2CAN010403, (Ano), Unit 2 - Inservice Inspection (ISI) Summary Report

From kanterella
Jump to navigation Jump to search
(Ano), Unit 2 - Inservice Inspection (ISI) Summary Report
ML040210333
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/16/2004
From: Ashley G
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2CAN010403
Download: ML040210333 (9)


Text

E-t-r7g En .

teh y Entergy Operatlons, Inc.

1448 S. R. 333 Russellville, AR 72802 Tel 501 858 5000 2CAN010403 10CFR50.55a January 16, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Inservice Inspection (ISI) Summary Report Arkansas Nuclear One (ANO) - Unit 2 Docket No. 50-368 License No. NPF-6

Dear Sir or Madam:

Pursuant to the requirements of 10CFR50.55a, the attached Inservice Inspection (ISI) summary report for ASME Class 1 and 2 pressure retaining components and their supports for Arkansas Nuclear One, Unit 2 (ANO-2) is provided for your review. The results presented by this letter are representative of the first inspection period (extended) and second inspection period of the third ten-year inspection interval. This submittal is provided in accordance with ASME Section Xl IWA-6230 and Code Case N-532-1. The attachment provides ASME form OAR-1 'Owner's Activity Report" plus tables that present: (1) an abstract of examinations and tests, (2) conditions requiring evaluation and (3) actions necessary for continued service.

This correspondence contains no commitments. Should you have any questions or comments, please contact Mr. Fred Van Buskirk at (479) 858-3155.

Sincerely, Glenn R. Ashley Manager, Licensing GRA/fpv Attachment

2CAN01 0403 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001

Attachment 2CAN01 0403 Owner's Activity Report OAR-2321

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-2321 Aw,-Ar Fntcprn Ark~nn~n Inr~I P C) Rnv J;1~TCrRY Trr I itta Pn~_k AP 797nn

. .... v. go.. .. _ v ov ....... v. eo ... v.I a.A.a ------ e v (Name and Address of Owner)

Plant Arkansas Nuclear One /1448 S.R. 333. Russellville. AR. 72802 (Name and Address of Plant)

Unit No. 2 Commercial service date March 26.1980 Refueling outage no. 2R16 (if applicable)

Current Inspection Interal Third (3rd) Inspection Interval (1st, 2nd, 3rd. 4th, other)

Current inspection period First (1st) Inspection Period (Extended) & Second (2nd) Inspection Period (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plan 1992 Edition. Portions of 1993 Addenda Dale and revision of Inspection plan February 15.2002 / Revision I Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, test, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. NIA Expiration Date NIA (If applicable)

Signed!5 zAt -. /;; 1'3 anaoner. Proorams &Components Owner ortwner's Designee, Title Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by ABS Group Inc. of Houston, Texas have inspected the Iems described In this Owner's Activity Report, during the period August 4. 2002 to October 14.2003 ,and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connect d with this inspection.

, .1 7, n12A &4:

Fnspec or's Sign ure Commissions NB-9985. ARK-1054 'ABA - NS' National Board, State, Province, and Endorsements Date /-_6_- __

This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.

TABLE I ABSTRACT OF EXAMINATIONS AND TESTS XT*otal I tat Tufal Exa m.iniLIons Examinations Examinations Total Examinations Credited (%o) To Examination Required For Credited For This Credited (%/) For Date For The Category The Interval Period The Period Interval Remarks B-A 19 0 0.00 0.00 B-B 4 0 0.00 25.00 B-D 25 5 20.00 36.00 B-G-1 254 6 2.36 30.71 B-G-2 18 1 5.56 43.75 Code Case N-598 R-A 163 32 19.63 58.25 B-K 15 4 26.67 46.67 B-N-I 3 1 33.33 66.67 Accessible areas of the reactor vessel each period B-P 7 1 14.29 42.86 C-A 6 1 16.67 16.67 C-B 8 4 50.00 50.00 C-C 17 2 11.76 58.82 Code Case N-598 C-H 186 0 0.00 32.28 D-A 1 0 0.00 36.36 Code Case N-598 D-B 58 0 0.00 33.33 F-A 184 20 10.87 33.70 Note: Cat. R-A still needs completion of 26 RI-ISI locations by March 26, 2004. (Ist period)

Cat. C-A still needs completion of 2 inspections by March 26, 2004. (1st period)

Cat. C-H still needs completion of 2 pressure tests (partial) by March 26, 2004. (I st period)

Cat. R-A exceeds percentage requirements due to completing 63 service water inspections every period as requested by NRC.

Cat. C-B still needs completion of 2 inspections by March 26, 2004.(l st period)

Total exams credited are for the second period.

TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found Examination Item During Scheduled Section XI Category Number Item Description Flaw Characterization (IWA-3300) Examination or Test (Yes or No)

E-A El. 12 Reactor Building Liner Plate Arc Strikes No

___ ___ ____ ___ ___ ___ ___(CR-A N O 2003-l1544) N F-A F1.40 2P-89A Pump Base Skid Endplate Weld Separated Yes I__ (CR-ANO-2-2003-1216) (ISI # 88-001) 4 4 4 9

  • 9 9 4 9 9 9 9 b-I

PAGE 1 of 3 UNIT 2 INTERVAL 3 PERIOD 2 (For Cycle 16)

TABLE 3 ABSTRACT OF REPAIRS. REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR RELEVANT DATE REPAIRIREPLACEIMENT CLASS REPLACEMENT OR DESCRIPTION CONDITION FOUND COMPLETED PLN NUMIBER AND CORRECTIVE DURING MAI OR WO NUIMBER MEASURE SCHEDULED SECTION XI EXA'MINATION OR TEST(YES/NO) 2 Replacement Valve Replaced disc on 2CV4817 No 10/09/2003 Plan # 01-2123, WO 50245185 2 Replacement Valve Replaced disc on 2CV-5036-2 No 09/29/2003 Plan # 01-2164, WO 50242727 2 Replacement Valve Replaced disc on 2CV-5075-1 No 10/10/2003 Plan # 01-2165, WO 50242730 2 Replacement Valve Replaced disc on 2CV4816 No 10/06/2003 Plan # 02-2052, WO 50246705 3 Replacement Pump Replaced casing fasteners on 2P40A No 01/02/2003 Plan # 02-2093, MAI 58554 3 Replacement Valve Replaced disc on 2FP-2A No 01/02/2003 Plan # 02-2094, MAI 60127 2 Replacement Valve Replaced flange fasteners on 2PSV4835 No 10/04/2002 Plan # 02-2116, MAI 52934 3 Replacement Heat Corrected 2E47A/B foot length No 08/22/2002 Plan # 02-2129, MAI 69722 Exchanger 3 Replacement Cooling Coil Replaced 2VUC-ID. Invoked CC N416-1 No 02/08/2003 Plan # 02-2214, MAI 77074 3 Replacement Cooling Coil Installed flanges on 2VUC-1D, Invoked No 02/08/2003 Plan # 02-2215, MAI 71369 CC N416-1. Modified supports 2HCC-277-H13, 2HCC-279-H7 & 2HCC-279 H8 to facilitate 2VUC-ID replacement 3 Repair & Valve/Piping Repaired pinhole leak on valve 2SW-25A No 01/31/2003 Plan # 02-2216, MAI 76151 Replacement & replaced piping, Invoked CC N416-1 2 Replacement Pump Replaced casing fasteners on 2P-35A No 10/13/2003 Plan # 03-2012, WO 50277738 3 Replacement Valve Replaced disc on 2SW-72 No 10/06/2003 Plan # 03-2014, WO 50259220 2 Replacement Valve Replaced disc on 2S1-3A No 10/07/2003 Plan # 03-2019, WO 50245520 2 Replacement Tank Replaced inlet pipe flange studs on 2T4 No 09/30/2003 Plan # 03-2026, WO 50258723 2 Replacement Piping Installed new piping Wye fitting for No 09/17/2003 Plan # 03-2053, WO 50272646 2GCB-9-8" 2 Replacement Piping Replaced valve 2SI-7A with 8" piping, No 10/02/2003 Plan # 03-2055, WO 50266724 Invoked CC N416-1 2 Replacement Piping Replaced valve 2SI-7B with 8" piping, No 10/02/2003 Plan # 03-2056, WO 50266725 Invoked CC N-416-1 .-

I _ _ _ _ _ _ _ _ L _ _ _ _ _ _ _

PAGE 2 of 3 UNIT 2 INTERVAL 3 PERIOD 2 (For Cycle 16)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR RELEVANT DATE REPAIRIREPLACEMNIENT CLASS REPLCEMENT OR DESCRIPTION CONDITION FOUND COMPLETED PLAN NUMBER AND CORRECTIVE DURING IAT OR VO NUMBER MAMSURE SCHEDULED SECTION XI XAMIINATION OR TEST(YES/NO) 1 Replacement Valves Replaced 2CVC-1 186 & 2CVC-1 187, No 10/12/2003 Plan # 03-2065, WO 50243918 Invoked CC N-416-1 2 Replacement Valves Replaced 2CVC-22A & 2CVC-69A, No 08/15/2003 Plan # 03-2066, WO 50271356 Invoked CC N416-1 3 Replacement Piping Replaced cooling coil 2VCC-2B No 10/10/2003 Plan # 03-2070, WO 50267093 inlet/outlet flanges, Invoked CC N416-1 3 Replacement Piping Replaced cooling coil 2VCC-2A No 10/10/2003 Plan # 03-2071, WO 50267093 inlet/outlet flanges, Invoked CC N416-1 2 Replacement Valve Replaced disc on 2CV-5056-2 No 10/10/2003 Plan # 03-2073, WO 50276063 2 Repair Piping Non-welded repairs required on the new No 09/25/2003 Plan # 03-2074, WO 50272646 Wye fitting, 2GCB-9-8" 2 Repair Piping Relocated code data name plate for No 09/04/2003 Plan # 03-2075, WO 50272646 2GCB-9-6" piping 2 Replacement Support Replaced kicker on 2DCB-500-1-H003 No 09/15/2003 Plan # 03-2076, WO 50266813 1 Replacement Valve Replaced 2PSV4634 No 10/12/2003 Plan # 03-2077, WO 27991 3 Replacement Piping Pre-fabricated 2F0-0714A, Invoked CC No 1010/2003 Plan # 03-2083, WO 27811 N416-1 3 Replacement Piping Pre-fabricated 2F0-0798A, Invoked CC No 1010/2003 Plan # 03-2084, WO 27811 N 416-1 3 Replacement Piping Replaced flow orifice 2F0-1526 No 10/01/2003 Plan # 03-2085, WO 27594 1 Replacement Valve Replaced disc on 2CV465 1 No 10/13/2003 Plan # 03-2088, WO 29828 3 Replacement Piping Installed 2F0-0714A, Invoked CC N- No 10/10/2003 Plan # 03-2089, WO 27810 416-1 3 Replacement Piping Installed 2FO-0798A, Invoked CC N- No 10/10/2003 Plan # 03-2090, WO 27811 416-1 1 Replacement Pressurizer Replaced MNSA2 clamp on nozzle F4 No 10/12/2003 Plan # 03-2095, WO 50266597 for 2T-I 1 Replacement Pressurizer Replaced MNSA2 clamp on nozzle C2 No 10/12/2003 Plan # 03-2094, 'NO 50266597 for 2T-1

PAGE 3 of 3 UNIT 2 INTERVAL 3 PERIOD 2 (For Cycle 16)

CODE REPAIR, ITEM DESCRIPTION OF WORK FLAW OR RELEVANT I)ATE REPAIR/REI'LACEMENT CLASS REPLCEMIENT OR DESCRIPTION CONDITION FOUND COMPLETED PLAN NUMBER AND CORRECTIVE DURING MAI OR WO NUMBER MEASURE SCHEDULED SECTION Xi EXAMNIINATION OR TEST(YES/NO)

I Repair Vessel Non-welded repair on ICI nozzle # 83 of No 10/04/2003 Plan # 03-2096 , WO 50266596 2R-1 I Repair Vessel Non-velded repair on ICI nozzle # 84 of No 10/04/2003 Plan # 03-2097, WO 50266596 2R-1 Replacement Snubber Replaced 2CCA-24-HI9 snubber Yes 10/06/2003 Plan # 03-2106, WO 50274412 MC Repair RB Liner Plate Identified/Evaluated arc strikes No 11/06/2003 Plan # 03-2108, WO 30467 3 Replacement Support Replaced 2DBC-7-H002 welded bracket No 10/12/2003 Plan # 03-2111, WO 27811 3 Replacement Support Installed 2DBC-8-H2A No 10/12/2003 Plan # 03-2112, WO 27810 3 Replacement Piping Installed 2" half-coupling on 2HBC-106- No 10/08/2003 Plan # 03-2113, WO 30264 10" Note: Table 3 is an abstract of all Repair/Replacement activities performed during cycle 16.