Text
.
""'8v
UNITED STATES
c
NUCLEAR REGULATORY COMMISSION
2
{
p
REGloN IV
611 RYAN PLAZA DRIVE, sulTE 400
8
ARLINGTON, TEXAS 76011-8064
,,,g
July 30,1999
William A. Eaton, Vice President
Operations - Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT NO. 50-416/99-03
Dear Mr. Eaton:
1
'
This refers to the inspection conducted on April 5 to 8,1999, at the Grand Gulf Nuclear Station
facility. The purpose of the inspection was to review your facility's corrective action program,
using the guidance provided in NRC Inspection Procedure 40500. An exit meeting with your
staff was held on April 8,1999. A supplemental onsite inspection was conducted from May 10
to 11,1999, which concluded with a briefing for representatives of your staff. Inoffice inspection
of this supplemental information was performed through June 28,1999. Following the inoffice
inspection, an exit was conducted telephonically on July 22,1999, with your staff. The
enclosed report presents the scope and results of the inspection.
On the basis of the sample reviewed, your corrective action program was acceptably
implemented, with senior management involvement and oversight being maintained through
routine reports and meetings. During the review of condition reports and other associated
corrective action documents, the inspectors observed examples of slow or untimely closure of
the associated condition report and one example of a failure to implement prompt corrective
actions. Similar issues were identified in NRC Inspection Report 50-416/99-02. Additionally,
self-assessments conducted by your staff identified related problems involving examples of
'
multiple extensions of root cause analyses and late closures of corrective actions.
During this inspection, we also noted that the use of temporary or interim solutions may result in
the f ailure to appropriately implement established design and work control measures. In some
instances, temporary or interim engineering dispositions to accept-as-is material deficiencies
and interim repairs were not effectively tracked by the corrective action program.
In addition to questions regarding the implementation of temporary or interim solutions, other
recent inspection reports have raised questions regarding the scope and rigorousness of a
number of other programs. These include the updated final safety analysis report review and
update project, technical specification instrument setpoint calculations (as documented in NRC
Inspection Report 50-416/99-02) and the surveillance credit program (as documented in NRC
Inspection Report 50-416/99-06, Section F2.2).
,
9909060040 990730
ADOCK 05000416
G
pm
- _ _ - - _ - _ _
_ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
.
.
Entergy Operations, Inc.
-2-
As a result of these issues, and as noted in NRC Inspection Report 50-416/99-02, we des;re to
meet with you in the Region IV office to gain a better understanding of your perspective
regarding these findings and programs, including any plans you have to enhance these
programs and their implementation. We will contact you regarding a mutually agreeable date
and agenda for this meeting.
Based on the results of this inspection, the NRC also determined that a violation of NRC
requirements occurred for untimely corrective actions. This violation is being treated as a
noncited violation, consister,t with Appendix C of the Enforcement Policy. The noncited
violation is described in the subject inspection report. If you contest the violation or severity
level of the noncited violation, you should provide a response within 30 days of the date of this
inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington DC 20555 0001, with copies to the Regional
Administrator, Region IV, and the Director, Office of Enforcement, United States Nuclear
Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the
Grand Gulf Nuclear Station.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sinc
,
k
4
Arthur T. Howel ll, Director
Division of Reactor Safety
Docket No.:
50-416
License No.: NPF-29
Enclosure:
NRC Inspection Report No.
50-416/99-03
cc w/ enclosure:
Executive Vice President
and Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
-
_ _ _ _ _ _
_
,
.
l
.
Entergy Operations, Inc.
-3-
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Winston & Strawn
1400 L Street, N.W. - 12th Floor
Washington, D.C. 20005-3502
l
Sam M,abry, Director
Division of Solid Waste Management
Mississippi Department of Natural
Resources
P.O. Box 10385
Jackson, Mississippi 39209
President
Claiborne County Board of Supervisors
. Port Gibson, Mississippi 39150
General Manager
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
.
Port Gibson, Mississippi 39150
The Honorable Richard leyoub
Attorney General
Department of Justice
'
State of Louisiana
'
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
i
Office of the Governor
l
State of Mississippi
Jackson, Mississippi 39201
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O. Box 22947
Jackson, Mississippi 39225
Dr. F. E. Thompson, Jr.
State Health Officer
State Board of Health
P.O. Box 1700
Jackson, Mississippi 39205
L
n
'
..
I
e-
i
Entergy Operations, Inc.
-4-
E Mail report to T. Frye (TJF)
. E Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
'
bec to DCD (IE01)
!
bec distrib. by RIV:
i
Regional Administrator
Resident inspector
DRP Director
I
DRS Director
MIS System
Branch Chief (DRP/A)
!
RIV File
Project Engineer (DRP/A)
Branch Chief (DRP/TSS)
,
'
t
!
!
J
..
f
i
!
DOCUMENT NAME: R:\\_GG\\GG903RP.PCG
f
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy
l
SOE:OB
..
RI:DRP\\A
C:OB
_
C:DRP\\A r
DD:DM/
l
PCGage:Imb.W
PJAlter / <(t_
JLPellet e,A
JITapia WC J ATHofWI111
076/99
07///99
07/I'199
070'99 7h
074099
'
'
V
"
'
OFFICIAL RECORD COPY
050025
L:
p<
l
1
.
.
!
!
=
!.
Entergy Operations, Inc.
-4-
l
\\
'
l
' Robert W. Goff, Director
'
,
State Liaison Officer
j
l
Division of Radiation Health
l
- Mississippi Department of Health
l
. P.O. Box 1700
'
Jackson, Mississippi' 39215-1700
I
. Vice President -
-
Operations Support
,
Entergy Operations, Inc.
P.O. Box 31995
l
Jackson, Mississippl 39286-1995
Director, Nucle.ar Safety
,
i.
and Regulatory Affairs
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
Vice President, Operations
.
Grand Gulf Nuclear Station
-
Entergy Operations, Inc.
'
P.O. Box 756
Port Gibson, Mississippi 39150
i
l
!
-
1
'
.
L.
3
.
.
Entergy Operations, Inc.
-4-
)
E-Mail report to T. Frye (TJF)
{
E-Mail report to D. Lange (DJL)
l
E-Mail report to NRR Event Tracking System (IPAS)
'
E-Mail report to Document Control Desk (DOCDESK)
,
bec to DCD (IE01)
j
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS Director
MIS System
Branch Chief (DRP/A)
RIV File
j
i
Project Engineer (DRP/A)
Branch Chief (DRP/TSS)
J
\\
i
-
,
DOCUMENT NAME: R:(GG\\GG903RP.PCG
'
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N* = No copy
SOE:OB
.
RI:DRP\\A
C:OB
_
C:DRP\\A r
DD:DM/
,
PCGage:ImbW
PJAlter /g4_.
JLPellet N\\
JITapia WC J ATHofTell 111
07&/99
07/'//99/ )
07$99 *
07 @ 99 Fh
074099
'