ML20210B103
| ML20210B103 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/15/1999 |
| From: | Tapia J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Eaton W ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20210B107 | List: |
| References | |
| 50-416-99-08, NUDOCS 9907230058 | |
| Download: ML20210B103 (5) | |
See also: IR 05000416/1999008
Text
,
- "4
UNITED STATES
tg
O
t
NUCLEAR REGULATORY COMMISSION
.
=
o
E
.p
REGloN IV
8
611 RYAN PLAZA DRIVE, sulTE 400
ARLINGTON, TEXAS 76011-8064
,,,g
JUL I 51999
William A. Eaton, Vice President
Operations - Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT NO. 50-416/99-08
Dear Mr. Eaton:
This refers to the inspection conducted on May 2 through June 12,1999, at the Grand Gulf
Nuclear Station facility. The enclosed report presents the results of this inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Grand
Gulf facility was generally characterized by safety-conscious operations, sound engineering and
maintenance practices, and careful radiological work controls.
Based on the results of this inspection, the NRC has determined that three Severity Level IV
violations of NRC requirements occurred. Thes /iolations are being treated as noncited
violations (NCVs), consistent with Appendix C of ne Enforcement Policy. These NCVs are
described in the subject inspection report. If you contest the violation or severity level of these
NCVs, you should provide a response within 3r, days of the date of this inspection report, with
the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control
Desk, Washington, DC 20555-0001, with copies to the Regiona' Administrator, U.S. Nuclear
Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011,
the Director, Office of Enforcement, United States Nuclear Regulatory Commission,
Washington, DC 20555-0001; and the NRC Resident inspector at the Grand Gulf Nuclear
Station facility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enciosure, and your response, if requested, will be placed in the NRC Public Document
Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerel ,
C
_
W
osep . Tapia',
if
Project Branch A
Division of Reactor Projects
9907230058 990715
ADOCK 05000416
G
,
_
_--
.-
.
Entergy Operations, Inc.
-2-
4
Docket No.:
50-416
License No.: NPF-29 '
4
Enclosure:
NRC. Inspection Report No.
,
50-416/99-08"
cc w/ enclosure:
Executive Vice President
and Chief Operating Officer
Entergy Operations, Inc.-
P.O. Box 31995 --
Jackson, Mississippi 39286-1995
- Wise, Carter, Child & Caraway
P.O. Box 651
' Jackson, Mississippi 39205
<
' Winston & Strawn
1400 L Street, N.W.
12th Floor
Washington, D.C. 20005-3502
Sam Mabry, Director
Division of Solid Waste Management
Mississippi Department of Natural
'
Resources
P.O. Box 10385
Jackson, Mississippi 39209
President
'Claiborne County Board of Supervisors
P.O. Box 339
Port Gibson, Mississippi 39150
I Gen ral Manager -
Grand Gulf Nuclear Station
Entergy Operations, Inc.-
P.O. Box 756
Port Gibson, Mississippi 39150
. > The , Honorable Richard leyoub
{
I
Attorney General
i
L Department of Justice
~ State of Louisiana
P.O. Box 94005 ~
1
Baton Rouge, Louisiana 70804-9005
l
,
F
.
.
Entergy' Operations, Inc.
-3-
Office of tne Governor
State of Mississippi-
Jackson, Mississippi 39201
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O. Box 22947
Jackson, Mississippi 39225
Dr. F. E. Thompson, Jr.
.
State Health Officer
' State Board of Health
P.O. Box 1700
Jackson, Mississippi 39205
Robert W. Goff, Program Director
Division of Radiological Health
' Mississippi Dept. of Health
P.O. Box 1700
Jackson, MS 39215-1700
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Director, Nuclear Safety-
.and Regulatory Affairs
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
Vice President, Operations
'
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
..
.
'
Entergy Operations, Inc.
-4-
j(L l5 jggg
E-Mail report to T. Frye.(TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/A)
Project Engineer (DRP/A)
Branch Chief (DRP/TSS)
.
,
P'^.JeIc e
r 1 I5'-
q
DOCUMENT NAME: R:\\_.GG\\GG908RP.JLD
i
To receive copy of document, Indicate in box: *C" = Copy without enclostres *E" = Copy with enclosures "N" = No copy
RIV: SRI:DRP/A
Rl:GG
Rl:EMB
C:DRP/M
,
JLDigon-Herrity VA
PJAlter
WMMcNeill (
JITapi&J s
j
07$99
klfb 07/9/99*
S O M 90s. M
0$99[ T '
- Previously concurred
OFFICIAL. RECOF D COPY
V
(pkdkb
I
~
p bt64404
4&9.fm
WL k. M
BNA u w k w ,s S 4 ,0-
_
.
i
O
Entergy Operations, Inc.
-4-
JUL l 51999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E Mai! report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
ent inspector
.
DRP Director
RIV File
DRS Director
RITS Coordinator
i
Branch Chief (DRP/A)
Project Engineer (DRP/A)
Branch Chief (DRP/TSS)
\\
g(cf
n 1 I'f-
DOCUMENT NAME: R:\\_GG\\GG908RP.JLD
To receive copy of document, Indicate in box: "C" = Copy without enclost res *E" = Copy vath enclosures 'N" = No copy
RIV: SRI:DRP/A
RI:GG
RI:EMB
C:DRP/%
,
,
JLDigon-Herrity VA -
PJAlter
. WMMcNeill /
JITapi&l s
07499
-hy b 07/9/99*
SRW99ff
0$99( T '
- Previously concurred
OFFICIAL. RECOF D COPY
V
d <pk 4Na
230023
p pp yao.l,
ep9.fw
.
AN W
\\
B M p m .L S- h fe.
_