Category:Inservice/Preservice Inspection and Test Report
MONTHYEARRA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-22-0308, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2022-12-16016 December 2022 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-20-0373, Submittal of IWB-3640 Analytical Evaluation of RPV Nozzle N4D Safe End to Pipe Weld Indication2021-01-19019 January 2021 Submittal of IWB-3640 Analytical Evaluation of RPV Nozzle N4D Safe End to Pipe Weld Indication RA-20-0247, Supplement to Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1)2020-07-30030 July 2020 Supplement to Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) RA-19-0447, Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1)2020-06-23023 June 2020 Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) RA-19-0256, Submittal of Inservice Inspection Program Owner'S Activity Report for Refueling Outage 242019-06-20020 June 2019 Submittal of Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 RA-18-0067, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 222018-06-28028 June 2018 Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 22 BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0044, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 222017-05-25025 May 2017 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 22 BSEP 16-0037, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 212016-05-18018 May 2016 Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 21 BSEP 15-0051, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 212015-06-29029 June 2015 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 21 BSEP 13-0089, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 202013-08-0606 August 2013 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 20 BSEP 12-0086, Inservice Inspection Program Owner'S Activity Report for Unit I Refueling Outage 182012-07-25025 July 2012 Inservice Inspection Program Owner'S Activity Report for Unit I Refueling Outage 18 BSEP 11-0060, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 192011-06-17017 June 2011 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 19 BSEP 11-0027, Response to Request for Additional Information Regarding Proposed Alternatives for the Third 10-Year Inservice Inspection Program2011-02-28028 February 2011 Response to Request for Additional Information Regarding Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 11-0011, Response to Request for Additional Information - Proposed Alternatives for the Third 10-Year Inservice Inspection Program2011-01-28028 January 2011 Response to Request for Additional Information - Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 10-0043, Proposed Alternatives for the Third 10-Year Inservice Inspection Program2010-07-23023 July 2010 Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 10-0091, Inservice Inspection Program Owner'S Activity Report, Refueling Outage 172010-07-23023 July 2010 Inservice Inspection Program Owner'S Activity Report, Refueling Outage 17 BSEP 09-0125, Response to Request for Additional Information Regarding Third 10-Year Inservice Inspection Interval Request for Relief RR-462009-12-0202 December 2009 Response to Request for Additional Information Regarding Third 10-Year Inservice Inspection Interval Request for Relief RR-46 BSEP 09-0078, Submittal of Inservice Inspection Program Owner'S Activity Report, Refueling Outage 182009-07-28028 July 2009 Submittal of Inservice Inspection Program Owner'S Activity Report, Refueling Outage 18 BSEP 09-0043, Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection Program2009-05-0808 May 2009 Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection Program BSEP 09-0024, Proposed Alternative for the Third 10-Year Inservice Inspection Program2009-04-27027 April 2009 Proposed Alternative for the Third 10-Year Inservice Inspection Program BSEP 08-0140, Proposed Alternative for Reactor Vessel Skirt Support Examinations2008-10-10010 October 2008 Proposed Alternative for Reactor Vessel Skirt Support Examinations BSEP 08-0109, Owner'S Activity Report for Third 10-Year Inservice Inspection Program2008-08-26026 August 2008 Owner'S Activity Report for Third 10-Year Inservice Inspection Program BSEP 08-0062, Inservice Inspection Plan for the Fourth 10-Year Inspection Interval2008-05-21021 May 2008 Inservice Inspection Plan for the Fourth 10-Year Inspection Interval BSEP 07-0110, BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval.2007-10-25025 October 2007 BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval. BSEP-07-0063, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 17 Owner'S Activity Report2007-07-16016 July 2007 Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 17 Owner'S Activity Report BSEP-06-0066, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity Report2006-06-26026 June 2006 Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity Report BSEP 03-0137, Inservice Inspection Program for the Third 10-Year Interval-Refueling Outage 15 (B216R1) Owner'S Activity Report2003-10-20020 October 2003 Inservice Inspection Program for the Third 10-Year Interval-Refueling Outage 15 (B216R1) Owner'S Activity Report BSEP 02-0102, Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections2002-05-20020 May 2002 Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections 2023-06-28
[Table view] Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] |
Text
ProgressEnergy JUN, 2 6 2006 SERIAL: BSEP 06-0066 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit No. 1 Docket No. 50-325/License No. DPR-71 Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner's Activity Report Ladies and Gentlemen:
Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc.,
submits the enclosed American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Form OAR-1 Owner's Activity Reports for the Brunswick Steam Electric Plant (BSEP), Unit No. 1. The enclosed Form OAR-1 Owner's Activity Reports cover inspection activities being credited for the second and third inspection period of the third 10-year inservice inspection interval. The second period of the third 10-year interval began May 11, 2001, and ended May 10, 2005; the third period of the third 10-year interval began May 11, 2005, and ends May 10, 2008.
On October 31, 2005, a revision to 10 CFR 50.55a went into effect which incorporates, by reference, NRC Regulatory Guide 1.147, Revision 14, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1." This revision of Regulatory Guide 1.147 indicates that ASME Code Case N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1," can be used provided the OAR-1 forms are prepared and certified following completion of each refueling outage and submitted to the NRC within 90 days of the completion of the refueling outage.
As specified by the ASME Code Case and Regulatory Guide 1.147, the Form OAR-I Owner's Activity Report for BSEP, Unit 1 Refueling Outage 15 (i.e., B 116R1) is provided in Enclosure 1. Enclosure 2 provides a copy of the Form OAR-1 Owner's Activity Report for the Unit 1 containment inspections performed in accordance with the ASME Code,Section XI, Subsection IWE, during Refueling Outage 15. Refueling Outage 15 for Unit 1 ended on April 6, 2006.
Progress Energy Carolinas. Inc.
Brunswick Nuclear Plant PO Box 10429 Southport, NC 29461
Document Control Desk BSEP 06-0066 / Page 2 No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Leonard R. Belier, Supervisor - Licensing/Regulatory Programs, at (910) 457-2073.
Sincerely,
~ C~v Randy C. Ivey Manager - Support Services Brunswick Steam Electric Plant WRM/wrm
Enclosures:
- 1. Owner's Activity Report - OAR-I Report for B16R1 Refueling Outage, Revision 0
- 2. Owner's Activity Report - OAR-1 Report for B 11 6R 1 Refueling Outage Containment Inspections
Document Control Desk BSEP 06-0066 / Page 3 cc (with enclosures):
U. S. Nuclear Regulatory Commission, Region II ATTN: Dr. William D. Travers, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Eugene M. DiPaolo, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Ms. Brenda L. Mozafari (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. Jack Given, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101
T BSEP 06-0066 Enclosure 1 Owner's Activity Report - OAR-1 Report for B 116R1 Refueling Outage, Revision 0
PROGRESS ENERGY BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 OWNER'S ACTIVITY REPORT OAR-1 REPORT FOR B116RI REFUELING OUTAGE REVISION 0 Prepared By: Date ,-7-O(o NDE Program Manager Reviewed By Date 40
/
- rogra Manager Reviewed By: etA Date _,7_____
Independent Review Reviewed By:!rsvIpt Date
,) uthonzedNula nevcIspto
Revision Summary 9 Initial issue
INTRODUCTION This report represents a summary of the Inservice Inspection (ISI) activities performed at the Carolina Power and Light Company's Brunswick Steam Electric Plant (BSEP) Unit 1 during the Spring 2006 refueling outage.
The examinations and testing performed during this timeframe were for credit during the second and third inspection period of the Third Inspection Interval.
Examinations and testing were performed to satisfy the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Inspection Program B, 1989 Edition with no addenda.
In accordance with requirements of Code Case N-532, which has been approved for use at the Brunswick Station, enclosed is the Owners Activity Report (OAR-1 Report).
FORM OAR-1 OWNER'S ACTIVITY REPORT Report number _ 1-06-B16R 1 Owner _Carolina Power & Light Company d/b/a Progress Energy Carolinas Inc., PO Box 1551, Raleigh North Carolina (Name and Address of Owner)
Plant __Brunswick Steam Electric Plant, PO Box 10429, Southport, North Carolina (Name and Address of Plant)
Unit No. ____ __ Commercial Service Date _____3/17f77 - Refueling outage no. __._B116R1_
(if applicable)
Current inspection interval __ I (Ist, 2nd, 3rd, 4th, other) f* A
%.UfULnt InSpV~uon11 UtIJuuI 3 U (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plan -. __1989 Edition with no addenda Date and revision of inspection plan _____October 27, 2005 __ISI Program Plan revision 13 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct and that the examinations, tests, repairs, replacements, evaluations and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No. NA_ Expiration Date NA (if applicable)
Signed ( - NDE Program Manager- Date 4 O Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the under signed, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of _North Carolina_ and employed by _____Hartford Steam Boiler_ of
_Connecticut have inspected the items described in the Owner's Activity Report during the period _6/10/04 to _ 4/07/06_ , and state that to the best of my knowledge and belief, the Owner has performed all of the activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warrantee, expressed or implied, concerming the tests, repairs, replacements, evaluations and corrective measures described this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for an personal injury or property damage or a loss of any kind arising from or connected with this inspection.
17 1-h-l-r) Al' Commissions ____NC-1433, A.N.I.B.C.
VInspect Signature National Board, State, Province and Endorsements Date-
TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Tota Total hExaminations Examinations Examinations Examinations Examination Required for Credited for Credied () Credited~ (%)
Ctegory The intcrval ThisPeriod for The < to Datefr Reniarks
?Perkio Interval __
B-A 26 3 12 46 See note 2 B-D 70 4 3 71 See note 2 B-E 46 0 0 0 See note 2 B-G-I 336 320 95 95 See note 2 B-G-2 NA 3 NA NA See note 4, 5 B-K 14 0 0 57 See note 7 B-L-2 NA NA NA NA See note 4 B-M-2 NA 3 NA NA See note 4 B-N-I 3 0 0 67 B-N-2 32 0 0 0 See note 2 B-O 8 8 100 100 See note 2 C-A 3 0 0 67 C-B 2 0 100 100 See note 6 C-C 11 0 0 55 See note 7 C-F-2 30 0 0 63 D-A 6 0 0 67 See note 7 F-A 67 0 0 61 R-A 49 17 35 82 See note 3
TABLE 1 NOTES The following notes correspond to the numbers referenced in Table 1 of the OAR-1 Report:
- 1. Examination categories B-B, B-H, B-K-i, B-N-3, B-L-1, B-M-1, C-F-i, C-G, D-B, and D-C do not apply to the Brunswick Station or are not required for the Third Inspection Interval.
- 2. Some or all examinations in this category may be deferred until the end of the inspection interval.
- 3. Examination category B-F and B-J have been subsumed by Category R-A to reflect approval of a Class 1 Risk Informed ISI Program. This was implemented after commencement of the Inspection Interval and the total number of examinations for the interval reflect relief request RR-27.
- 4. The examinations under this examination category are event related. They are only required if a subject pump or valve is disassembled during a maintenance activity.
- 5. Item number B7.80 of this category includes a requirement to examine CRD bolting if a CRD is disassembled. In accordance with relief request RR-04 which implemented Code Case N-547, there is no longer a requirement to examine this bolting
- 6. This category has only 2 items and is covered by Relief Request RR-21.
- 7. This examination category is performed per the requirements of Code Case N-509.
TABLE 2 ITEMS WTH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE 1* t I 1* I I I 4 +
i v i .
r I I I I I I* I 1 I
+
TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Service Water line Keplacement or 1-SW-307-1-046 piping containing throu~h-wall leak Replacement Service Water line Replacement of pipe No 4/26/06 688920-03 1-SW-71-4-157 containing through wall leak
BSEP 06-0066 Enclosure 2 Owner's Activity Report - OAR-i Report for B 116R1 Refueling Outage Containment Inspections
ATTACHMENT 1 Page 1 of 2 Code Case N-532 Form OAR-i, Owner's Activity Report FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number CIP-B116R1 Owner Carolina Power &Ught Company d/b/a Progress Energy Carolinas, Inc., PO Box 1551, Raleigh, North Carolina (Name and Address of Owner)
Plant Brunswick Steam Electric Plant, PO Box 10429, Southport, North Carolina (Name and Address of Plant)
Unit No. 1 Commercial service date March 1977 Refueling outage no. B116R1 (ifapplicable)
Current inspection interval First Containment Inspection Interval (Subsection IWE &IWL Only)
(18', 2nd, 3d, 40, other)
Current Inspection period 3 !dInspection Period (1'4 2!4, 3 d)
Edition and Addenda of Section Xl applicable to the inspection plan 1992 Edition w/ 1992 Addenda Date and revision of inspection plan OBNP-TR-002, Revision 09,0210212006 Edition and Addenda of Section XI applicable to repairs and replacements, if different that the inspection pla N/A CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No. N/A Expiration Date N/A Signed Jerry W. Crider 4 t?,,
o (.,, L .. ISI Proqram Manaaer Date 5/30/2006 4
Owner or nerls Designee, Titte CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, during the period 4/11/04 to 5/30/06 , and state that to the best of my knowledge and belief, the Owner has performed all of the activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures descn'bed in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from 9,1 connected with this inspection.
/ .,/t/* C. " ' Commissions NB-9557-ANIBC; NC-1433
" Inspector's Signature National Board, State, Province, and Endorsements Date ________
I OENP-16 I Rev. 43 1 1
ATTACHMENT 2 Page 2 of 2 Code Case N-532 Tables 1, 2, and 3 Note: This Owner's Activity Report is only applicable to the Containment Inspection Program (Subsection IWE & IWL) and does not address Class 1, 2, and 3 components.
TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) To Examination Required For Credited For Credited (%) Date For Category The Interval This Period For This Period The Interval Remarks NI N1 NI N1 Ni NI - Examination percentages are not applicable to the components examined. During the B116R1 outage, only ISI Class MC components associated with the Drywell containment were examined. No ISI Class CC components were examined.
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDmONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Flaw or Relevant Condition Found Repair, During Scheduled Replacement, Section Xl Repair/
Code or Corrective Examination or Date Replacement Class Measure Item Description Description of Work Test (Yes or No) Completed Plan Number N/A None N/A N/A N/A N/A N/A OENP-16 Rev. 43 1 I