PLA-8089, Submittal of Revision to Inservice Testing Program Plan | 5 December 2023 | Submittal of Revision to Inservice Testing Program Plan | |
PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-8019 | 13 July 2022 | Nd Refueling Outage Owner'S Activity Report, PLA-8019 | |
PLA-7876, 21st Refueling Outage Owner'S Activity Report (PLA-7876) | 21 July 2020 | 21st Refueling Outage Owner'S Activity Report (PLA-7876) | Weld Overlay |
PLA-7797, Th Refueling Outage Owner'S Activity Report (PLA-7797) | 9 July 2019 | Th Refueling Outage Owner'S Activity Report (PLA-7797) | |
PLA-7724, 20th Refueling Outage Owner'S Activity Report (PLA-7724) | 23 July 2018 | 20th Refueling Outage Owner'S Activity Report (PLA-7724) | Weld Overlay Through Wall Leak |
PLA-7507, Transmittal of 19th Refueling Outage Owner'S Activity Report | 27 July 2016 | Transmittal of 19th Refueling Outage Owner'S Activity Report | |
PLA-7368, Submittal of 17th Refueling Outage Owner'S Activity Report | 11 August 2015 | Submittal of 17th Refueling Outage Owner'S Activity Report | |
PLA-7193, Request to Continue Use of a Risk-Informed Inservice Inspection Alternative in a Proposed Relief Request No. 4RR-01 to the Fourth 10-Year Inservice Inspection Program | 29 October 2014 | Request to Continue Use of a Risk-Informed Inservice Inspection Alternative in a Proposed Relief Request No. 4RR-01 to the Fourth 10-Year Inservice Inspection Program | Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Scram Discharge Volume Dissimilar Metal Weld |
PLA-7232, Th Refueling Outage Owner'S Activity Report | 28 August 2014 | Th Refueling Outage Owner'S Activity Report | |
PLA-7194, Susequehanna Steam Electric Station, Unit 2 - Inservice Testing Program Plan | 18 June 2014 | Susequehanna Steam Electric Station, Unit 2 - Inservice Testing Program Plan | Safe Shutdown High Radiation Area Stroke time Hydrostatic Incorporated by reference Locked High Radiation Area Cold shutdown justification Power-Operated Valves Grace period |
PLA-7178, Inservice Inspection Program Plan for the Fourth Ten-Year Interval | 2 June 2014 | Inservice Inspection Program Plan for the Fourth Ten-Year Interval | Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Scram Discharge Volume Moisture barrier License Renewal Dissimilar Metal Weld |
PLA-7179, Snubber Program Plan for the Fourth Ten-Year Inservice Inspection Interval, PLA-7179 | 2 June 2014 | Snubber Program Plan for the Fourth Ten-Year Inservice Inspection Interval, PLA-7179 | |
PLA-7154, Response to Request for Additional Information on Fourth Ten-Year Inservice Inspection Interval Proposed Relief Requests | 28 April 2014 | Response to Request for Additional Information on Fourth Ten-Year Inservice Inspection Interval Proposed Relief Requests | VT-2 |
PLA-7092, Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-7092 | 10 October 2013 | Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-7092 | |
PLA-7047, Th Rio Steam Dryer Visual Inspection Report | 25 July 2013 | Th Rio Steam Dryer Visual Inspection Report | |
PLA-6871, Th Refueling Outage Owner'S Activity Report | 30 August 2012 | Th Refueling Outage Owner'S Activity Report | Through Wall Leak |
PLA-6847, Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program | 24 April 2012 | Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program | |
PLA-6814, Request in Accordance with 10 CFR 50.55a(f)(4)(iv) for IST Components to Use Subsequent ASME OM Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval Revision 1, PLA-6814 | 13 February 2012 | Request in Accordance with 10 CFR 50.55a(f)(4)(iv) for IST Components to Use Subsequent ASME OM Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval Revision 1, PLA-6814 | Incorporated by reference |
PLA-6404, Relief Request 2RR07 for Third Ten-Year Interval Inservice Testing Program Plan | 5 August 2008 | Relief Request 2RR07 for Third Ten-Year Interval Inservice Testing Program Plan | Anchor Darling |
PLA-6099, Notification of Changes to Snubber Inspection and Testing Requirements for Third 10-Year Interval In-Service Inspection Program Plan | 19 March 2007 | Notification of Changes to Snubber Inspection and Testing Requirements for Third 10-Year Interval In-Service Inspection Program Plan | |
ML063450131 | 30 November 2006 | Fourth Ten-Year Inservice Inspection Interval Request for Alternate (Relief Request 2004-ON-001) | Hydrostatic |
PLA-5960, Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans | 29 September 2005 | Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans | Internal Flooding Probabilistic Risk Assessment |
PLA-5905, Reconciliation of the Second 10-Year Interval Inservice Inspection Program Plan, PLA-5905 | 31 May 2005 | Reconciliation of the Second 10-Year Interval Inservice Inspection Program Plan, PLA-5905 | High Radiation Area Non-Destructive Examination Weld Overlay Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume Large early release frequency Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML042730338 | 20 September 2004 | Third Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-006 | |
PLA-5805, Relief Requests 1RR05 and 2RR05 for Third Ten-year Interval Inservice Testing Program Plans for Susquehanna Ses Units 1&2 | 10 September 2004 | Relief Requests 1RR05 and 2RR05 for Third Ten-year Interval Inservice Testing Program Plans for Susquehanna Ses Units 1&2 | Internal Flooding Probabilistic Risk Assessment |
ML042180182 | 26 July 2004 | Proposed Relief Request No. 3RR-12 to the Third 10-year Inservice Inspection Program | Weld Overlay |
PLA-5775, Thirteenth Refueling and Inspection Outage ISI Summary Report | 16 July 2004 | Thirteenth Refueling and Inspection Outage ISI Summary Report | |
PLA-5783, Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-5783 | 14 July 2004 | Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-5783 | Dissimilar Metal Weld |
PLA-5753, Response to NRC Request for Additional Information Relating to Relief Request 3RR-03 | 27 May 2004 | Response to NRC Request for Additional Information Relating to Relief Request 3RR-03 | High Radiation Area Enforcement Discretion Nondestructive Examination Earthquake |
PLA-5743, Supplemental Information for Proposed Relief Requests No. 29 and 30 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1 | 7 April 2004 | Supplemental Information for Proposed Relief Requests No. 29 and 30 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1 | Non-Destructive Examination Weld Overlay Hydrostatic Through Wall Leak Dissimilar Metal Weld |
PLA-5662, Proposed Third Ten-Year Inservice Inspection, Interval Inservice Inspection Program Plan | 16 September 2003 | Proposed Third Ten-Year Inservice Inspection, Interval Inservice Inspection Program Plan | Non-Destructive Examination Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume Large early release frequency Dissimilar Metal Weld |
PLA-5649, Eleventh Refueling & Inspection Outage ISI Summary Report, PLA-5649 | 18 July 2003 | Eleventh Refueling & Inspection Outage ISI Summary Report, PLA-5649 | Hydrostatic VT-2 FLEX EVT-1 Scaffolding |
PLA-5503, Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D.2, Modification Group NIS-2 Forms | 19 July 2002 | Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D.2, Modification Group NIS-2 Forms | Hydrostatic |