I
.e
/* ** %<
UNITED STATES
y
NUCLEAR REGULATORY COMMISSION
j
.,
$
,E
REGloN IV
l
3
$
/
611 RYAN PLAZA DRIVE, SUITE 400
4 ,,,,,
ARLINGTON, TEXAS 76011-8064
JUL 2 31999
,
I
William A. Eaton, Vice President
Operations - Grand Gulf Nuclear Station
Energy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT NO. 50-416/99-07
Dear Mr. Eaton:
From June 22-25,1999, an announced, emergency preparedness inspection was conducted at
your Grand Gulf Nuclear Station reactor facility. The enclosed report presents the scope and
results of that inspection.
The inspection included implementation of your emergency plan and procedures during your
biennial emergency preparedness exercise. Overall, performance during the biennial exercise
was good; however, one exercise weakness was identified and is described in the inspection
report. The exercise weakness involved the untimely completion of personnel accountability
following a site area emergency declaration.
Exercise weaknesses, according to 10 CFR Part 50, Appendix E.IV.F.2.g, are inspection
findings that need to be corrected by the licensee. Since the weakness was identified during
your critique process and placed into your corrective actions program, a response is not
necessary.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
c
k_
d' D
Gail M. Good, Chief
Plant Support Branch
l
Division of Reactor Safety
Docket No.:
50-416
License No.: NPF-29
(
9907290196 990723
!
'
ADOCK 05000416
O
I
L
..
.,
Entergy Operations, Inc.
-2-
Enclosure:
NRC Inspection Report No.
50-416/99-07
cc w/ enclosure:
Executive Vice President
and Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Winston & Strawn
1400 L Street, N.W. - 12th Floor
Washington, D.C. 20005-3502
i
Sam Mabry, Director
Division of Solid Waste Management
Mississippi Department of Natural
Resources
P.O. Box 10385
Jackson, Mississippi 39209
President
Claiborne County Board of Supervisors
1
Port Gibson, Mississippi 39150
General Manager
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
The Honorable Richard leyoub
Attorney General
i
Department of Justice
State of Louisiana
P.O. Box 94005
,
Baton Rouge, Louisiana 70804-9005
Office of the Governor
State of Mississippi
Jackson, Mississippi 39201
..
i
..
Entergy Operations, Inc.
-3-
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O. Box 22947
Jackson, Mississippi 39225
l
Dr. F. E. Thompson, Jr.
l
State Health Officer
l
State Board of Health
l
P.O. Box 1700
1
Jackson, Mississippi 39205
Robert W. Goff, Director
Stata Liaison Officer
Division of Radiation Health
Mississippi Department of Health
P.O. Box 1700
,
l
Jackson, Mississippi 39215-1700
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
l
l
Director, Nuclear Safety
and Regulatory Affairs
Entergy Operations, Inc.
P.O. Box 756
l
Port Gibson, Mississippi 39150
l
Vice President, Operations
Grand Gulf Nuclear Station
Entergy Operations, Inc.
I
P.O. Box 756
Port Gibson, Mississippi 39150
Training, Exercises, & Evaluation
l
Branch Chief
'
FEMA Region IV
3003 Chamblee Tucker Rd.
l
Atlanta, Gecrgia 30341
Training, Exercises, & Evaluation
Branch Chief
FEMA Region VI
Federal Regional Center
800 North Loop 288'
Denton, Texas 76201-3698
l
L
..
..
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (! PAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE35)
bec distrib. by RIV:
Regional Administrator
Grand Gulf Resident Irispector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/A)
RIV File
Project Engineer (DRP/A)
DRS Action item File (Goines)(99-G-
Branch Chief (DRP/TSS)
C. A. Hackney, RSLO
)
DOCUMENT NAME: Ri\\_GG\\GG907RP.HAF.WPD
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy
RIV:PSB
_
PSB
E
PSB
E
E
C:DRS\\PSB
Peer ReviewN
HAFreeman:nhW PJElkmann M
JDixon-Herrityp, GMGood (Mbr
07A
-
"
mmmhlm/99
07/# /99
07
/99
07/lF /99 Z ..,a 07479Y
mmmmmmmmmsiummesammmmmmmmaem
--
--
---
.-_ _ _ . _ _
-
C:DRP\\A #
/
JITapia.Q%. !M
07/th69 F
G
v
'
OFFICIAL RECORD COPY
<
..
- s
Entergy Operations, Inc.
-4-
!
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE35)
bec distrib. by RIV:
Regional Administrator
Grand Gulf Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/A)
RIV File
Project Engineer (DRP/A)
DRS Action item File (Goines)(99-G-
Branch Chief (DRP/TSS)
C. A. Hackney, RSLO
DOCUMENT NAME: RI\\_GG\\GG907RP.HAF.WPD
To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
RIV:PSB
_
PSB
E
PSB
E
E
C:DRS\\PSB
Peer Reviewd\\i
HAFreeman:nhh PJElkmann M
JDixon-Herritys , GMGood (--MEr
i
07/S /99
07/if /99
07/4 /99
07/p /99 i'JL . a
07 5 hNT
"
C:DRP\\A m
,
JITapia Q [lgf)
'
07/tf/99
l
Il
l
V
OFFICIAL RECORD COPY
<
280018