Forwards Safety Insp Repts 50-277/85-03 & 50-278/85-03 on 850107-11 & Notice of Violation
ML20126E938
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/31/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20126E942 List:
References
NUDOCS 8506170263
Download: ML20126E938 (2)


See also: IR 05000277/1985003

Text

r1

e

MAY 311985

! Docket Nos. 50-277

50-278

,

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

l 2301 Market Street

'

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Nos. 50-277/85-03 and 50-278/85-03

This refers to the routine safety inspection conducted by Mr. N. Terc of this

office on January 7-11, 1985 at the Peach Bottom Station, Delta, Pennsylvania,

and to the discussions of our findings held with Mr. N. Tere and other members

of your staff at the conclusion of the inspection.

? Areas examined during this inspection are described in the NRC Region I In-

spection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

.

records, interviews with personnel, and observations by the inspectors.

!

! Based on the results of this inspection, it appears that two of your activities

were not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A. These violations

have been categorized by severity level in accordance with the revised NRC

Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register

Notice (49 FR 8583) dated March 8, 1984. You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

The response directed by this letter and the accompanying Notice are not sub-

ject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signad By:

87  ! -

T

Thomas T. Martin, Director

Division of Radiation Safety

g 61 g g g50 y and Safeguards

G PDR

OFFICIAL RECORD COPY IR PEACH BOTTOM 85-03 - 0001.0.0

,

05/06/85 (. h

L

7 533' .

I' ,

.o

Philadelphia Electric Co. 2

l

Enclosure:

1. Appendix A. Notice of Violations

2. Combined NRC Region I Inspection Report Nos. 50-277/85-03 and 50-278/85-03

cc w/ encl:

. R. S. Fleischmann, Station Superintendent

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner', Jr., Esquire (Without Report)

A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic

Electric

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

Public Documdnt Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

.bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

Section Chief, DRP

l

1

RI:0RS RI:DRSS RI:DRSS

Hawxhu <[fi

f Harpster Vito @

05/db /85 05/$o/85 05/Lf/85

0FFICIAL RECORD COPY IR PEACH BOTTOM 85-03 - 0001.1.0

05/06/85

f