Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16067A144 | 28 January 2016 | SEP-ISI-PNPS-002, Rev 2, Pilgrim, Fifth Ten-Year Interval Inservice Inspection (Isi/Iwe) Program Plan. | Ultimate heat sink Weld Overlay Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Biofouling EVT-1 Through-Wall Leak Dissimilar Metal Weld |
ML15237A258 | 20 August 2015 | Refueling Outage (RFO)-20, In-Service Inspection (ISI) Owners Activity Report (OAR-1) Submittal | Coatings Through-Wall Leak |
ML14091A407 | 25 March 2014 | Relief Request PRR-25 Rev. 1, Proposed Alternative, Request for Relief for Temporary Acceptance of a Flaw in Salt Service Water (SSW) System Pipe Spool JF29-8-4 | Ultimate heat sink Mission time Weld Overlay Nondestructive Examination Temporary Modification Functionality Assessment Seismically rugged |
ML11230A919 | 5 August 2011 | Revised Relief Request (PRR)-21, Contingency Repair Plan for Reactor Pressure Vessel (RPV) Standby Liquid Control Nozzle Weld, RPV-N14-1 | Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Finite Element Analysis Liquid penetrant Dissimilar Metal Weld |
ML11235A729 | 27 July 2011 | Refueling Outage (RFO)-18 In-Service Inspection (ISI) Owner'S Activity Report (OAR-1) Submittal | Coatings |
ML092450592 | 24 August 2009 | Submittal of Refueling Outage (RFO) -17 In-Service Inspection (ISI) Owners Activity Report (OAR)-1 | |
CNRO-2009-00003, Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activ | 17 March 2009 | Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activities | Nondestructive Examination |
ML081150716 | 16 April 2008 | Request for Approval of Proposed Relief Request VR-4A to Extend 5-Year Test Interval on a One-Time Basis for One Main Steam Safety Valve RV-203-4A, Transmittal of Inservice Testing Relief Request No. RV-07, Letter No. 2.08.021 | Foreign Material Exclusion |
ML072180237 | 31 July 2007 | Refueling Outage 16, Inservice Inspection (ISI) Summary Report | Coatings |
ML071430188 | 16 May 2007 | Third Ten-Year ISI Interval Relief Request, PRR-42, Examinations of Component Welds with Less than Essentially 100% Examination Coverage | |
ML052160274 | 29 July 2005 | Inservice Inspection Summary Report for Refuel Outage 15 | Weld Overlay VT-2 Pressure Boundary Leakage Dissimilar Metal Weld |
ML050740404 | 7 March 2005 | 2005 On-Line and Refueling Outage (RFO) - 15 Inservice Inspection (ISI) Plan | VT-2 EVT-1 |
ML050630397 | 24 February 2005 | Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request PR-03 (TAC N0.MB8779) | Mission time |
ML041620392 | 2 June 2004 | Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station, Fourth Ten-Year In-service Testing (IST) Program, IST Relief Requests: PR-03 (TAC No. MB8779), VR-03 (MB8777), VR-04 (MB8778), and VR-06 (MB8780) | |
JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs | 14 April 2004 | Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs | Incorporated by reference |
ML032591141 | 8 September 2003 | Startup Test Report Cycle 15 | Shutdown Margin |
ML032250057 | 1 August 2003 | Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Summary Report | VT-2 Dissimilar Metal Weld |
ML070790228 | 8 July 2003 | RF014 ISI Summary Report for NRC Submittal with Attachment | VT-2 Dissimilar Metal Weld |
ML071560251 | 27 April 2003 | CR-PNP-2003-01618 with Supporting Report (with Redacted Notes) 1st Page for Inspector | |
ML031130118 | 14 April 2003 | 2003 On-Line and Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Plan | VT-2 |