BW210083, Revision to Unit 1 Inservice Inspection Summary Report

From kanterella
Jump to navigation Jump to search
Revision to Unit 1 Inservice Inspection Summary Report
ML21349A116
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/15/2021
From: Keenan J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW210083
Download: ML21349A116 (6)


Text

Exelon Generation Company, Ll.C Braidwood Station Exelon Generation" 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 December 15, 2021 10 CFR 50.55a(g)

BW210083 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Unit 1 Renewed Facility Operating License No. NPF-72 NRC Docket No. STN 50-456 .

Subject:

Braidwood Station, Revision to Unit 1 lnservice Inspection Summary Report

Reference:

Letter from M. Marchionda Palmer (Exelon Generation Company, LLC) to U.S.

Nuclear Regulatory Commission, " Braidwood Station, Unit 1 lnservice Inspection Summary Report" dated January 17, 2020 Enclosed please find the revision to post-outage summary report for lnservice Inspection (ISi)

  • examinations conducted prior to and during Braidwood Station, Unit 1 Refueling Outage 21 (A 1R21 ). This report is submitted in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for the lnservice Inspection of Nuclear Power Plant Components," and ASME Code Case. N-532-5,

'.'Repair/Replacement Activity Documentation Requirements and lnservice Inspection Summary Report Preparation and Submission- Section XI, Division 1."

Attachment 1 has been revised from the original report (Reference 1) to provide the Owner's Activity Report (OAR) for ISi activities conducted prior to and during A 1R21 including a list of items with flaws or relevant conditions that required evaluation for continued service, and an abstract of repair/replacement activities required for continued service. Ncite 1 has been included for the clarification of the revision.

Please direct any questions you may have regarding this submittal to Mr. Richard Schliessmann, acting Regulatory Assurance Manager, at (815) 417-2820.

Keenan Jo hn P. ON:cn=Keenan,JohnP.

Digitally signed by Keenan, John P.

I Date: 2021.12.13 06:55:48 -06'00' John Keenan Site Vice President Braidwood Station

Attachment:

1. Owner's Activity Report (OAR) for A 1.R21 cc: Regional Admiflistrator - NRC Region Ill NRC Senior Resident Inspector- Braidwood Station NRR Project Manager- Braidwood Station Illinois Emergency Management Ag~ncy - Division of Nuclear Safety

ATTACHMENT 1 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1, ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT*

REQUIRED EVALUATION FOR CONTINUED SERVICE TABLE 2, ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED

. FOR CONTINUED

. SERVICE

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number Plant A1R21 Braidwood Generating Station, 35100 South Route 53, Suite 84, Braceville, Illinois 60407 Unit No. ____1_-,-_ Commercial Service Date ---"'"Ju=lyL..=2""9""'1""9-"8=8_ _ _ Refueling Outage Number AlR21 (if applicable)

Current Inspection Interval Fourth Inspection Interval (ISI), Third Inspection Interval (Containment ISI)

(1't, 2nd, 3'd, 4'h, other)

Current Inspection Period First Inspection Period (ISi and Containment ISi)

(l", 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plans ASME Section XI 2013 Edition, No Addenda Date and Revision of Inspection Plans _O_ct_o_b_er_9_1_.h,_2_0_1_8..,/_R_e_v_._O._;- - - - . , - - - - - - - - - - - - - - - - - - - -

Edition and Addenda of Section XI applicable to repair/replacement a!=tivlties, if different than the insp~ction plans Same as above Code Cases used: N-513~4, N-532-5 N-639, N-729-4 N-731 N-747, CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME <::ode,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of A1R21 conform to the requirements of Section XI (refueling outage number)

Signed Mcw.J.;r s~ , - ~ - Date 12/02/2021 (Owner or Owner's designee. Title)

CERTIFICATE OF INSERVICE INSPECTION I, the undersign.ed, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, Connecticut have inspected the items described in ~his Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

..,.JAAew,J,._ ~ .

  • _A,:

IIJWU/.A-1'~ Commission 1'18 /Jl,,U. /N/C.

. . ~ r ' s Signature) ~ (National Board Number and Endorsement)

Date

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Examination Item Cateaorv Number Item Description Evaluation DescriDtion

    • Note 1**

(C-C) C3.20 Luo Attach for 1 MS07002C 1MS-07-SW0B (EC-374961)

TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Descriotion Of Work Comoleted Plan Number 3 1DG5048A Replace valve, valve is hard to 04/06/2019 WO # 4624252-01 open. (Plan 1-19-001) 2 1FW035B Replace valve plug retaining 10/11/2019 WO # 4606972-01 rina per IR 2731940 (Plan 1-19-009) 3 1CC9520B Disc and Bushing O-ring 3/15/2019 WO # 1942260-01 needed replaced per IA (Plan 1-19-012) 4225422.

2 1AF014G Exiting valve replaced due to 10/18/2019 WO# 4755065-01 "As Found" test failure per IR (Plan 1-19-058) 4289020 2 1AF014C Exiting valve replaced due to 10/18/2019 WO# 4755066-01 "As Found" test failure per IA (Plan 1-19-059) 4289127 3 0WO01CB Replace 2 degraded fasteners 11/16/2019 WO# 01631000-39 on the west condenser head (Plan 1-19-061) per IR 4297028 2 1S102003S Snubber did not meet functional 10/14/2019 WO # 4835025-82 test criteria and requires (Plan 1-19-055) replacement. Per IR 4287321 .

1 1RC02006S-B Snubber did not meet functional 10/18/2019 WO # 4835025-28 .

test criteria and requires (Plan 1-19-053) replacement per IR 4287143 1 1RC02006S-A Snubber did not meet functional 10/17/2019 WO # 4835025-26 test criteria and requires (Plan 1-19-052) replacement per IR 4287141 2 1CV41036S Degraded snubber requires 10/14/2019 WO # 4835025-22 replacement *per IR 4286524 (Plan 1-19-050 1 1CV16034V Variable Spring Can found out 10/19/2019 WO # 4970350-01 of tolerance per IR 4287731 Corrective Measure (1WF3122.2(a))

2 1FW05024C Constant Spring Can found out 10/19/2019 WO # 4970362-01 of tolerance per IA 4287727 Corrective Measure (1WF3122.2(a))

    • Note 1**

IR 4454067 has been generated to update Table 1 to remove Code Case N-513 for line 1SX93AB, as UT results from the original inspection were above new calculated minimum wall thickness. Therefore, Code Case N-513 was not used to evaluate the flaw.