IR 05000416/1985045: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20154L203
| number = ML20154L203
| issue date = 03/04/1986
| issue date = 03/04/1986
| title = Ack Receipt of 860214 Ltr Informing NRC of Steps Taken to Correct Violation & Deviation Noted in Insp Rept 50-416/85-45.Response Meets Requirements of 10CFR2.201
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violation & Deviation Noted in Insp Rept 50-416/85-45.Response Meets Requirements of 10CFR2.201
| author name = Walker R
| author name = Walker R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8603110419
| document report number = NUDOCS 8603110419
| title reference date = 02-14-1986
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1

Latest revision as of 05:59, 10 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violation & Deviation Noted in Insp Rept 50-416/85-45.Response Meets Requirements of 10CFR2.201
ML20154L203
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/04/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
References
NUDOCS 8603110419
Download: ML20154L203 (1)


Text

id f

MAR 4 1988

' Mjssissippi Power and Light Company t4TTN: Mr. O. D. Kingsley, J Vice President, Nuclear Operations P. O. Box 23054 Jackson, MS 39205 i i

Gentlemen:

SUBJECT: REPORT NO. 50-416/85-45

Thank you for your response of February 14, 1986, to our Notices'of Violation and Deviation, issued on January 15, 1986, concerning activities conducted at your Grand Gulf facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your !

corrective actions during future inspection We appreciate your cooperation in this matte (

l

Sincerely,

,

original Signed by Roger D. Walker Roger D. Walker, Director Division of Reactor Projects cc: d H. Cloninger, Vice President, Nuclear Eng & Support

'

A . E. Cross, General Manager ,

, L. F. Dale, Director, Nuclear Licensing I

,

and Safety

'

!

vR. T.-Lally, Manager of Quality Assurance ,

Middle South Services, In v R. B. McGehee, Esquire Wise, Carter, Child, Steen and Caraway X $. Reynolds, Esquire Bishop Liberman, Cook, Purcell

. & Reynolds  !

&R. W. Jackson, Project Engineer LC(R. Hutchinson, GGNS General '

Manager l

bec:LNRC Resident Inspector  ;

Document Control Desk State of Mississippi RII RI! RI ,

er HDa(ce VP nciera 2/#tr/86 2L4 /86 g f/86 31g a m PD /0 180l