MONTHYEARML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days ML20140B3951997-05-21021 May 1997 Notice of Violation from Insp on 970316-0426.Violation Noted:Between 970329 & 0404,numerous Examples of Unattended & Unevaluated Debris Have Been Identified & Eight EPIP Revs Had Not Been Distributed ML20138J4161997-04-25025 April 1997 Notice of Violation from Insp on 970210-0307.Violation Noted:Licensee Offered for Transportation by exclusive-use, Closed Transport Vehicle,Package Which Arrived Having Max Surface Radiation Levels Exceeding 10 Msv/Hr ML20137X3751997-04-14014 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:Positions of Valves 2-1302-U4-180 - 185 Not Verified Every 31 Days as Required ML20137T6731997-04-0404 April 1997 Notice of Violation from Insp on 970303-07.Violation Noted:Plant Security Response Plan Rev 3 Phase 2 Defined Deployment Strategy That Allowed CAS to Be Left Unmanned During Contingency ML20137T0521997-03-25025 March 1997 Notice of Violation from Insp on 961222-970201.Violations Noted:Licensee Failed to Implement Procedures 11429-1 & 11429-2 in That Breakers Were Improperly Positioned ML20134H1391997-01-17017 January 1997 Notice of Violation from Insp on 961110-1221.Violation Noted:On 961205,measures Assuring That Nonconformances Were Promptly Identified & Corrected Were Not Established as Evidence by Insp of Safety Related IE 480 Volt ML20133F5451996-12-31031 December 1996 Notice of Violation from Insp on 960929-1109.Violation Noted:Licensee Failed to Maintain Two Independent ECCS Subsystems Operable & Provisions of TS 3.5.2 Action Statement Were Not Met ML20149M5331996-12-0505 December 1996 Notice of Violation from Insp on 960929-1109.Violation Noted:Plant Equipment Clearances Not Properly Installed & Maintained IAW Designated Hold Tag Positions & Failure to Properly Perform Surveillance Procedure 14900-C ML20134F0071996-10-28028 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:On 960916-18,CROs Failed to Detect That Valve 1-HV-8220 RCS Hot Leg Post Accident Sampling Sys Sample Isolation Valve in Incorrect Position ML20134C5241996-09-16016 September 1996 Notice of Violation from Insp on 960707-0817.Violation Noted:Control Room Operators Failed to Detect That Containment Isolation Valve Incorrectly Positioned,Improper Storage of Ion Exchange Resins & Lacked Combustible Permit ML20129G4321996-05-29029 May 1996 Notice of Violation as Result of Secretary of Labor Decisions & 1120.Violation Noted:Util Discriminated Against Mb Hobby as Result of Engagement in Protected Activities in Jan & Feb 1990 IR 05000425/20060121995-07-12012 July 1995 Notice of Violation from Insp on 950425-0612.Violation Noted:Licensee Failed to Submit to Written Rept Describing Local Leak Rate Test Failures Which Exceeded TS Type B & C Leakage Limits During 1994 Unit 3 Refueling Outage ML20128G3171994-05-31031 May 1994 Partially Withheld NOV from Insp on 900806-17.Violation Noted:As of 900409,1B DG Had Only 12 Consecutive Successful Starts W/O Problems or Failures Rather than 19 as Stated by Gpc.Same Inaccuracy Presented at Presentation on 900409 ML20059B2071993-12-22022 December 1993 Notice of Violation from Insp on 931129-1203.Violation Noted:Licensee Failed to Notify Commission of Change in Medical Status of Operator within 30 Days as Required by 10CFR55.25 & 10CFR50.74 ML20059B5471993-12-14014 December 1993 Notice of Violation from Insp on 931024-1120.Violation Noted:Maint Personnel Failed to Follow Procedure 14900-2 in That Data Sheet 2 of Procedure Completed Indicating Visual Containment Insp Performed W/O Discrepancies ML20058J2301993-11-17017 November 1993 Notice of Violation from Insp on 930919-1023.Violation Noted:Licensee Failed to Perform Required TDAFW Pump Surveillance Requirement Associated W/Ts 3.7.1.2 Prior to Entry of Unit 2 Into Mode 2 on 931018 ML20057E7911993-10-0101 October 1993 Notice of Violation from Insp on 930830-0903.Violation Noted:Licensee Failed to Log Operational Data & Investigate Significant Discrepancies in Run Times for Approx 50 & 60 Operational Events for Trains a & B ML20056G8481993-08-23023 August 1993 Notice of Violation from Insp on Stated Date.Violation Noted:Licensee Failed to Issue Transient Combustible Permit for Flammable Liquids Storage Cabinet Located in safety-related Bldg ML20046B7981993-07-23023 July 1993 Notice of Violation from Insp on 930510-0611.Violation Noted:Licensee Design Control Measures Did Not Assure Accuracy of Design Calculation,Equipment Qualifications & FSAR Design Info ML20036C3531993-05-25025 May 1993 Notice of Violation from Insp on 930328-0501.Violation Noted:Design Change Package & Other Ref Matls Not Adequately Reviewed as Part of Corrective Action to Troubleshoot Illuminated Bistable Light on Main Control Board ML20044G2181993-05-17017 May 1993 Notice of Violation from Insp on 930418-0508.Violation Noted:Procedure 13503-1 Was Inadequate,In That It Did Not Contain Appropriate Instructions to Operators ML20036A1261993-04-21021 April 1993 Notice of Violation from Insp on 930228-0327.Violation Noted:Procedures Not Implemented as Required by TS 6.7.1a & 6.7.1f ML20127K0091993-01-0606 January 1993 Notice of Violation from Insp on 921130-1204.Violation Noted:Licensee Failed to Follow Procedures in Accordance W/ TS 6.10.1 in That Licensee Failed to Conduct First Quarter Containment Purge Monitor Sampling & Comparison ML20126L3121992-12-30030 December 1992 Notice of Violation from Insp on 921130-1205.Violation Noted:Failure of EDG 1A to Start on 921118 Not Considered Valid,Reported to Mgt,Nor Corrective Actions Implemented ML20129J1361991-02-0505 February 1991 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Licensee Failed to Provide Adequate Protection for Documents & Matls Containing Safeguards Info as Evidence by Listed Examples ML20024F8481990-12-13013 December 1990 Notice of Violation from Insp on 901027-1123.Violation Noted:Failure to Follow Procedure That Led to ESF Actuations Which Placed Plant in Unplanned Configuration ML20058F6691990-10-25025 October 1990 Notice of Violation from Insp on 900825-0928.Violation Noted:Procedure 13145-2 Inadequate ML20129J0431990-10-0101 October 1990 Draft NOV from Insp on 900806-17.Violation Noted:Licensee Provided Inaccurate Info to Insp Team on Three Separate Occasions ML20059H3391990-08-29029 August 1990 Notice of Violation from Insp on 900730-0803.Violation Noted:Emergency Operations Facility & Simulator Control Room Incomplete or Not Maintained in up-to-date Manner ML20055H3521990-06-27027 June 1990 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Safeguards Storage Cabinet Containing Documents,Including Physical Security & Contingency Plan,Discovered Unsecured & Unattended ML20058G4101990-06-14014 June 1990 Notice of Violation from Insp on 900331-0518.Violation Noted:Failure to Follow Engineering Procedure by Allowing Air Bubble to Develop in RCS Tygon Tube Level Indicator Which Caused RCS Level to Read Higher than Actual ML20042F2521990-04-26026 April 1990 Notice of Violation from Insp on 900217-0330.Violation Noted:W/Unit 1 in Mode 5 & RCS Level at 195 Ft 5 Inches, Valve 1-1208-U4-176 Closed But Not Mechanically Secured in Closed Position ML20006D7531990-02-0101 February 1990 Notice of Violation from Insp on 891202-900105.Violation Noted:Checks & Insps Not Performed to Verify Operational Readiness & Completeness of safety-related Sys While Repairing Class 1E 125-volt Dc Power Sys ML20005E6471989-12-29029 December 1989 Notice of Violation from Insp on 891028-1201.Violation Noted:Administrative Procedure 00101-C & Engineering Procedure 50009-C Not Implemented in That Critical Control Room Drawings & Attendant as-built Notices Existed ML19354D6151989-12-19019 December 1989 Notice of Violation from Insp on 891030-1103 & 1113-17. Violation Noted:Porv Channel Calibrs Did Not Fully Test Portions of Both Channels That Actuate Automatically on High Pressure Signal Causing Channel Not to Calibr ML19353B1221989-11-24024 November 1989 Notice of Violation from Insp on 891030-1103.Violation Noted:Backlog of 158 Validation Evaluations for Out of Calibr Measuring Equipment Identified ML19325D6061989-10-13013 October 1989 Notice of Violation from Insp on 890819-0915.Violation Noted:Improper Certification Occurred on 890523,in That Certification Not Based on Correct Copy of Physician Determination 1999-03-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR ML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-032, on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss1998-06-10010 June 1998 PNO-II-98-032:on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead1998-03-20020 March 1998 PNO-II-98-017:on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20198M3681998-01-12012 January 1998 Notice of Deviation from Insp on 971102-1213.Deviation Noted:Since Initial Startup of Both Units 1 & 2,licensee Failed to Perform 18-month Surveillance Testing on Reactor Coolant Pump 125V Direct Current non-1E Control Breakers IR 05000424/19970111998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C IR 05000424/19970991997-09-15015 September 1997 SALP Repts 50-424/97-99 & 50-425/97-99 for Vogtle Electric Generating Plant for 960128-970802 IR 05000424/19970071997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 IR 05000424/19970081997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20210N6521997-08-14014 August 1997 Notice of Deviation from Insp on 970623-27.Deviation Noted: Incidents or Events Associated W/Ufsar Section 17.2.1.1.1.F & H Were Not Reviewed on 961218 & 970430 Srb Meetings ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days ML20140B3951997-05-21021 May 1997 Notice of Violation from Insp on 970316-0426.Violation Noted:Between 970329 & 0404,numerous Examples of Unattended & Unevaluated Debris Have Been Identified & Eight EPIP Revs Had Not Been Distributed ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20138J4161997-04-25025 April 1997 Notice of Violation from Insp on 970210-0307.Violation Noted:Licensee Offered for Transportation by exclusive-use, Closed Transport Vehicle,Package Which Arrived Having Max Surface Radiation Levels Exceeding 10 Msv/Hr ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137X3751997-04-14014 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:Positions of Valves 2-1302-U4-180 - 185 Not Verified Every 31 Days as Required ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137T6731997-04-0404 April 1997 Notice of Violation from Insp on 970303-07.Violation Noted:Plant Security Response Plan Rev 3 Phase 2 Defined Deployment Strategy That Allowed CAS to Be Left Unmanned During Contingency ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20137T0521997-03-25025 March 1997 Notice of Violation from Insp on 961222-970201.Violations Noted:Licensee Failed to Implement Procedures 11429-1 & 11429-2 in That Breakers Were Improperly Positioned ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1391997-01-17017 January 1997 Notice of Violation from Insp on 961110-1221.Violation Noted:On 961205,measures Assuring That Nonconformances Were Promptly Identified & Corrected Were Not Established as Evidence by Insp of Safety Related IE 480 Volt ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support 1999-08-16
[Table view] |
Text
-
i NOTICE OF VIOLATION l
Southern Nuclear Operating Company, Inc.
Docket N& 50-424 and 50-425 i
Vogtle Electric Generating Plant License Nos. NPF-68 and NPF-81 Units 1 and 2 During an NRC inspection conducted February 2, 1997, through March 15, 1997, violations of NRC requirements were identified.
In accon W ce with the
" General Statement of Policy and Procedure for NRC Enforunent Actions,"
(NUREG 1600), the violations are listed below:
A.
Technical Specification (TS) Surveillance Requment (SR) 3,7.5,1, Auxiliary Feedwater System, requires that each manual valve in each l
water flow path for the three auxiliary feedwater (AFW) pumps that is l
not locked, sealed or otherwise secured in position be verified in the l
correct position every 31 days.
Contrary to the above, from October 5, 1996, until February 6, 1997, the l
positions of valves 2-1302-U4-180 through -185 were not verified every 31 days as required. These six valves are in the AFW pump recirculation flow paths.
This is a Severity Level IV violation (Supplement I).
l This violation is applicable to Unit 2 only.
l B.
Technical Specification Section 5.4.1.d. Fire Protection Program, states l
that written procedures shall be established, implemented, and j
maintained covering the fire protection program.
Paragraph 2 G of the operating license for Units 1 and 2 requires the licensee to implement and maintain in effect all provisions of the approved fire protection arogram as described in the Updated Final Safety Analysis Report (U:SAR).
UFSAR Table 9.5.1-10 Item 1.4.1 states that each required fire detection instrument which is accessible during plant operation shall'be demonstrated operable at least once per 12 months by performance of a trip actuating device operational test.
Procedures 29227-1 and -2, Fire and Smoke Detector Operational Test l
(Panel LZIP 2-1813-03-F27), Revision 1, and 29231-1 and -2, Fire and Smoke Detector Operational Test (Panel LZIP 1-1813-03-F31), Revision 2.
require that operational tests on the fire detection panel and fire i
detectors be performed once every 24 months on a staggered test basis, l
thus implementing the 12-month performance test required by UFSAR i
Table 9.5.1-10.
1 Contrary to the above, the time between operational tests for the fire detectors supplied by Panels LZIP 1-1813-03-F31 and LZIP 2-1813-03-F27 i
exceeded 12 months.
Specifically. the time between the February ll, i
9704220014 970414
?
PDR ADOCK 05000424 G
PDR E
Notice of Violation 2
1996, and June 17. 1994 tests for Panel LZIP 1-1813-03-F31 was approximately 19 months and 11-days and the time between the January 22.
j 1997, and November 1. 1994, tests for Panel LZIP 2-1813-03-F27 was approximately 25 months and 22 days.
This is a Severity Level'IV violation (Supplement I)
C.
10'CFR 50.71(e) states, in part, that each person licensed to operate a nuclear power reactor shall update aeriodically the UFSAR to assure that the information included contains t1e latest material developed. The updated UFSAR shall be revised to include the effects of all changes made to the facility and the analysis of new safety issues performed.
Revisions to the UFSAR must be filed annually or six months after each refueling outage provided that the successive updates to the UFSAR does not exceed 24 months.
Procedure 00402-C. Licensing Document Change Request (LDCR),
Revision 15. provides instructions for changes to licensing documents.
(The current 3rocedure is Revision 15: however, the following-requirements lave existed for several years and were in effect on the date when the required UFSAR changes were identified.) Section 2.2 of this procedure requires a form, similar to that of Figure 1 of the procedure, to be used to initiate a change, document the change, and approve requests for changes to-licensing documents.
Section 3.3
)
requires the originator of an LDCR to complete applicable portions of the LDCR form, describe the proposed change, provide justification for the change and identify other affected documents.
Section 3.4 requires the originating department manager to assign a qualified individual to perform the necessary supporting evaluations for the LDCR.
Contrary to the above, required 10 CFR 50 A]pendix R related changes to the UFSAR were identified by the licensee Jut an LDCR form was not initiated by the problem identifiers, su> porting evaluations for the changes were not developed, and the UFSAR was not revised to reflect actual as-built plant conditions related to Appendix R safe shutdown issues.
In addition, several other issues were also identified in which an appropriate LDCR form was not 3repared to perform the required safety review and make the appropriate clanges to the UFSAR or cther licensing related documents.
This is a Severity Level IV violation (Supplement I)
D.
10 CFR 50. Appendix B. Quality Assurance Criteria.Section III. Design Control, requires the licensee to, in part, provide design control measures for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods or by the performance of a suitable testing program.
Notice of. Violation 3
Contrary to the above, the licensee did riot verify the adequacy of the Woodward Governor Company (WGC) 701 Digital Speed Control (DSC) design by the performance of an acceptable design review or by the performance of a suitable testing program.
Several deficiencies had been identified by vendor program deficiency notices dated September 13. 1993. Also.-
inconsistencies between the original start up setpoint data, dated September 30, 1994. and setpoints downloaded from the Train 1A diesel generator as.well as DSC calibration constants recorded on March 24, 1
1996, compared to data downloaded from the Train 1A diesel generator were noted.
This is a Severity Level IV violation (Supplement I)
E.
10 CFR 50. Appendix B. Quality Assurance Criteria.Section XVII. Quality Assurance Records, requires the licensee to in part, maintain records to furnish evidence of activities affecting quality.
The records shall include at least the following:
Operating logs and the results of reviews, inspections. tests, audits.' monitoring of work performance and materials analyses.
Contrary to the above, the licensee failed to maintain records of safety-related equipment settings and calibration constants under configuration control in that there was no record of accessing the 701 DSC settings since September 30, 1994, resulting in-discrepancies between the current 701 DSC setpoints for the Train 1A Diesel Generator and the setpoints contained in the test data sheets.
This is a Severity Level IV violation (Supplement I) i F.
10 CFR 50.59. Changes, tests, and ex)eriments, in part, prohibits, the licensee from making any change whic1 constitutes an unresolved safety question.
Contrary to the above, the licensee's 10 CFR 50.59 safety evaluation associated with Design Change Package (DCP) 93-V1N0050-0-1 dated February 28. 1994, and supporting documentation did not provide an acceptable basis to conclude that the 701 governor modification does not create a possibility for a malfunction of a different type than any i
previously evaluated in the FSAR.
This is a Severity Level IV violation (Supplement I) 4 Pursuant to the provisions of 10 CFR 2.201 Southern Nuclear Operating Company. Inc. is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk.
Washington, D.C. 20555 with a copy to the Regional Administrator Region II, and a copy to the NRC Resident Inspector Vogtle, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if
Notice of Violation 4
contestsd. the basis for disputing the violation. (2) the corrective steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further violations. and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order or demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.
Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible it should not include any personal privacy 3roprietary, or safeguards information so that it can be placed in the PDR wit 1out redaction.
However, if you find it necessary to include such information, you should clearly indicate the specific information that you desire not to be placed in the PDR, and provide the legal basis to support your request for withholding the information from the public.
Dated at Atlanta Georgia this 14th day of April 1997