ML20245J796
| ML20245J796 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/02/1989 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Cottle W SYSTEM ENERGY RESOURCES, INC. |
| Shared Package | |
| ML20245J798 | List: |
| References | |
| NUDOCS 8908180190 | |
| Download: ML20245J796 (2) | |
See also: IR 05000416/1989018
Text
_
_ , _ _ - - - - _ _ _ _ - _ , - _ _ _ _ _ _ _
__-____ -
_-
_
- _ _
__
-_
_
-
.
-_
'
'
Clk
?,.
.
>
y . . ..
. ,.
_
_
.
r
/10002ISI-
,
.,.
Docket No. 50-416
License No. NPF-29
7
' System Energy' Resources, Inc.
ATTN: Mr. W. T. Cottle, Vice President-
.
Nuclear Operations
P. O. Box 469
Port Gibson, MS 39150
Gentlemen:
- SUBJECT: NRC' INSPECTION REPORT NO. 50-416/89-18-
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by.
R. . B. Shortridge ~ on ' July 10-14, 1989.
The inspection included a review of
-
_
activities-authorized:for your' Grand Gulf. facility.
At the conclusion of the
inspection - the findings were discussed with those members of your staff.'
identified in the enclosed inspectionLreport.
d
Areas examined during thel inspection are . identified in the report.
. ithin
W
these areas,: the inspection -consisted of selective examinations.' of; procedures
and representative records, interviews with personnel, and observations of
activities in progress.
Within t_he'i scope-: of mthe inspection, .no violations 'or deviations were
identified.
In accordance with. Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10,- Code of Federal Regulations, a copy of this letter'and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely.
ONGINAL SIGNED BY
DOUGLAS M. COLUNS
Douglas M. Collins, Chief
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
NRC-Inspection Report
cc w/ encl:
(See page 2)
h
Oh
h **
G
ZEo1
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
-. __ _
!
-. .
,
I
L
l
System Energy Resources, Inc.
2
cc w/ enc 1:
T. H. Cloninger, Vice President, Nuclear
Engineering and Support
C. R. Hutchinson, GGNS General Manager
J. G. Cesare, Director, Nuclear Licensing
R. T. Lally, Manager of Quality Assurance
-
Middle South Utilities System Services, Inc.
R. B. McGehee, Esquire
Wise, Carter, Child Steen and Caraway
N. S. Reynolds, Esquire
Bishop, Cook, Purcell & Reynolds
R. W. Jackson, Project Engineer
State of Mississippi
bec w/ encl:
NRC Resident Inspector
L. Kintner, NRR
Document Control Desk
RII *
RI
RII:DRP
--
tter
F n ell
ortridge
o
8// /89
8// /89
8///89