ML20196C255

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/88-19 & 50-425/88-21 on 880425-29.Notice of Violation & Rept Details Withheld (Ref 10CFR2.790(d) & 10CFR73.21)
ML20196C255
Person / Time
Site: Vogtle  
Issue date: 06/21/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
GEORGIA POWER CO.
Shared Package
ML20196C262 List:
References
NUDOCS 8807010044
Download: ML20196C255 (2)


See also: IR 05000424/1988019

Text

"'

mFEGUARDS INFORMA fiON

JU N 211988

Docket Nos. 50-424, 50-425

License Nos. NPF-68, CPPR-109

Georgia Power Company

ATTN:

Mr. R. P. Mcdonald

Execntive Vice President -

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-424/88-19 AND 50-425/88-21)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. Tobin on April 25-29, 1988. The inspection included a review of activities

authorized for your Plant Vogtle facility. This also refers to the management

meeting held in our office on May 19, 1988, during which we discussed your

program for completing the verification of all vital area barriers and your

corrective measures to assure all vital area portals remain secure. A summary

of that meeting is enclosed as part of this inspection report.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violations, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure. Therefore, the enclosures

to this letter with the exception of the report cover page, which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject.to the

clearcnce procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this le+.ter, please contact us.

Sincerely,

J. Nelson Grace

Regional Administrator

Enclosures:

(See page 2)

. ..t. cat c0HTAINS

',7r.,mpos iropnATION

. tpA I 14 'D'3 [

880

SAFEGUARDS INFORMATION

';-

'

i

'

-

0'*701oo4A 80888%

lE-Oh

'\\

  • oc

DCD

'

SAFEGUARDS INFORMA

'

'

2

.

{/g g y 1989

Georgia Power Company

Enclosures:

1.

Notice of Violation

(Safeguards Information)

2., NRC Inspection Report

(Safeguards Information)

cc w/encis:

P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr. , General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Manager

cc w/o encis:

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

bec w/encis:

NRR/DRIS/SB

bec w/ Inspection Summary:

NRC Resident Inspector

Document Control Desk (RIDS IE04), 016

State Georgia

"iLOLUEC cGNTAINS

3'SGUARDS J ?:7 ppJ1ATION

M'ON SEPARA7h.4 ritis

T' AGE IS DECe?! TROLLED.

RII(I

h

% V'

RII,

RI

RII

RI

'

,

l

gWTobin:tm

ompson

Ai

n

JXilr y

DM Guire

C

l

$/ (0/88

/ (0 /88

i 88

07/c)/88

Q)/ /1/88

0

/88

D

47

P/

'

'

,

[

RII

RI{

RII

/

RII

L'

RII

RII (2

%b

4

LRey,e]s&3 [i

>

pp,Sinkule

[VB

lee

JSto d

GJenki

st

M

l

1

0F

/88

06/ p /88

[ 06/ /7 /88

05/h /88

06/lj/88

/ M /88

SAFEGUARDS INFORMATION