Approves Scheduled Implementation of Dcrdr Mods by 920731 (Fifth Refueling Outage)
ML20062B168
Person / Time
Site: Grand Gulf 
Issue date: 10/19/1990
From: Kintner L
Office of Nuclear Reactor Regulation
To: Cottle W
ENTERGY OPERATIONS, INC.
References
TAC-56127, NUDOCS 9010240083
Download: ML20062B168 (3)


Text

_ _ _ _.. _

October 19,1990

,. Dock'et No. 50-416 Mr. William T. Cottle

.Vice President, Operations GGNS Entergy Operations, Inc.

Post Office Box 756 Port Gibson, Mississippi 39150

Dear Mr. Cottle:

SUBJECT:

IMPLEMENTATION SCHEDULE FOR DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR) MODIFICATIONS - GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. 56127)

By letter dated September 26, 1990, Entergy Operations, Inc. (the licensee) submitted a DCRDR Supplemental Summary Report for Grand Gulf Nuclear Station, Unit 1, including a schedule for correcting all safety related human engineering deficiencies (HEDs). ' All safety related HEDs are scheduled to be corrected by the end of the current outage that began October 1990, except for one HED that is scheduled to be corrected by the end of the fifth refueling outage (July 31, 1992).

The staff has made a cursory review of this submittal and concludes that it fulfills the commitment made to provide a Supplemental Summary Report.

The staff approves the scheduled implementation of corrective actions by July 31, 1992.

Sincerely, Original signed by Lester L. Kintner, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION

. Docket @ileJ7 L. Kintner NRC PDR OGC MS15B18 Local PDR E.-Jordan MNBB 3701 PD4-1 Reading J. Wermiel MS10D24 M. Virgilio MS 13E4 ACRS (10) MS P-315

.T.

Quay PD4-1 Plant File L. Berry 0FC

PD4-1/LA
PD4 M
LH B/BC
PD4-1/D g............... p....:............................

g HAME :LBerry }V

L ner:1h
JWe,miel
TQuay 1 DATE :M /llV90
)0/lk90
/D/l7/90
b/ 4/90 OFFICIAL RECORD COPY Document Name:

GGNS DCRDR TAC NO. 56127 CC377 9010240083 901019 ADOCK0500g6 PDR P

%0

90**'0:g

{

[j<

f UNITED STATES l'

'g p,

NUCLEAR REGULATORY COMMISSION i

4

,g5

.8 WASHINGTON, D C 20055

/

October 19, 1990 Docket No. 50-416 Mr. William T. Cottle Vice President, Operations GGNS Entergy Operations, Inc.

Post Office Box 756 Port'Gibson, Mississippi 39150

Dear Mr. Cottle:

1

SUBJECT:

IMPLEMENTATION SCHEDULE FOR DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR) MODIFICATIONS - GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. 56127)

By letter dated September 26, 1990, Entergy Operations, Inc. (the licensee) submitted a DCRDR Supplemental Summary Report for Grand Gulf Nuclear Station, Unit 1, including a schedule for correcting all safety related human ergineering deficiencies (HEDs).

All safety related HEDs are scheduled to be corrtcted by the end of the current outage that began October 1990, except for one ' LED that is scheduled to be corrected by the end of the fifth refueling outage (July 31, 1992).

l The staff has made a cursory review of this submittal and concludes that it fulfills the commitment made to provide a Supplemental Summary Report.

The staff approves the scheduled implementation of corrective actions by July 31, 1992.

Sincerely, i

1 Lester L. Kintner, Jenior Project Manager 1

Project Directorate IV-1 Division of Reactor Projects - III, i

IV, V and Special Projects Office of-Nuclear Reactor Regulation ec:, See next page 4

~,

4 I,-

Mr. W. T. Cottle Entergy Operations, Inc.

Grand Gulf Nuclear Station ec:

Mr. Ted H. Cloninger Mr. C. R. Hutchinson Vice President, Engineering GGNS General Manager Entergy Operations Inc.

Entergy Operations, Inc.

P. O. Box.31995 P. O. Box 756 Jackson, Mississippi 39286-1995 Port Gibson, Mississippi 39150 Robert B. McGehee The Honorable William J. Guste, Jr.

Wise, Carter, Child, and Attorney General Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, Mississippi 39205 P. O. Box 94005 Baton Rouge, Louisiana 70804-9005 Nicholas S. Reynolds Esquire Bishop, Cook, Purcell Alton B. Cobb, M.D.

and Reynolds State Health Officer 1400 L Street, N.W. - 12th Floor State Board of Health Washington, D.C.

20005-3502 P. O. Box 1700 Jackson, Mississippi 39205 i

Mr.' Jim T. LeGros Manager of Quality Assurance Office of the Governor Entergy Operations, Inc.

State of Mississippi P. O. Box 31995 Jackson, Mississippi 39201 Jackson, Mississippi 39286-1995 President, Mr. Jack McMillan, Director Claiborne County Board of Supervisors Division of Solid Waste Management Port Gibson, Mississippi 39150 Mississippi Department of Natural Resources Regional Administrator, Region II P. O. Box 10385 U.S. Nuclear Regulatory Commission Jackson, Mississippi 39209 101 Marietta St., Suite 2900 Atlanta, Georgia 30323 Mr. Michael J. Meisner Director, Nuclear Licensing Mike Morre, Attorney General L

Entergy Operations, Inc.

Frank Spencer, Asst. Attorney General P. O. Box 756 State of Mississippi i

Port Gibson, Mississippi 39150 Post Office Box 22947-l Jackson, Mississippi 39225 l

Mr. C. B. Hogg, Project Manager l

Bechtel Power Corporation Mr. Gerald W. Muench L

P. O. Box 2166 Vice President, Operations Support l_

-Houston, Texas 77252-2166 Entergy Operations, Inc.

P. O. Box 31995 L

Mr. H. O. Christensen Jackson, Mississippi 39286-1995 l

Senior Resident Inspector O.S. Nuclear Regulatory Commission Mr. Donald C. Hintz, Executive Vice Route 2, Box 399 President & Chief Operating Officer Port Gibson, Mississippi 39150 Entergy Operations, Inc.

P. O. Box 31995 Jackson, Mississippi 39286-1995 i

l

-