October 19, 1990 Docket No. 50-416 DISTRIBUTION t 55215YTTTi'-
E. Jordan (MSMNBB3701)
Mr. William T. Cottle NRC/ Local PDR E.Su111 van (MS7E23)
Vice President. Operations CGNS L.Kintner J. Hayes (M514B29)
Entergy Operations, Inc.
0GC (MS15B18)
PD4 1 Plant File Port Office Box 755 PD4 1 Reading L. Berry i
Port Gibson, Mississippi 39150 ACRS(10)(MSP315)
T. Quay M.Virgilio(MS13E4)
Dear Mr. Cottle:
SUBJECT:
GRANDGULFNUCLEARSTATION(GGNS), UNIT 1 RESPONSE TO GENERIC' LETTER 89-04 (TAC NO. 74768)
By letter dated May 18, 1990, the licensee (System Energy Resources, Inc. before June 6,1990 and Entergy Operations, Inc. on or after that date) responded to j
Generic Letter 89-04, " Guidance on Developing Acceptable Inservice. Testing Programs." The letter stated that the licensee has completed the actions necessary to meet the positions in Generic Letter 89-04. Attachment 1 of the letter listed reliefs currently in effect that were submitted pursuant to 10 CFR 50.55a. Attachment 2 and Valve Inservice Testing (provided a copy of the revised GGNS, Unit 1 Pump IST) Program (Revision 4,datedMay 17,1990) including the specific relief requests listed in Attachment 1.
Based on its eyeluation and the changes implemented in the GGNS IST Program, the licensee concluded that the GGNS IST Program conforms to the positions in NRC Generic Letter 89-04. The licensee also stated that IST Program procedures have been written or revised as necessary to implement the revised GGNS IST Program.
Furthermore, the licensee indicated that no equipment modifications are required i
as a result of the revised GGNS IST Program.
j The NRC staff confirms that the licensee's actions as stated in its May 18, 1990 submittal, and summarized above, meets the guidelines in Generic Letter 89 04.
Therefore,.the relief requests in the GGNS, Unit 1 Pump and Valve Testing Program, Revision 4. dated May 17, 1990, are approved. The NRC may conduct inspections to determine licensee conformance with the provisions of the approval granted by the Generic Letter. The areas covered in Attachment 1 of the Generic Letter will be the focus of future IST inspections. Aspects of the IST Program not addressed by Attachment 1 may also be inspected.
3 Sincerely, Original signed by Lester L. Kintner, Senior Project Manager L
Project Directorate IV.1 Division of Reactor Projects. III, L
IV, Y and Special Projects l
Office of Nuclear Reactor Regulation
Attachment:
As stated l'
l cc: See next page
- See Previous Concurrence g
l0FC
- PD4-1/LA*
- PD4-1/
- EMEB/5H*
- PD4 1/D L......:................:...
...:..............:....... p...:..............:
I fJ NAME :LBerry
- LKi
- ESu111 van
- TQuay%
......:................:....jp.......:..............:..............:..............:.............
,DATE 210/16/90
- 10/k6790 - e q r19/17/90
- W / 9 90
,0FFIQAlggC0Qg * ' D0cument Name:
GGN5 RESPONSE TO GL 89 04 l
PDR ADOCK 05000416
f **%'o, y
'4 UNITED STATES
,,g
'h NUCLEAR REGULATORY COMMISS!ON c.
gi /
g aB WASHINGTON. D. C. 20655
- E,'
- l I
.t
- I October 19, 1990 Docket No. 50-416 Mr. William T. Cottle Vice President, Operations GGNS Entergy Operations, Inc.
l Post Office Box 756 Port Gibson, Mississippi 39150
Dear Mr. Cottle:
SUBJECT:
GRANDGULFNUCLEAP, STATION (GGNS), UNIT 1-RESPONSETOGENERIC
'7 LETTER 89-04 (TAC NO. 74768) j By letter dated May 18, 1990, the licensee (System Energy Resources, Inc. before June 6, 1990-and Entergy Operations, Inc. on or after that date) responded to Generic Letter 89-04, " Guidance on Developing Acceptable Inservice Testing L
Programs." The letter stated that the licensee has completed the actions necessary to meet the pcsitions in Generic Letter 89-04 of the letter listed reliefs currently in effect that were submitted pursuant to 10 CFR 50.55a. Attachment 2 and Valve Inservice Testing (provided a cop (y of the revised GGNS, Unit 1 Pump IST) Program Revision 4, dated May 17,1990) t including the specific; relief requests listed in Attachment 1.
Based on its evaluation and the changes implemented in the GGNS IST Program, the-licensee concluded that the GGNS IST Program conforms to the positions in NRC Generic Letter 89-04. The licensee also stated that IST Program procedures have been written or revised as necessary to implement the revised GGNS IST Program.
Furthermore, the licensee indicated that no equipment modifications are required as a result of the revised GGNS IST Program.
Y The NRC staff confirms that the licensee's actions as stated in its May 18, 1990 1.
submittal, and summarized above, meets the gui.ielines in Generic Letter 89-04.
l Therefore, the' relief requests in the GGNS, Unit 1 Pump and Valve Testing l
Program, Revision 4, dated May 17, 1990, are t.pproved. The NRC may conduct
. inspections to determine licensee conformance with the provisions of the l:
approval granted by the Generic Letter. The areas covered in Attachment 1 of the Generic Letter will be the focus of future IST inspections. Aspects'of the IST. Program not addressed by Attachment 1 may also be inspected.
Sincerely, r
Lester L. Kintner, Senior Project Manager
'i Project Directorate IV-1 Division of Reactor Projects - I'!,
IV, Y and Special Projects Office of Nuclear Reactor Regulation
Attachment:
As stated cc: See next page
,o
- Mr. W. T. > Cottle
. Entergy Operations, Inc.
Grand Gulf Nuclear Station cc:
Mr. Ted H. Cloninger Mr. C. R. Hutchinson Vice President, Engineering GGNS General Manager Entergy Operations Inc.
Entergy Operations, Inc.
P. O. Box 31995 P. O. Box 756 Jackson, Mississippi 39286-1995 Port Gibson, Mississippi 39150 Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, and Attorney General Caraway Department of Justice P. O. Box 651 State of Louisiana
' Jackson, Mississippi 39205 P. O. Box 94005 Baton Rouge, Louisiana 70804-9005 Nicholas S. Reynolds Esquire Bishop, Cook, Purcell Alton B. Cobb, M.D.
i and Reynolds State Health Officer i
1400 L Street, N.W. - 12th Floor State Board of Health Washington, D.C.
20005-3502 P. O. Box 1700 Jackson, Mississippi 39205 Mr. Jim T. LeGros Manager of Quality Assurance Office of the Governor Entergy Operations, Inc.
State of Mississippi
't P. O. Box 31995 Jackson, Mississippi 39201
(
Jackson, Mississippi 39286-1995 President, Mr. Jack McMillan, Director Claiborne County Board of Supervisors Division of Solid Waste Management Port Gibson, Mississippi 39150 Mississippi Department of Natural Resources Regional Administrator, Region 11 P. O. Box 10385 U.S. Nuclear Regulatory Commission Jackson, Mississippi 39209 101 Marietta St., Suite 2900 L
Atlanta, Georgia 30323 Mr. Michael J. Meisner l
Director, Nuclear Licensing Mike Morre, Attorney General Entergy Operations, Inc.
Frank Spencer, Asst. Attorney General P. O. Box 756 State of Mississippi Port Gibson, Mississippi 39150 Post Office Box 22947-Jackson, Mississippi 39225 Mr. C. B. Hogg, Project Mar,ager Bechtel Power Corporation Mr. Gerald W. Muench P. O. Box 2166 Vice President, Operations Support p
Houston, Texas 77252-2166 Entergy Operations, Inc.
P. O. Box 31995 Mr. H. O. Christensen Jackson, Mississippi 39286-1995 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. Donald C. Hintz, Executive Vice Route 2, Box 399 President & Chief Operating Officer Port Gibson, Mississippi 39150 Entergy Operations, Inc.
P. O. Box 31995 Jackson, Mississippi 39286-1995
.