ML20195B512: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:_ _ .  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
      * *
  y                                                                                                                                ,
          .      . .
            .
<.
                                            OCT 2 01989
                          -
                                                                                                                                  ),
                                                                        ''
            Docket No. 50-353
            Philadelphia Electric Company
            ATTN:    C. A. Mc Neill
                      Executive Vice President - Nuclear
            2301 Market Street
            Philadelphia, PA 19101
                                                                                -v.4 ,
            Gentlemen:
            Subject:    Inspection Report No. 50-353/88-22
            This letter refers to the routine, safety inspection conducted by
            Mr. H. F. van Kessel of this of fice on September 12-23, Ifue ,it Limerick
            Nuclear Generating Station Unit 2 of activities authorized L; FRC 1icense
            No. CPPR-107. Mr. van Kessel discussed the results of the in2pection with
            Mr. W. T. Ullrich and other members of your staff at the conclusion of the                                            '
            inspection.
            Areas examined during this inspection are described in the NRC Region I                                              ,
            Inspection Report which is enclosed with this letter. Within these areas,
            the inspection consisted of selective examination of procedures and represen-
            tative records, interviews with personnel, and observations by the inspector.
            Within the scope of this inspection, no violations were observed.
            No reply to this letter is raquired. Your cooperation with us in this matter
            is appreciated.                                                                                                      l
                                                                                                                                  -
                                                              Sincerely
                                                                                                                                  I
                                                            Orici.tal cica:! D78                                                !
                                                                                                                                  !
                                                              L. B. Marsh                                                        i
                                                              Acting Chief. Engineering Branch                                    !
                                                              Division of Reactor Safety                                          *
            Enclosure: NRC Region ! Inspection Report No. 50-353/88-22                                                            i
                                                                                                                                  r
                                                                                                                                  l
                                                                                                                                  [
                                                                                                                                  !
    .
                                                                                                                                  l
                                                                                                                                    l
                                                                                                                                  '
                                        OFFICIAL RECC?.D COPY      IR LIM 2 88-22 - 0001.0.0
                ,
                                                                    10/12/88
              G81102OO58 GG1020
              PDR
              0      frDOCN050DQ"f                                                1.-V\Cl
                                                                                                                            __ J
 
                                                                                        -  ---  - - - - - _ - -
                                                                                                                _,
    . .
        .-        .
                      . .                        OCT 2 01988
's            Philadelphia Electric Company            2                                                            i
                                                                                                                    I
            cc w/er.c1:
            John S. Kemper, Sr., Senior Vice President
              S. Joseph Kowalski, Vice President, Nuclear Engineering
            W. T. Ullrich, Superintendent, Limerick 2 Project
            J. M. Corcoran, Quality Assurance Manager
            Graham M. Leitch, Vice President, Limerick Generating Station
            J. W. Gallagher, Vice President - Nuclear
            Troy B. Conner, Jr., Esquire
              Eugene J. 2radley, Esquire, Assistant General Counsel
            Dave Honan'
              Public Document Room (PDR)
              Local Public Document Room (LPDR)
            Nuclear Safety Information Center (NSIC)
            NRC Resident Inspector
            Commonwealth of Pennsylvania
            bec w/ enc 1:
              Region I Docket Room (with concurrences)
            Management Assistant, DRMA (w/o enc 1)
              Section Chief, DRP
              Robert J. Bores, DRSS                                              - ' -
                    '
                                                                  4%
              RI:DRS                    RI :    S        RI:DRS
              van Kessel/pab/rw        Ea                Marsh
              10/0 /88                  10////88          10/6/88
'                  Wl                  0FFICIAL RECORD COPV          IR LIM 2 88-22 - 0002.0.0
]                                                                      10/12/88
  "
        _ . - _ .        _
                                -    _  .  -_        -
                                                              --.
                                                                    .
}}
}}

Latest revision as of 00:23, 17 December 2020

Forwards Safety Insp Rept 50-353/88-22 on 880912-23.No Violations Noted
ML20195B512
Person / Time
Site: Limerick Constellation icon.png
Issue date: 10/20/1988
From: Marsh L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20195B517 List:
References
NUDOCS 8811020058
Download: ML20195B512 (2)


See also: IR 05000353/1988022

Text

_ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

  • *

y ,

. . .

.

<.

OCT 2 01989

-

),

Docket No. 50-353

Philadelphia Electric Company

ATTN: C. A. Mc Neill

Executive Vice President - Nuclear

2301 Market Street

Philadelphia, PA 19101

-v.4 ,

Gentlemen:

Subject: Inspection Report No. 50-353/88-22

This letter refers to the routine, safety inspection conducted by

Mr. H. F. van Kessel of this of fice on September 12-23, Ifue ,it Limerick

Nuclear Generating Station Unit 2 of activities authorized L; FRC 1icense

No. CPPR-107. Mr. van Kessel discussed the results of the in2pection with

Mr. W. T. Ullrich and other members of your staff at the conclusion of the '

inspection.

Areas examined during this inspection are described in the NRC Region I ,

Inspection Report which is enclosed with this letter. Within these areas,

the inspection consisted of selective examination of procedures and represen-

tative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is raquired. Your cooperation with us in this matter

is appreciated. l

-

Sincerely

I

Orici.tal cica:! D78  !

!

L. B. Marsh i

Acting Chief. Engineering Branch  !

Division of Reactor Safety *

Enclosure: NRC Region ! Inspection Report No. 50-353/88-22 i

r

l

[

!

.

l

l

'

OFFICIAL RECC?.D COPY IR LIM 2 88-22 - 0001.0.0

,

10/12/88

G81102OO58 GG1020

PDR

0 frDOCN050DQ"f 1.-V\Cl

__ J

- --- - - - - - _ - -

_,

. .

.- .

. . OCT 2 01988

's Philadelphia Electric Company 2 i

I

cc w/er.c1:

John S. Kemper, Sr., Senior Vice President

S. Joseph Kowalski, Vice President, Nuclear Engineering

W. T. Ullrich, Superintendent, Limerick 2 Project

J. M. Corcoran, Quality Assurance Manager

Graham M. Leitch, Vice President, Limerick Generating Station

J. W. Gallagher, Vice President - Nuclear

Troy B. Conner, Jr., Esquire

Eugene J. 2radley, Esquire, Assistant General Counsel

Dave Honan'

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

Robert J. Bores, DRSS - ' -

'

4%

RI:DRS RI : S RI:DRS

van Kessel/pab/rw Ea Marsh

10/0 /88 10////88 10/6/88

' Wl 0FFICIAL RECORD COPV IR LIM 2 88-22 - 0002.0.0

] 10/12/88

"

_ . - _ . _

- _ . -_ -

--.

.