N EEEEE
.p"%
w{
h p
t UNITED STATES g'
j NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 20666-0001 Q.....,/
August 26, 1999 Mr. William A. Eaton Vice President, Operations GGNS Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE GRAND GULF N'UCLEAR STATION (TAC NO. M98744) naar Mr Rton:
By letter dated July 14,1999, Entergy Operations, Inc. (Entergy), transmitted General Electric Company (GE) Information to support NRC staff review of GE Report " Prediction of the Onset of Fission Gas Release from Fuelin Generic BWR," dated July 1996. By application and affidavit dated July 8,1999, executed by Glen A. Watford, GE Manager, Nuclear Fuel Engineering, GE requested that the information be withheld from public disclosure pursuant to 10 CFR 2.790.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies.
b.
Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
\\
(8)
The information...is classified as proprietary because it contains O
details of GE's fuel designs and methodology assumptions and the corresponding results which GE has applied to actual core designs with GE's fuel, f[
The development of the methods used in these analyses, along I
with the testing, development and approvcl of the supporting methodology was achieved at a significant cost, on the order of several million dollars, to GE.
g We have reviewed your application and the materialin accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
,g4g 7909030091 990826 F
PDR ADOCK 05000416 P
g.
l I'
1 l
W. A. Eaton 2
August 26, 1999
. Therefore, the GE information marked as proprietary, will be withheld from public disclosure
)
pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as l
amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. if the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the l
consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-2623.
Sincerely, ORIGINAL SIGNED BY S. Patrick Sekerak, Project Manager, Section 1 Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation l
Docket No. 50-416 l
cc: See next page DISTRIBUTION:
Docket File l
PUBLIC PD#1V-1 Reading S. Richards M. P. Siemien, OGC l
K. Brockman, RIV To receive a copy of this document, indicate "C" in the box OFFICE PDIV-1/PM 6
PDIV-1/L4 OGC C
PDIV-1/SC C -
P.Sekerakh L. Berry h h
R.Gramhh NAME DATE O /If /99 I /hh/99 N /I/99 6/ N99 DOCUMENT NAME: G:\\PDIV-1\\GrandGulf\\ WIT GE Prop.wpd OFFICIAL RECORD COPY
N.
Grand Gulf Nuclear Station ec:
Executive Vice President Attorney General j
& Chief Operating Officer Department of Justice Entergy Operations, Inc.
State of Louisiana P. O. Box 31995 P. O. Box 94005 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9005 Wise, Carter, Child & Caraway State Health Officer P. O. Box 651 State Board of Health Jackson, MS 39205 P. O. Box 1700 Jackson, MS 39205 Winston & Strawn 1400 L Street, N.W. - 12th Floor Office of the Governor Washington, DC 20005-3502 State of Mississippi Jackson, MS 39201 Director Division of Solid Waste Management Attorney General Mississippi Department of Natural Asst. Attorney General Resources State of Mississippi P. O. Box 10385 P. O. Box 22947 Jackson, MS 39209 Jackson, MS 39225 President Vice President, Operations Support Claiborne County Board of Supervisors Entergy Operations, Inc.
P. O. Box 339 P.O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 Regional Administrator, Region IV Director, Nuclear Safety U.S. Nuclear Regulatory Commission and Regulatory Affairs 611 Ryan Plaza Drive, Suite 1000 Entergy Operations, Inc.
Arlington, TX 76011 P.O. Box 756 Port Gibson, MS 39150 Senior Resident inspector U. S. Nuclear Regulatory Commission P. O. Box 399 Port Gibson, MS 39150
~