RF014 ISI Summary Report for NRC Submittal with AttachmentVT-2
Dissimilar Metal Weld
ML07156025127 April 2003CR-PNP-2003-01618 with Supporting Report (with Redacted Notes) 1st Page for Inspector
ML03113011814 April 20032003 On-Line and Refueling Outage (RFO) - 14 Inservice Inspection (ISI) PlanVT-2