IR 05000424/1988019: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20154B355
| number = ML20196C264
| issue date = 05/10/1988
| issue date = 06/13/1988
| title = Proposes Mgt Meeting on 880519 in Region II Ofc to Discuss 880314 Ltr Re Security Program & Organization,Per Safeguards Insp 50-424/88-19.NRC Still Concerned W/Site & Mgt Attention to Resolving Issue of Vital Area Barrier Integrity
| title = Partially Withheld Insp Repts 50-424/88-19 & 50-425/88-19 on 880425-29 (Ref 10CFR2.790(d) & 10CFR73.21).Violations Noted. Major Areas Inspected:Corrective Actions to Previous Enforcement Issues & Readiness of Unit 2
| author name = Grace J
| author name = Kirby J, Mcguire D, Thompson D, Tillman A, Tobin W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Mcdonald R
| addressee name =  
| addressee affiliation = GEORGIA POWER CO.
| addressee affiliation =  
| docket = 05000424
| docket = 05000424, 05000425
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8805170157
| document report number = 50-424-88-19, 50-425-88-21, NUDOCS 8807010045
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| package number = ML20196C262
| page count = 2
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
}}


Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:___ --
{{#Wiki_filter:
,. ~ :      grE/A/-
. MAY 101988 Docket Nos. 50-424, 50-425 License Nos. NPF-68, CPPR-109
, Georgia Power Company ATTN: Mr. R. P. Mcdonald Executive Vice President for Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT: NOTICE OF MANAGEMENT MEETING During our most recent safeguards inspection at Plant Vogtle, (50-424/88-19, April 25 - 29, 1988) we were pleased to note several improvements within your security program and organization. It appears that your Vogtle security staff
, has made a positive impact in correcting many of the vulnerabilities specified in our previous enforcement correspondenc We still remain concerned with site and corporate management attention to t resolving the issue of vital area barrier integrity. . Your March 14, 1988, letter relative to this topic was reviewed during the April inspection, and your staff was informed of our disagre m ent with the conclusion of the lette In particular, you did not inspect a large number of areas because you categorized them as "inaccessible" for one reason or another. We disagree with that categorization and believe they should have been included in your original
<
program. We were advised by your staff.that the matter was receiving priority reassessmen It appears to us that a management meeting is appropriate to discuss your March 14 letter; additionally, the large number of unsecured vital area doors will be addressed. These two items were identified in our Exit Meeting held on April 29, 1988. We propose to hold this meeting on May 19, 1988, at 10:00 in our office, e
l If we can be of further assistance in this matter, please do not hesitate to contact us.
 
!   
 
Sincerely, q p J. Nelson Grace n
cc: (See page 2)
8805170157 890510 PDR ADOCK 05000424 O  DCD    )
u
 
,--
-
,.      MAY 101988
, .-
Georgia Power Company  2 cc: P. D. Rice, Vice President, Project Director C. W. Hayes, Vogtle Quality Assurance Manager G. Bockhold, Jr., General Manager, Nuclear Operations L. Gucwa, Manager, Nuclear Safety and Licensing J. A. Bailey, Project Licensing Manager B. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge D. Kirkland, III, Counsel, Office of the Consumer's Utility Council D. Feig, Georgians Against Nuclear Energy bec: E. Reis, 0GC J. Hopkins, NRR M. Sinkule, RII DRS, Technical Assistant NRC Resident Inspector Document Control Desk State of Georgia c i
    />fs cn ;>
e
    " #c'A
    '
/
RIlh(  I RJ,q
  ,
RII
  ;pyc RII
    .
RIeyesf RI
    - J RII WTobin i juire Cline . MSinkule  Kins MENT 5/4/88  5/k/88'53Stohr5/c[/88 5/w/88  5/f/88r 5/6 /88
    '
5/}/88  r. ., , .
f/88
      !
}}
}}

Revision as of 12:25, 5 November 2020

Partially Withheld Insp Repts 50-424/88-19 & 50-425/88-19 on 880425-29 (Ref 10CFR2.790(d) & 10CFR73.21).Violations Noted. Major Areas Inspected:Corrective Actions to Previous Enforcement Issues & Readiness of Unit 2
ML20196C264
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/13/1988
From: Kirby J, Mcguire D, Thompson D, Tillman A, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20196C262 List:
References
50-424-88-19, 50-425-88-21, NUDOCS 8807010045
Download: ML20196C264 (1)


Text