IR 05000416/1985034
| ML20138P682 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/16/1985 |
| From: | Mcguire D, Perny C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20138P676 | List: |
| References | |
| 50-416-85-34, NUDOCS 8511070324 | |
| Download: ML20138P682 (1) | |
Text
. *
[e MC UNITED STATES NUCLEAR REGULATORY COMMISSION
$N f/^
REGION 11 N I N O
101 MARIETTA STREET, N.W.
{
E ATL ANTA, GEORGI A 30323 s~/
gCT2gggg
.....
Report No. 50-416/85-34 Licensee: Mississippi Power and Light Company P. O. Box 23054 Jackson, MS 39205
.
Docket No. 50-416 License No. NPF-29 Facility Name:
Grand Gulf 1 Inspection Dat -
Se ember 16-20, 1985 Inspector:
.A
/D(
/4Lf
/d /M [d C.
r cuFity Inspector
'
D' ate Signed
.
,
Approved by:
d5
/o
v
/D. R. McGuire, Chief, Physical Security Section fate / Signed Nuclear Materials Safety and Safeguards Branch Divisicn of Radiation Safety and Safeguards i
SUMMARY Scope:
This unannounced physical security inspection involved 30 inspector-hours (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> on backshift) inspecting:
Security Plan and implementing Procedures; Management Effectiveness - Security Program; Security Organization; Physical Barriers - Protected Area; Physical Barriers - Vital Areas; Security System Power Supply; Compensatory Measures; Lighting; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Communications; and Safeguards Contingency Plan Implementation.
The inspector also reviewed the results of a licensee investigation of alleged drug use by employees and contractors at Grand Gulf.
Results:
No violations of regulatory requirements were identified in the 14 areas inspected.
,
PDR_,,,
JOkRDs MFORMATION ocI,o3ya,co,Tu,3
g SA?2 GUARDS INFORMATI0lt UPort f. EPA!tATION THIS PACC IS LECOIIIi10LLED.
.
-
-
,