Forwards Safety Insp Repts 50-277/86-21 & 50-278/86-22 on 861020-24 & Notice of Violation.Corrective Actions Stated in Util 851030 & s Adequate
ML20214K918
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/20/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20214K919 List:
References
NUDOCS 8612020510
Download: ML20214K918 (3)


See also: IR 05000277/1986021

Text

.

s

.

itDV 201986

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Report Nos. 50-277/86-21; 50-278/86-22

A routine safety inspection of your radioactive waste preparation, packaging

and shipping program was conducted by Mr. H. Bicehouse of this office on

October 20-24, 1986. Our findings were discussed with Mr. D. Smith and others

of your staff at the conclusion of the inspection on October 24, 1986.

Areas of your radioactive waste program examined during this inspection are

described in the NRC Region I Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel and obser-

vations made by the inspector.

We have reviewed the actions taken to correct the violations brought to your

attention in the enclosures to our letters, dated September 25, 1985 and

December 9, 1985. The corrective actions stated in your letters, dated

October 30, 1985 and January 7, 1986, appear to be adequate to prevent recur-

, rence.

Based on the results of this inspection, it appears that certain of your activi-

<

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed with this letter as Appendix A. These

violations have been categorized by severity level in accordance with the NRC

Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register

Notice (50 FR 47718) dated November 20, 1985 and effective February 18, 1986.

You are required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

These violations involve your failure to properly describe radionuclides con-

tained in a radioactive waste shipment and to properly classify the waste in

another shipment for burial purposes. In addition to the response described

above that you are required to provide, you are requested to review all your

radioactive waste shipments from August 1, 1985, through October 23, 1986, to

determine if other shipments were misclassified under 10 CFR 20.311 and 10 CFR

61.55. Please provide the results of this review within 60 days of the date of

0FFICIAL RECORD COPY CIR PB 86-21/22 - 0001.0.0

11/19/86

8612O20510

DR 861120

ADOCK 05000277

PDR

.- __ _ __ _ _ . . . . - . ___ .. _-. - . _ _ . _

o

- Philadelphia Electric Company 2

this letter including the identification of any other misclassified shipments

or a statement that no additional misclassified shipments were found in the

review.

The response directed by this letter and the accompanying Notice are not sub-

ject to the clearance procedures of the Office of Management and Budget as re-

quired by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

-,

Cr101221CIC"2

,

%Whi di Lbdhwf

T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I, Combined Inspection Report Nos. 50-277.86-21; 50-278/86-22

cc w/ encl:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

G. Leitch, Superintendent Nuclear Generation Division

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

local Public Document Room (LPDR)

<

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

l Commonwealth of Pennsylvania

l

l bcc w/ enc 1:

Region I Docket Room (with concurrences)

l

Management Assistant, DRMA (w/o enc 1)

'

Section Chief, DRP

, Robert J. Bores, DRSS

OFFICIAL RECORD COPY CIR PB 86-21/22 - 0001.0.1

11/19/86

'\

GW

. _. . . . . -

_ - . . . . _ . ..

-a

>

.- .

Philadelphia Electric Company 3

.

1

.

!

!

2

A

4

,

i

!

!

m

l

.

i

!

l

hl.hh$-

R1:DRSS

__ _

. ,

f0

R]ARSS RI:fDRSS

j Bicehouse/emw P#sdiak Bellamy

t

i 11/19/86 11/l0/86 11/l9/86

l

OFFICIAL RECORD COPY CIR PB 86-21/22 - 0002.0.0

11/19/86

l

!

- __

.-. - - --. - ._-.-- . . . . _ , , . . _ . - - , - -_ - - - - ,_ - - -._,, ----- ..-.-.-..-. -