Refers to Investigation Conducted by NRC OI Re Activities at Grand Gulf Nuclear Station.Investigation Conducted to deter- Mine Whether Security Supervisor Deliberately Falsified Unescorted Access Authorizations.Allegation Unsubstantiated
ML20217B036
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 10/04/1999
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eaton W
ENTERGY OPERATIONS, INC.
References
NUDOCS 9910120148
Download: ML20217B036 (3)


Text

s

    • bg UNITED STATES

'e NUCLEAR REGULATORY COMMISSION i

f

  • 3 5 j REGION IV

[ 611 RYAN PLAZA DRIVE, SUITE 400

,g ARUNGToN, TEXAS 76011-8064 l October 4, 1999 William A. Eaton, Vice President Operations - Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150

SUBJECT:

CLOSURE OF INVESTIGATION (OI 4-1998-047)

Dear Mr. Eaton:

This letter is in reference to an investigation conducted by the NRC Office of Investigations (OI) regarding activities at your Grand Gulf Nuclear Station. The O1 investigation was conducted to determine whether a security supervisor at Grand Gulf deliberately falsified unescorted access authorizations.

Based on the evidence developed during the investigation, testimony, and document reviews, the allegation was not substantiated. The NRC plans no further action regarding this investigation, and we consider this case closed. Enclosed for your reference and information is a copy of the synopsis for O14-1998-047.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the enclosure will be placed in the NRC Public Document Room.

Sincerely, U f c ed.b n en E. Br maV irector Division of Rea ' or Projects

Enclosure:

As stated

,/ em 9910120148 991004 PDR ADOCK 05000416 G PDR

V,:;e ..

,n,,

t;;; ' ..

h l i-h Q

!~> ' Allegation File -

ll ih?bf l

l t

RIV: SAC 4 \ D: ACES s1- DRP:D ,

RWise -

GFSanbo KEBrockman k 9/30/99 Y hf \ /99 h4/ /99 OFFICIAL RECORD COPY

120075 s

s

g... ,

l SYNOPSIS i

This investigation was initiated by the Nuclear Regulatory  !

Commission (NRC), Office of Investigations (OI), Region IV (RIV), f on September 29, 1998, to determine if the security supervisor, i Access Authorization (AA) and Fitness-for-Duty (FFD), Entergy Operations, Inc. (EOI), Grand Gulf Nuclear Station (GGNS),

deliberately falsified unescorted access authorizations, and if so, if this was done with the knowledge of EOI's director of l security. j l

' Based on the evidence developed during the investigation, I documentation, testimony, and a review by NRC:RIV technical staff, the allegation that the security supervisor deliberately falsified unescorted access authorizations with the security director's knowledge was not substantiated. However, the investigation disclosed that, on occasion, site access authorizations were granted by the security supervisor or security coordinator when they were not on site to sign the forms, and this was done with'the knowledge of EOI's director of security.

1 NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE l DIRECTOR, OFFICE OF INVESTIGATIONS, REGION IV Case No. 4-1998-047 1

.