SUBJECT:

ANNUAL ASSESSMENT LETTER - GRAND GULF NUCLEAR STATION (NRC INSPECTION REPORT 05000416/2006001)

Dear Mr. Williams:

On February 7, 2006, the NRC staff completed its performance review of the Grand Gulf Nuclear Station. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2005. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security Related Information will include the physical protection review and resultant inspection plan.

Overall, Grand Gulf operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through September 30, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Entergy Operations, Inc. -2-If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8144 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Kriss M. Kennedy, Chief Project Branch C Division of Reactor Projects Docket: 50-416 License: NPF-29 Enclosure:

Grand Gulf Inspection/Activity Plan cc w/enclosure:

Senior Vice President General Manager and Chief Operating Officer Grand Gulf Nuclear Station Entergy Operations, Inc. Entergy Operations, Inc.

P.O. Box 31995 P.O. Box 756 Jackson, MS 39286-1995 Port Gibson, MS 39150 Wise, Carter, Child & Caraway The Honorable Charles C. Foti, Jr.

P.O. Box 651 Attorney General Jackson, MS 39205 Department of Justice State of Louisiana Winston & Strawn LLP P.O. Box 94005 1700 K Street, N.W. Baton Rouge, LA 70804-9005 Washington, DC 20006-3817 Governor Haley Barbour Jay Barkley, Chief Office of the Governor Energy & Transportation Branch State of Mississippi Environmental Compliance and P.O. Box 139 Enforcement Division Jackson, MS 39205 Mississippi Department of Environmental Quality Jim Hood, Attorney General P.O. Box 10385 State of Mississippi Jackson, MS 39289-0385 P.O. Box 220 Jackson, MS 39225 President, District 1 Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150

Entergy Operations, Inc. -3-Dr. Brian W. Amy Supervisor, District 5 State Health Officer Claiborne County State Board of Health 4007 Pine Grove Road P.O. Box 1700 Port Gibson, MS 39150 Jackson, MS 39215 Diane Davaul Robert W. Goff, Program Director Claiborne County Tax Division of Radiological Health Assessor/Collector Mississippi Dept. of Health P.O. Box 469 P.O. Box 1700 Port Gibson, MS 39150 Jackson, MS 39215-1700 Roderick Devoual, Director Director Port Gibson/Claiborne County Nuclear Safety & Licensing Civil Defense Entergy Operations, Inc. P.O. Box 558 1340 Echelon Parkway Port Gibson, MS 39150 Jackson, MS 39213-8298 James Jackson, Sr.

Director, Nuclear Safety Claiborne County Election Commissioner, and Regulatory Affairs District #1 Entergy Operations, Inc. 338 Gordon Station Annex P.O. Box 756 Port Gibson, MS 39150 Port Gibson, MS 39150 James Gray Allen Burks Claiborne County Election Commissioner, Supervisor, District 1 District #2 Claiborne County P.O. Box 105 2047 Woodvine Road Port Gibson, MS 39150 Lorman, MS 39069 Gary Knight Michael Wells Claiborne County Election Commissioner, Supervisor, District 2 District #3 Claiborne County 116 Willows Lane 102 Evergreen Street Port Gibson, MS 39150 Port Gibson, MS 39150 Corlean Hughes Mott Headley, Jr. Claiborne County Election Commissioner, Supervisor, District 3 District #4 Claiborne County P.O. Box 161 1154 Mott Headley Road Hermanville, MS 39086 Port Gibson, MS 39150 Coney Johnson Martha Lott, Board Vice President Claiborne County Election Commissioner District 4, Claiborne County District 5 P.O. Box 279 5088 Hwy 547 Port Gibson, MS 39150 Port Gibson, MS 39150 Charles Shorts, President of Board

Entergy Operations, Inc. -4-The Honorable Amelda Arnold Michael A. White Mayor, Town of Port Gibson Ward 6 P.O. Box 607 206 Mimosa St.

Port Gibson, MS 39150 Port Gibson, MS 39150 Sheriff Frank Davis The Honorable Haley Barbour Claiborne County Governor, State of Mississippi P.O. Box 427 P.O. Box 139 Port Gibson, MS 39150 Jackson, MS 39205 Vanessa Waters Jim Hood, Attorney General City Clerk State of Mississippi P.O. Box 48 P.O. Box 220 Pattison, MS 39144 Jackson, MS 39205 Paul Winfield Robert R. Latham, Jr., Director City Attorney Mississippi Emergency 1129 Openwood Street Management Agency Vicksburg, MS 39183 P.O. Box 4501 Jackson, MS 39296-4501 Eddie Walls, Jr.

Ward 1 Phil Bass, Director P.O. Box 239 Office of Pollution Control Port Gibson, MS 39150 Department of Environmental Quality P.O. Box 10385 Vera Johnson Jackson, MS 39289 Ward 2 605 Greenwood St. Federal Emergency Management Port Gibson, MS 39150 Agency, Region IV ATTN: Kenneth O. Burris, Jr.

Kenneth Davis Regional Director Ward 3 3003 Chamblee Tucker Road 305 Cedar St. Atlanta, GA 30341 Port Gibson, MS 39150 Federal Emergency Management Agency Thomas Russum ATTN: William E. Peterson, Regional Director Ward 4 Region VI, Federal Center P.O. Box 400 800 North Loop 288 Port Gibson, MS 39150 Denton, TX 76209-3698 Leslie Case The Honorable Edward Brown Ward 5 Mayor, Town of St. Joseph 214 Claremont Drive P.O. Box 217 Port Gibson, MS 39150 St. Joseph, LA 71366

Entergy Operations, Inc. -5-James Paxton Erica Turner Town Attorney Municipal Clerk P.O. Box 97 P.O. Box 217 St. Joseph, LA 71366 St. Joseph, LA 71366 Rick Foster, Director Emmett Adams Tensas Office of Emergency Preparedness Tensas Parish Police Jurors P.O. Box 768 District 1 St. Joseph, LA 71366 P.O. Box 631 Newellton, LA 71357 A. E. Tindell Board of Alderpersons Danny Clark District A Tensas Parish Police Jurors P.O. Box 164 District 2 St. Joseph, LA 71366 P.O. Box 262 Newellton, LA 71357 Jack Grace, Jr.

Board of Alderpersons Jane Netterville, Vice President District B Tensas Parish Police Jurors P.O. Box 75 District 3 St. Joseph, LA 71366 P.O. Box 125-9 St. Joseph, LA 71366 Jimmy S. Clark Board of Alderpersons William Trevillion District C Tensas Parish Police Jurors P.O. Box 467 District 4 St. Joseph, LA 71366 HC-61, Box 276 Waterproof, LA 71375 Theodore Jackson Board of Alderpersons Roderick Dale Webb District D Tensas Parish Police Jurors P.O. Box 701 District 5 St. Joseph, LA 71366 P.O. Box 516 St. Joseph, LA 71366 Dianne Yarrington Board of Alderpersons Roy K. Smith District E Tensas Parish Police Jurors P.O. Box 782 District 6 St. Joseph, LA 71366 P.O. Box 539 Waterproof, LA 71375 Madaline Gibbs Town Attorney Woodrow W. Wiley, Jr., President 503 Hancock Street Tensas Parish Police Jurors St. Joseph, LA 71366 District 7 P.O. Box 33 Waterproof, LA 71375 The Honorable Alex Davis

Entergy Operations, Inc. -6-Mayor, Town of Newellton Karen Lynn Johnson P.O. Box 477 Town Council Member Newellton, LA 71357 P.O. Box 44 Waterproof, LA 71375 Edwin Britt, Pro Tem Board of Alderpersons Herbert Williams P.O. Box 398 Town Council Member Newellton, LA 71357 P.O. Box 106 Waterproof, LA 71375 Clara Bass Board of Alderpersons Caldwell A. Flood P.O. Box 266 Town Council Member Newellton, LA 71357 P.O. Box 338 Waterproof, LA 71375 Billy Mitchell Board of Alderpersons Connie McKeel P.O. Box 632 Clerk Newellton, LA 71357 P.O. Box 139 Waterproof, LA 71375 Kent Morgan Board of Alderpersons The Honorable Kathleen Blanco P.O. Box 684 Governor, State of Louisiana Newellton, LA 71357 P.O. Box 94004 Baton Rouge, LA 70804-9004 David Delaney Board of Alderpersons Administrator P.O. Box 621 Department of Environmental Quality Newellton, LA 71357 P.O. Box 4313 Baton Rouge, LA 70821-4313 Ronda King City Clerk Mike Henry P.O. Box 477 State Liaison Officer Newellton, LA 71357 Department of Environmental Quality P.O. Box 4313 Mariah Cooper, Mayor Baton Rouge, LA 70821-4313 Town of Waterproof P.O. Box 248 Col. Jeff Smith, Acting Assistant Director Waterproof, LA 71375-0248 Louisiana Office of Homeland Security and Emergency Preparedness Robert Bethel, III 7667 Independence Blvd.

Town Council Member Baton Rouge, LA 70806 P.O. Box 135 Waterproof, LA 71375 Institute of Nuclear Power Operations (INPO)

Records Center Bertha Brown 700 Galleria Parkway SE, Suite 100 Town Council Member Atlanta, GA 30339 P.O. Box 576 Waterproof, LA 71375

Entergy Operations, Inc. -7-Entergy Operations, Inc. -8-Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (GBM)

Branch Chief, DRP/C (KMK)

Project Engineer, DRP/C (WCW)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

RidsNrrDirsIpab V. Dricks, PAO (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (JAC, ATG, LJS, MPS1)

T. Bergman, Chief, TRPS, OEDO (TAB)

S. Richards, Deputy Director, DIRS, NRR (SAR)

C. Holden, Deputy Director, DORL, NRR (CFH)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, LPLG, DORL, NRR (DXT)

B. Vaidya, NRR Project Manager (BKV)

SUNSI Review Completed: __kmk____ ADAMS: : Yes G No Initials: _kmk_____

Publicly Available G Non-Publicly Available G Sensitive : Non-Sensitive S:\DRP\DRPDIR\EOC 05\Assessment Letters\GG.wpd RIV:C:DRP/C D:DRS D:DRP Signature KMKennedy;df DDChamberlain ATHowell III KMKennedy

/RA/ /RA/ /RA/

2/23/06 2/24/06 2/24/06 2/ /06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 2 Grand Gulf 03/01/2006 08:31:50 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-21 - CDB 10 1 IP 7111121 Component Design Bases Inspection 02/27/2006 03/10/2006 Baseline Inspections EP2 - EMERG PREP PROGRAM 1 1 IP 7111402 Alert and Notification System Testing 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/08/2006 05/12/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 05/08/2006 05/12/2006 Baseline Inspections RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 07/10/2006 07/14/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 07/10/2006 07/14/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/10/2006 07/14/2006 Baseline Inspections RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 07/24/2006 07/28/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 07/24/2006 07/28/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/24/2006 07/28/2006 Baseline Inspections EB2-07B - HX PERFORMANCE 1 1 IP 7111107B Heat Sink Performance 09/18/2006 09/22/2006 Baseline Inspections EB2-12B - MAINTENANCE RULE INSPECTION 2 1 IP 7111112B Maintenance Effectiveness 01/15/2007 01/19/2007 Baseline Inspections BRQ SIM - BIENNIAL REQUAL SIM ONLY 1 1 IP 7111111B Licensed Operator Requalification Program 01/22/2007 01/26/2007 Baseline Inspections EXAM - INITIAL EXAM 3 1 X02328 GRAND GULF INITAL EXAM (2/5/07) 02/05/2007 02/09/2007 Not Applicable 1 X02328 GRAND GULF INITAL EXAM (2/5/07) 03/05/2007 03/09/2007 Not Applicable RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/19/2007 03/23/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/19/2007 03/23/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/23/2007 04/27/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/23/2007 04/27/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/23/2007 04/27/2007 Baseline Inspections EB02/17 - 50.59 & PERMANENT PLANT MODS 5 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 08/13/2007 08/17/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Grand Gulf 03/01/2006 08:31:50 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB02/17 - 50.59 & PERMANENT PLANT MODS 5 1 IP 7111117B Permanent Plant Modifications 08/13/2007 08/17/2007 Baseline Inspections RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1 IP 7112102 ALARA Planning and Controls 08/20/2007 08/24/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/20/2007 08/24/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/20/2007 08/24/2007 Baseline Inspections REQUAL - BIENNIAL REQUALIFICATION 2 1 IP 7111111B Licensed Operator Requalification Program 08/27/2007 08/31/2007 Baseline Inspections RP TEAM - RADIATION SAFETY TEAM 5 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/10/2007 09/14/2007 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/10/2007 09/14/2007 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 09/10/2007 09/14/2007 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/10/2007 09/14/2007 Baseline Inspections EP1 - EMERG PREP EXERCISE 3 1 IP 7111401 Exercise Evaluation 09/17/2007 09/21/2007 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/17/2007 09/21/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/17/2007 09/21/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.