Category:INSPECTION REPORT
MONTHYEARIR 05000416/19990121999-09-29029 September 1999 Insp Rept 50-416/99-12 on 990725-0904.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990111999-09-28028 September 1999 Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Management Program,Radioactive Matl Transportation Program,Facilities & Equipment,Staff Knowledge & Performance & Staff Training IR 05000416/19990141999-09-27027 September 1999 Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program & Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000416/19990151999-09-13013 September 1999 Partially Withheld Insp Rept 50-416/99-15 on 990816-20. Noncited Violation Noted.Major Areas Inspected:Licensee Physical Security Program,Personnel Access Control,Access Authorization & Protected Area Detection Aids IR 05000416/19990101999-08-24024 August 1999 Insp Rept 50-416/99-10 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000416/19990091999-08-0909 August 1999 Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990031999-07-30030 July 1999 Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified.Major Areas Inspected:Corrective Action Program Implementation IR 05000416/19990071999-07-23023 July 1999 Insp Rept 50-416/99-07 on 990622-25.Violations Noted.Major Areas Inspected:Announced Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000416/19990081999-07-15015 July 1999 Insp Rept 50-416/99-08 on 990502-0612.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990051999-06-27027 June 1999 Insp Rept 50-416/99-05 on 990321-0501.Violations Identified, Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990061999-05-21021 May 1999 Insp Rept 50-416/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000416/19990021999-05-18018 May 1999 Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Non-cited Violations Noted.Major Areas Inspected:Engineering IR 05000416/19990041999-04-23023 April 1999 Insp Rept 50-416/99-04 on 990131-0320.Violations Noted. Major Areas Inspected:Operation,Maintenance,Engineering & Plant Support IR 05000416/19990011999-02-26026 February 1999 Insp Rept 50-416/99-01 on 990201-05.Violations Noted. Major Areas Inspected:Plant Support.Violation of TS 5.7.2 Identified for Failure to Control Locked High Radiation Area Around Spent Fuel Pool Cooling & Cleanup HX IR 05000416/19980151999-01-20020 January 1999 Insp Rept 50-416/98-15 on 981101-1212.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Suuport IR 05000416/19980161998-12-24024 December 1998 Insp Rept 50-416/98-16 on 981207-11.Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program Was Conducted ML20196F1271998-12-0101 December 1998 Insp Rept 50-416/98-13 on 980920-1031.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980141998-11-27027 November 1998 Insp Rept 50-416/98-14 on 981026-30.No Violations Noted. Major Areas Inspected:Exposure Controls,Controls of Radioactive Matls & Contamination,Surveying & Monitoring & Quality Assurance Oversight of Radiation Protection Program IR 05000416/19980111998-10-14014 October 1998 Insp Rept 50-416/98-11 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980121998-09-15015 September 1998 Insp Rept 50-416/98-12 on 980817-20.No Violations Noted. Major Areas Inspected:Training,Qualifications,Quality Assurance Oversight,Facilities & Equipment & Annual Reports IR 05000416/19980031998-09-0909 September 1998 Insp Rept 50-416/98-03 Cancelled IR 05000416/19980091998-08-31031 August 1998 Insp Rept 50-416/98-09 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980101998-08-26026 August 1998 Insp Rept 50-416/98-10 on 980803-07.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000416/19980081998-07-14014 July 1998 Insp Rept 50-416/98-08 on 980517-0627.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980071998-06-0202 June 1998 Insp Rept 50-416/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Packages & Vehicles, Assessment Aids & Mgt Support IR 05000416/19980051998-05-28028 May 1998 Insp Rept 50-416/98-05 on 980405-0516.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19980061998-05-19019 May 1998 Insp Rept 50-416/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Radiation Protection Activities in Support of 1998 Refueling Outage IR 05000416/19980041998-05-0505 May 1998 Insp Rept 50-416/98-04 on 980414-16.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000416/19983011998-04-16016 April 1998 Insp Rept 50-416/98-301 on 980330-0403.No Violations Noted. Major Areas Inspected:Competency of Reactor Operator & Eight Senior Applicants for Issuance of OLs at Grand Gulf Nuclear Station IR 05000416/19980021998-04-15015 April 1998 Insp Rept 50-416/98-02 on 980222-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980011998-03-0404 March 1998 Insp Rept 50-416/98-01 on 980111-0221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000416/19970221997-12-15015 December 1997 Insp Rept 50-416/97-22 on 971130-980110.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering IR 05000416/19970211997-12-0505 December 1997 Insp Rept 50-416/97-21 on 971019-1129.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970181997-11-25025 November 1997 Insp Rept 50-416/97-18 on 970804-22.Violations Noted.Major Areas Inspected:Operations & Maint.Nrc IP 40500 Used to Evaluate Licensee Effectiveness in Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations IR 05000416/19970201997-10-31031 October 1997 Insp Rept 50-416/97-20 on 970907-1018.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support Re Emergency Post Accident Sampling Sys Drill IR 05000416/19970161997-10-23023 October 1997 Insp Rept 50-416/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Licensed Operator Requalification Program Following Guidelines in IP 71001 IR 05000416/19970151997-10-0909 October 1997 Insp Rept 50-416/97-15 on 970916-19.Three Weaknesses Noted During Exercise.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000416/19970071997-10-0101 October 1997 Informs That Insp Rept 50-416/97-07 Has Been Cancelled & There Will Be No Insp Issued for This Rept Number IR 05000416/19970171997-09-0505 September 1997 Insp Rept 50-416/97-17 on 970804-08.No Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000416/19970131997-08-0606 August 1997 Partially Withheld Insp Rept 50-416/97-13 on 970714-18 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Review of Records,Repts,Testing,Maint & Assessment Aids IR 05000416/19970141997-08-0505 August 1997 Insp Rept 50-416/97-14 on 970714-17.Violations Noted. Major Areas Inspected:Plant Support & Program to Maintain Occupational Exposures ALARA & Training & Qualifications of Members of Radiation Protection Organization IR 05000416/19970091997-07-16016 July 1997 Insp Rept 50-416/97-09 on 970623-27.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000416/19970101997-07-0202 July 1997 Insp Rept 50-416/97-10 on 970602-05.No Violations Noted. Major Areas Inspected:Plant Support Including Liquid & Gaseous Radwaste Effluent Mgt Program,Radiological Environ Program & Meteorological Monitoring Program IR 05000416/19970111997-06-25025 June 1997 Partially Withheld Insp Rept 50-416/97-11 on 970602-06 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Records,Repts, Testing & Maint,Vital Area Barriers & Security Audit IR 05000416/19970051997-05-29029 May 1997 Insp Rept 50-416/97-05 on 970310-27.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering Procedures IR 05000416/19970061997-05-27027 May 1997 Insp Rept 50-416/97-06 on 970323-0510.Violations Noted.Major Areas Inspected:Licensee Operations,Including Emergency Procedure,Maint,Engineering & Plant Support ML20140E6411997-04-24024 April 1997 Insp Rept 50-416/97-03 on 970209-0322.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support Activities IR 05000416/19960211997-02-25025 February 1997 Insp Rept 50-416/96-21 on 961221-970208.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support IR 05000416/19970021997-02-19019 February 1997 Insp Rept 50-416/97-02 on 970203-07.No Violations Noted. Major Areas Inspected:External & Internal Exposure Control Programs,Calibration of Portable Radiation Protection Instrumentation & Whole Body Counting Equipment IR 05000416/19960201997-01-0808 January 1997 Insp Rept 50-416/96-20 on 961110-1221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support 1999-09-29
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000416/19990121999-09-29029 September 1999 Insp Rept 50-416/99-12 on 990725-0904.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990111999-09-28028 September 1999 Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Management Program,Radioactive Matl Transportation Program,Facilities & Equipment,Staff Knowledge & Performance & Staff Training IR 05000416/19990141999-09-27027 September 1999 Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program & Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000416/19990151999-09-13013 September 1999 Partially Withheld Insp Rept 50-416/99-15 on 990816-20. Noncited Violation Noted.Major Areas Inspected:Licensee Physical Security Program,Personnel Access Control,Access Authorization & Protected Area Detection Aids IR 05000416/19990101999-08-24024 August 1999 Insp Rept 50-416/99-10 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000416/19990091999-08-0909 August 1999 Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990031999-07-30030 July 1999 Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified.Major Areas Inspected:Corrective Action Program Implementation IR 05000416/19990071999-07-23023 July 1999 Insp Rept 50-416/99-07 on 990622-25.Violations Noted.Major Areas Inspected:Announced Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000416/19990081999-07-15015 July 1999 Insp Rept 50-416/99-08 on 990502-0612.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990051999-06-27027 June 1999 Insp Rept 50-416/99-05 on 990321-0501.Violations Identified, Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990061999-05-21021 May 1999 Insp Rept 50-416/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000416/19990021999-05-18018 May 1999 Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Non-cited Violations Noted.Major Areas Inspected:Engineering IR 05000416/19990041999-04-23023 April 1999 Insp Rept 50-416/99-04 on 990131-0320.Violations Noted. Major Areas Inspected:Operation,Maintenance,Engineering & Plant Support IR 05000416/19990011999-02-26026 February 1999 Insp Rept 50-416/99-01 on 990201-05.Violations Noted. Major Areas Inspected:Plant Support.Violation of TS 5.7.2 Identified for Failure to Control Locked High Radiation Area Around Spent Fuel Pool Cooling & Cleanup HX IR 05000416/19980151999-01-20020 January 1999 Insp Rept 50-416/98-15 on 981101-1212.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Suuport IR 05000416/19980161998-12-24024 December 1998 Insp Rept 50-416/98-16 on 981207-11.Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program Was Conducted ML20196F1271998-12-0101 December 1998 Insp Rept 50-416/98-13 on 980920-1031.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980141998-11-27027 November 1998 Insp Rept 50-416/98-14 on 981026-30.No Violations Noted. Major Areas Inspected:Exposure Controls,Controls of Radioactive Matls & Contamination,Surveying & Monitoring & Quality Assurance Oversight of Radiation Protection Program IR 05000416/19980111998-10-14014 October 1998 Insp Rept 50-416/98-11 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980121998-09-15015 September 1998 Insp Rept 50-416/98-12 on 980817-20.No Violations Noted. Major Areas Inspected:Training,Qualifications,Quality Assurance Oversight,Facilities & Equipment & Annual Reports IR 05000416/19980031998-09-0909 September 1998 Insp Rept 50-416/98-03 Cancelled IR 05000416/19980091998-08-31031 August 1998 Insp Rept 50-416/98-09 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980101998-08-26026 August 1998 Insp Rept 50-416/98-10 on 980803-07.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000416/19980081998-07-14014 July 1998 Insp Rept 50-416/98-08 on 980517-0627.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980071998-06-0202 June 1998 Insp Rept 50-416/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Packages & Vehicles, Assessment Aids & Mgt Support IR 05000416/19980051998-05-28028 May 1998 Insp Rept 50-416/98-05 on 980405-0516.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19980061998-05-19019 May 1998 Insp Rept 50-416/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Radiation Protection Activities in Support of 1998 Refueling Outage IR 05000416/19980041998-05-0505 May 1998 Insp Rept 50-416/98-04 on 980414-16.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000416/19983011998-04-16016 April 1998 Insp Rept 50-416/98-301 on 980330-0403.No Violations Noted. Major Areas Inspected:Competency of Reactor Operator & Eight Senior Applicants for Issuance of OLs at Grand Gulf Nuclear Station IR 05000416/19980021998-04-15015 April 1998 Insp Rept 50-416/98-02 on 980222-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980011998-03-0404 March 1998 Insp Rept 50-416/98-01 on 980111-0221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000416/19970221997-12-15015 December 1997 Insp Rept 50-416/97-22 on 971130-980110.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering IR 05000416/19970211997-12-0505 December 1997 Insp Rept 50-416/97-21 on 971019-1129.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970181997-11-25025 November 1997 Insp Rept 50-416/97-18 on 970804-22.Violations Noted.Major Areas Inspected:Operations & Maint.Nrc IP 40500 Used to Evaluate Licensee Effectiveness in Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations IR 05000416/19970201997-10-31031 October 1997 Insp Rept 50-416/97-20 on 970907-1018.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support Re Emergency Post Accident Sampling Sys Drill IR 05000416/19970161997-10-23023 October 1997 Insp Rept 50-416/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Licensed Operator Requalification Program Following Guidelines in IP 71001 IR 05000416/19970151997-10-0909 October 1997 Insp Rept 50-416/97-15 on 970916-19.Three Weaknesses Noted During Exercise.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000416/19970071997-10-0101 October 1997 Informs That Insp Rept 50-416/97-07 Has Been Cancelled & There Will Be No Insp Issued for This Rept Number IR 05000416/19970171997-09-0505 September 1997 Insp Rept 50-416/97-17 on 970804-08.No Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000416/19970131997-08-0606 August 1997 Partially Withheld Insp Rept 50-416/97-13 on 970714-18 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Review of Records,Repts,Testing,Maint & Assessment Aids IR 05000416/19970141997-08-0505 August 1997 Insp Rept 50-416/97-14 on 970714-17.Violations Noted. Major Areas Inspected:Plant Support & Program to Maintain Occupational Exposures ALARA & Training & Qualifications of Members of Radiation Protection Organization IR 05000416/19970091997-07-16016 July 1997 Insp Rept 50-416/97-09 on 970623-27.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000416/19970101997-07-0202 July 1997 Insp Rept 50-416/97-10 on 970602-05.No Violations Noted. Major Areas Inspected:Plant Support Including Liquid & Gaseous Radwaste Effluent Mgt Program,Radiological Environ Program & Meteorological Monitoring Program IR 05000416/19970111997-06-25025 June 1997 Partially Withheld Insp Rept 50-416/97-11 on 970602-06 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Records,Repts, Testing & Maint,Vital Area Barriers & Security Audit IR 05000416/19970051997-05-29029 May 1997 Insp Rept 50-416/97-05 on 970310-27.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering Procedures IR 05000416/19970061997-05-27027 May 1997 Insp Rept 50-416/97-06 on 970323-0510.Violations Noted.Major Areas Inspected:Licensee Operations,Including Emergency Procedure,Maint,Engineering & Plant Support ML20140E6411997-04-24024 April 1997 Insp Rept 50-416/97-03 on 970209-0322.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support Activities IR 05000416/19960211997-02-25025 February 1997 Insp Rept 50-416/96-21 on 961221-970208.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support IR 05000416/19970021997-02-19019 February 1997 Insp Rept 50-416/97-02 on 970203-07.No Violations Noted. Major Areas Inspected:External & Internal Exposure Control Programs,Calibration of Portable Radiation Protection Instrumentation & Whole Body Counting Equipment IR 05000416/19960201997-01-0808 January 1997 Insp Rept 50-416/96-20 on 961110-1221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support 1999-09-29
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000416/19990121999-09-29029 September 1999 Insp Rept 50-416/99-12 on 990725-0904.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990111999-09-28028 September 1999 Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Management Program,Radioactive Matl Transportation Program,Facilities & Equipment,Staff Knowledge & Performance & Staff Training IR 05000416/19990141999-09-27027 September 1999 Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program & Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000416/19990151999-09-13013 September 1999 Partially Withheld Insp Rept 50-416/99-15 on 990816-20. Noncited Violation Noted.Major Areas Inspected:Licensee Physical Security Program,Personnel Access Control,Access Authorization & Protected Area Detection Aids IR 05000416/19990101999-08-24024 August 1999 Insp Rept 50-416/99-10 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000416/19990091999-08-0909 August 1999 Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990031999-07-30030 July 1999 Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified.Major Areas Inspected:Corrective Action Program Implementation IR 05000416/19990071999-07-23023 July 1999 Insp Rept 50-416/99-07 on 990622-25.Violations Noted.Major Areas Inspected:Announced Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000416/19990081999-07-15015 July 1999 Insp Rept 50-416/99-08 on 990502-0612.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990051999-06-27027 June 1999 Insp Rept 50-416/99-05 on 990321-0501.Violations Identified, Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990061999-05-21021 May 1999 Insp Rept 50-416/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000416/19990021999-05-18018 May 1999 Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Non-cited Violations Noted.Major Areas Inspected:Engineering IR 05000416/19990041999-04-23023 April 1999 Insp Rept 50-416/99-04 on 990131-0320.Violations Noted. Major Areas Inspected:Operation,Maintenance,Engineering & Plant Support IR 05000416/19990011999-02-26026 February 1999 Insp Rept 50-416/99-01 on 990201-05.Violations Noted. Major Areas Inspected:Plant Support.Violation of TS 5.7.2 Identified for Failure to Control Locked High Radiation Area Around Spent Fuel Pool Cooling & Cleanup HX ML20207E0881999-02-26026 February 1999 Notice of Violation from Insp on 990201-05.Violation Noted: on 990201,NRC Inspectors Identified That Area with Dose Rates Greater than 1000 M/H Not Provided with Locked or Continously Guarded Doors to Prevent Unauthorized Entry IR 05000416/19980151999-01-20020 January 1999 Insp Rept 50-416/98-15 on 981101-1212.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Suuport PNO-IV-99-005, on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed1999-01-13013 January 1999 PNO-IV-99-005:on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed ML20198L7711998-12-24024 December 1998 Notice of Violation from Insp on 981207-11.Violation Noted: on 950630,licensee Made Change to Emergency Plan Without Commission Approval IR 05000416/19980161998-12-24024 December 1998 Insp Rept 50-416/98-16 on 981207-11.Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program Was Conducted ML20196F1271998-12-0101 December 1998 Insp Rept 50-416/98-13 on 980920-1031.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196F1141998-12-0101 December 1998 Notice of Violation from Insp on 980920-1031.Violation Noted:From 980521 Through 981015,conditions Adverse to Quality Identified in Condition Rept 1998-0014 Not Promptly Corrected IR 05000416/19980141998-11-27027 November 1998 Insp Rept 50-416/98-14 on 981026-30.No Violations Noted. Major Areas Inspected:Exposure Controls,Controls of Radioactive Matls & Contamination,Surveying & Monitoring & Quality Assurance Oversight of Radiation Protection Program IR 05000416/19980111998-10-14014 October 1998 Insp Rept 50-416/98-11 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980121998-09-15015 September 1998 Insp Rept 50-416/98-12 on 980817-20.No Violations Noted. Major Areas Inspected:Training,Qualifications,Quality Assurance Oversight,Facilities & Equipment & Annual Reports IR 05000416/19980031998-09-0909 September 1998 Insp Rept 50-416/98-03 Cancelled IR 05000416/19980091998-08-31031 August 1998 Insp Rept 50-416/98-09 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980101998-08-26026 August 1998 Insp Rept 50-416/98-10 on 980803-07.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000416/19980081998-07-14014 July 1998 Insp Rept 50-416/98-08 on 980517-0627.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980071998-06-0202 June 1998 Insp Rept 50-416/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Packages & Vehicles, Assessment Aids & Mgt Support ML20248E7501998-05-28028 May 1998 Notice of Violation from Insp on 980405-0516.Violation Noted:On 980421,inspectors Found Back Doors on Diesel Generator Control Cabinet 1H22-p400 in Div 1 Standby Diesel Generator Room Standing Wide Open & Unattended IR 05000416/19980051998-05-28028 May 1998 Insp Rept 50-416/98-05 on 980405-0516.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19980061998-05-19019 May 1998 Insp Rept 50-416/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Radiation Protection Activities in Support of 1998 Refueling Outage IR 05000416/19980041998-05-0505 May 1998 Insp Rept 50-416/98-04 on 980414-16.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000416/19983011998-04-16016 April 1998 Insp Rept 50-416/98-301 on 980330-0403.No Violations Noted. Major Areas Inspected:Competency of Reactor Operator & Eight Senior Applicants for Issuance of OLs at Grand Gulf Nuclear Station IR 05000416/19980021998-04-15015 April 1998 Insp Rept 50-416/98-02 on 980222-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980011998-03-0404 March 1998 Insp Rept 50-416/98-01 on 980111-0221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000416/19970221997-12-15015 December 1997 Insp Rept 50-416/97-22 on 971130-980110.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering IR 05000416/19970211997-12-0505 December 1997 Insp Rept 50-416/97-21 on 971019-1129.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L9411997-11-25025 November 1997 Notice of Violation from Insp on 970804-22.Violation Noted: on or About Period of 970117-29,approved FP Program as Described in UFSAR Was Not Fully Implemented.Emergency Light 1T92S222A Was Not Capable of Performing Function IR 05000416/19970181997-11-25025 November 1997 Insp Rept 50-416/97-18 on 970804-22.Violations Noted.Major Areas Inspected:Operations & Maint.Nrc IP 40500 Used to Evaluate Licensee Effectiveness in Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations IR 05000416/19970201997-10-31031 October 1997 Insp Rept 50-416/97-20 on 970907-1018.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support Re Emergency Post Accident Sampling Sys Drill ML20198Q0291997-10-31031 October 1997 Notice of Violation from Insp on 970907-1018.Violation Noted:As of 971011,security Patrols Had Not Reported Dark Areas in Temporary Covered Maint Work Area in Protected Area IR 05000416/19970161997-10-23023 October 1997 Insp Rept 50-416/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Licensed Operator Requalification Program Following Guidelines in IP 71001 IR 05000416/19970151997-10-0909 October 1997 Insp Rept 50-416/97-15 on 970916-19.Three Weaknesses Noted During Exercise.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000416/19970071997-10-0101 October 1997 Informs That Insp Rept 50-416/97-07 Has Been Cancelled & There Will Be No Insp Issued for This Rept Number ML20216J2081997-09-12012 September 1997 Notice of Violation from Insp on 970803-0906.Violation Noted:As of 970811,duplex Filter Selection Levers for HPCS & Div 1 Standby DGs Were in Both Position Such That Two Strainers/Filters Were Selected IR 05000416/19970171997-09-0505 September 1997 Insp Rept 50-416/97-17 on 970804-08.No Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs ML20210N0761997-08-19019 August 1997 Notice of Violation from Insp on 970622-0802.Violation Noted:On 970630,inspectors Identified Extension Ladder Supported on safety-related Cable Tray & No Engineering Evaluation Had Been Completed IR 05000416/19970131997-08-0606 August 1997 Partially Withheld Insp Rept 50-416/97-13 on 970714-18 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Review of Records,Repts,Testing,Maint & Assessment Aids ML20216A8411997-08-0606 August 1997 Notice of Violation from Insp on 970714-18.Violation Noted: on 970717,compensatory Measures Not Implemented at Two Trailers within Protected Area Where Lighting Did Not Meet Required 0.2 Footcandles 1999-09-29
[Table view] |
Text
r~
jg3 Cteg UNITED STATES
.
.
g
'o NUCLEAR REGULATORY COMMISSION
[ 'i REGloN ll g
.
j 101 MARIETTA STREET, N.W.
g t
ATLANTA, GEORGIA 30323 s, v /
....
Report Nos.:
50-416/85-19 and 50-417/85-05 Licensee: Mississippi Power and Light Company Jackson, MS 39205 Docket Nos.:
50-416 and 50-417 License Nos.: NPF-29 and CPPR-119 Facility Name: Grand Gulf I and 2 Inspection Conduc d: May 28 - 31, 1985 d - #- 85'
Inspector:
4*? x
-
[ B.
'/
Date Signed ef
[ #- N Approved by:#
-
- ::
y
'E. J. 61ake, Secti Date Signed M
I Engineering Bra Division of c
Safety SUMMARY Scope: This routine, unannounced inspection entailed 27 inspector-hours on site in the areas of turbine bypass line indications (Unit 1), residual heat removal (RHR) heat exchanger vent line break (Unit 1), inservice testing (IST) of pumps and valves (Unit 1), ASME Code welding (Unit 2), nondestructive examination (NDE)
activities (Unit 2), safety-related piping activities (Unit 2), containment structural steel welding (Unit 2), and IE Bulletins (Units 1 and 2).
Results: No violations or deviations were identified.
.
f
.
.
REPORT DETAILS 1.
Persons Contacted Licensee Employees J. E. Cross, Grand Gulf Nuclear Station General Manager
- R. F. Rogers, III, Technical Assistant to Station General Manager S. F. Tanner, Manager, Nuclear Site QA
- L. F. Daughtery, Compliance Superintendent M. N. Bakarich, Nuclear Record Superintendent W. F. Adcock, Principal Mechanical Enginer-NPE
- B. C. Lee, QA Supervisor - Audits S. E. Thomas, Mechanical Systems Supervisor - NPE R. K. Dubey, Engineering Supervisor - Piping / Mechanical Analysis - NPE J. M. Feil, Materials Science Supervisor - NPE
- A. J. Malone, ISI Coordinator W. L. Justice, Materials Science Project Engineer - NPE M. D. Meier, Mechanical Systems Project Engineer - NPE J. D. Bailey, Compliance Coordinator Other licensee and contractor employees contacted included construction craftsmen, engineers, technicians, operators, security force members, and office personnel.
Other Organization J. F. Hudson, Project QA Manager, Bechtel D. W. Watt, Lead Field Welding QC Engineer, Bechtel M. Shows, Lead Field Welding Engineer, Bechtel
- P. J. Collins, QA Supervisor, Bechtel D. A. Lindsey, Lead Piping / Mechanical QC Engineer, Bechtel T. D. Kinnebrew, Assistant Lead Piping QC Engineer, Bechtel NRC Resident Inspectors
- R. C. Butcher, Senior Resident Inspector
- J. L. Caldwell, Resident Inspector
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on May 31, 1985, with those persons indicated in paragraph 1 above. The inspector described the'
areas inspected and discussed in detail the inspection findings.
The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio (
.
.
3.
Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspection.
4.
Unresolved Items Unresolved items were not identified during the inspection.
5.
Independent Inspection Effort (927068) (Units 1 and 2)
a.
General Inspection of Unit 2 The inspector conducted a general inspection of the Unit 2 reactor and auxiliary buildings to observe construction progress and general activities such as welding, material control, housekeeping, and storage. See paragraphs 6 and 10 for details of welding activities observed.
b.
Indications in Main Steam Bypass Pipe (Unit 1)
In September 1984, during testing at approximately 18% power, two failures occurred in turbine bypass line
"A" (see RII Report 50-416/
84-38 for a summary of these failures). After the second failure, the section of 18" diameter schedule 40 pipe between the bypass valve and the pressure breakdown assembly (PBA) was replaced with schedule 100 pipe. This modification was also accomplished on lines "B" and "C".
After replacement of the pipe, Wyle Lab recorded vibration measurements on line "A" using six accelerometers.
From the accelerometer data, calculated stresses and displacements were very small. On March 6, 1985, after removal of an accelerometer block, nondestructive examina-tion (NDE) of line "A" identified a 1 1/2 long indication in the 18" diameter, schedule 100 pipe near the pipe to PBA weld. This indication was identified after approximately 1740 hours0.0201 days <br />0.483 hours <br />0.00288 weeks <br />6.6207e-4 months <br /> of bypass operation with the thicker wall pipe.
The indication was not thru wall and was repaired.
After the repair, an inservice monitoring program was developed for the three 18" schedule 100 bypass lines consisting of 100% visual (VT), magnetic particle (MT) of the welds and 6" of base material on each side of the welds, and ultrasonic (UT) for mapping any
'
,
questionable indications.
On May 8, 1985, as part of the inservice monitoring program, a 10" long MT indication was identified in line
"A" near the 18" pipe to valve weld.
This occurred after approximately 116 hours0.00134 days <br />0.0322 hours <br />1.917989e-4 weeks <br />4.4138e-5 months <br /> of turbine bypass operation since identification of the 1 1/2" indication. The presence of a flaw was verified using ultrasonic (UT) examination. The actual depth of the flaw could not be determined due to difficulty of UT on the pipe surface at a high temperature. However, the data did provide approximate flaw depths and profile.
Line "A" was isolated and MP&L and General Electric (GE) performed analysis to show that the plant could be safely operated without the "A" bypass line.
,
_
__
_-
.
_
-
.
f
.
.
On May 18, 1985, the schedule 100 pipes on all three bypass lines were VT and MT inspected 100%. The MT revealed that the 10" flaw previously identified on May 8,1985, continued as a broken flaw for a total of 27 7/8".
The flaw ran in a spiral around the pipe starting about 2 o' clock near the pipe to valve weld and extending to about 6 o' clock.
Four other linear indications, ranging in length from 3/8" to 7/8" were identified. The flaw areas were UT inspected and the deepest area was approximately 1/4".
No similar indications were identified on lines
"B" and "C".
The licensee is continuing to evaluate the flaws in bypass line "A" to try to determine the nature of the flaws and thus the failure mechanism.
c.
On May 21, 1985, during steam condensing mode, a 3/4" drain line on RHR heat exchanger 1B broke. The failure was a clean break in the drain pipe at the toe of the socket weld connecting the line to the heat exchanger nozzle.
The licensee indicated that the failure appeared to be caused by high-cycle fatigue due to flow-induced vibration. MNCR 0277-85 was issued to document corrective actions.
The licensee determined that the drain line support system was not adequately designed due to a misapplication of the piping specification. The line was too flexible.
The licensee's investigation revealed that the misapplication of the piping specification was a personnel error and an isolated case. Design Change Package 85/4032 was issued to repair the drain line and add and modify pipe supports to control pipe vibration.
The inspector discussed the problem with responsible licensee personnel and reviewed MNCR 0277-85 and Design Change Package 85/4032.
d.
Inservice Testing (IST) of Pumps and Valves (Unit 1)
The inspector discussed the IST program with licensee personnel as indicated below. Based on the Operating License date of June 16, 1982, the applicable code for IST, as required by 10 CFR 50.55(a)g and Technical Specification 4.0.5, is ASME Section XI,1977 Edition, S79 Addenda.
However, the licensee has updated their program to ASME Section XI, 1980 Edition, W80 Addenda as allowed by 10 CFR 50.55(a)g.
The IST program is prescribed by MP&L Specification, MP&L-M-189.1, Revision 0,
"MP&L Pump and Valve Inservice Inspection Program."
Revision 1 to the program, incorporating the latest NRC comments and MP&L's submittal to NRC, is being reviewed for issuance.
(1) The below listed implementing procedures were reviewed to verify that the licensee had assigned responsibilities for: preparation, review, and approval of ISI procedures; scheduling of IST; performance of test functions; performance of maintenance; and'
performance of calibrations.
-
Administrative Procedure 01-S-06-12, R9, "GGNS Surveillance Program"
\\
(
.
.
Administrative Procedure 01-S-01-1, R13, TCN #3, " Grand Gulf
-
Nuclear Station Organization" Administrative Procedure 01-S-07-1, R14, TCN #24, " Control of
-
Work on Plant Equipment and Facilities" Administrative Procedure 01-1-07-10, R2, "Preservice and
-
Inservice Inspection" Administrative Procedure 01-S-07-7, R8,
" Planning and
-
Scheduling Plant Maintenance Work" Administrative Procedure 01-S-07-3, R7, TCN #2, " Calibration
-
and Control of Measuring and Test Equipment" Administrative Procedure 01-S-07-08, R6,
" Control of
-
Permanent Plant I&C Equipment Calibration" (2) The inspector reviewed the two administrative procedures listed below and a sample of the change and issue records for the four surveillance procedures listed below to verify adequate control of issue and revision of test procedure.
Administrative Procedure 01-S-06-12, R9
-
Administrative Procedure 01-S-02-2, R20,
" Control and
-
Distribution of GGNS Operations Manual" Surveillnce Procedure 06-0P-SP21-Q-0001, R22, " Makeup Water
-
Treatment Quarterly Valve Test" Surveillance Procedure 06-0P-SP64-Q-0009, R21,
"Fi re
-
Protection System Quarterly Valve Testing" Surveillance Procedure 06-0P-1C41-M-0001, R22,
" Standby
-
Liquid Control Operability" Surveillance Procedure 06-0P-1E12-Q-0023, R23, "LPCI/RHR,
-
Subsystem A, Quarterly Functional Test" (3) Through discussions with test and scheduling personnel and reviewing of the following documents, the inspector verified that, in general, tests are scheduled at the required frequency.
MP&L Specification M-189.1, R0
-
Administrative Procedure 01-S-06-12, R9
-
Technical Section Procedure 09-S-05-8, R0, " Surveillance
-
Procedure Scheduling"
/
.
.
The four Surveillance Procedures listed in paragraph (2)
-
above.
Within the areas inspected, no violations or deviations were identified.
6.
Nuclear Welding (55050) (Unit 2)
The inspector examined the licensee's program for ASME Code welding as indicated below to determine whether application code and regulatory requirements were being met.
The applicable code is the ASME Boiler and Pressure Vessel Code,Section III,1974 Edition including Addenda through the Summer of 1974.
a.
Welder Performance Qualification The inspector reviewed the qualification records and status records for the below listed welders relative to the field welds listed in paragraph b. below.
P177 P2381 P2509 P822 P294 b.
Production Welding The inspector observed the below listed welds at the indicated stage of completion:
ISO Weld Size Status Q2P41-G005-C01
Lugs Fill welding in process M-2544C
2" Socket Fill welding in process M-2358C
2h" Sch. 40 Fitup in process M-2358C
2h" Sch. 40 Fitup in process M-2358C
2 " Sch. 40 Final weld in process M-2358C
2 " Sch. 40 Final weld in process M-2548E &
1 " Sch. 80 Observed fitup and first FCN-PR2-0098 pass welding M-2548E
1h" Sch. 80 Fill welding in process The welding was observed to determine whether:
f
.
.
Work was being conducted in accordance with a document which
-
coordinates and sequences operations, references procedures, establishes hold points, and provides for production and inspection approval.
Weld identification and location were as specified.
-
Procedures, drawings, and other instructions were at the work
-
station and readily available.
Welding procedures specification (WPS) assignment was in accor-
-
dance with applicable code requirements.
-
Welding technique and sequence were the specified type and traceable to certifications.
-
Welding _ filler materials were the specified type and traceable procedure and was inspected.
Weld joint geometry was in accordance with applicable procedure
-
and was inspected.
Aligrment of parts was as specified.
-
Preheat and interpass temperatures were in accordance with
-
. procedures.
Electrodes were used in positions and with electrical charac-
-
teristics specified.
Shielding gas was in accordance with the welding procedure.
-
Welding equipment was in good condition.
-
Interpass cleaning was in accordance with applicable procedures.
-
-
Temporary attachments were removed in accordance with applicable procedures.
-
Gas purging, if specified, was in accordance with applicable procedures.
Process control system had provisions for repairs.
-
Welders were qualified.
-
No peening performed on root and surface layers.
-
Inspection personnel were qualified.
-
__ _ _-_,
_
_-
(
.
.
c.
Welding Material Control Receiving inspection and material certification documentation were reviewed for the following welding materials being used for the welding observed (see paragraphs 6b and 10b).
,
3/32" E7018 3/32" ER70S-2 3/32" ER308L
-
-
-
Ht. 411S61181 Ht. 5772 Ht. 776292
-
1/8" E7018 1/8" ER70S-2
-
1/8" ER308L
-
Ht. 74619 Ht. 401K0151 Ht. 741119 Weld material issue activities were examined for the Unit 2 weld material issue station in the areas of:
-
Storage of materials - identification, segregation and cleanliness Temperature control
-
Issue control
-
Handling of returns
-
Within the areas inspected, no violations or deviations were iden-tified.
7.
Visual Examination (57050) (Unit 2)
The inspector examined the VT examination activities described below to determine whether applicable code and regulatory requirements were being met.
See paragraph 6 above for the applicable code.
a.
The inspector observed the following in process VT examinations:
Dwg. M-2548E: Welds 38, 45, and 49 observed VT of final weld i
Dwg. M-2358C: Welds 7 and 24 observed VT of final weld Dwg. M-2548E: Weld 81 observed fitup The examinations were observed to verify that:
Applicable instructions or travelers clearly specified the
-
procedure to be used and that a copy of the procedure was available for the inspection Personnel performing the examinations were qualified
-
Required tools and aids were available
-
l
--
-
--
-
-
...
_.
.
--
.
.
Specific areas, locations and extent of examination were clearly
-
defined
-
Test attributes were specified and consistent with applicable procedures Defects were evaluated in accordance with applicable procedure and
-
inspection results were reported as required b.
Personnel qualification / certification records for NDE personnel who performed the VT inspections of the welds in paragraphs a. above were reviewed.
Within the areas inspected, no violations or deviations were identified.
8.
Liquid Penetrant Examination (57060) (Unit 2)
The inspector examined the liquid penetrant (PT) examination activities described below to determine whether applicable code and regulatory requirements were being met. See paragraph 6 above for the applicable code.
a.
The inspector observed in process PT inspection for the following welds:
Dwg. M-2548E: Welds 38 and 49 Dwg. M-2544C: Weld 2 The examinations were observed to verify that:
Applicable instructions or travelers clearly specified the
-
procedure to be used and that a copy of the procedure was available for the inspection.
-
Sequencing of examinations relative to other operations were specified and in accordance with applicable code and procedures
-
Personnel performing the examinations were qualified Materials used for the examinations were certified and the
-
certifications met applicable requirements Areas, locations and extent of examinations were clearly defined
-
The following attributes were as specified in the applicable
-
procedure and consistent with applicable code:
(1) Surface preparation / cleaning method, type, time, etc.
(2) Penetrant type (3) Penetrant application method
.
.
.
>
,
f (4) Penetration time (5) Temperature of surfaces
'
(6) Penetrant removal (7) Drying (8) Developer, application, type (9) Developing time (10) Evaluation technique
,
'
(11) Acceptance criteria a
(12) Reporting of results
,
,
b.
Personnel qualifications / certifications records for NDE personnel who performed the PT inspections of the welds listed in paragraphs a. above were reviewed.
c.
Material certification records for the below listed PT materials, used to inspect the welds listed in paragraph a. above, were reviewed.
Remover
- DR60 - Batch 33K4 Penetrant - DP40 - Batch 26H1
,
Developer - D100 - Batch 41586 Within the areas inspected, no violations or deviations were identified.
9.
Safety-Related Piping - Observation of Work and Work Activities.(490638)
(Unit 2)
The inspector observed the work activities below relative to safety-related piping to determine whether work was being conducted in accordance with applicable procedure and code requirements.
See paragraph 6 above for the
>
applicable code.
Work activities listed below were observed to determine whether requirements were being met in the following areas, as applicable:
,
Conformance with inspection (QC) and work performance procedures
-
-
-
Conformance with recordkeeping requirements Conformance with construction / installation specifications
-
Issuance and use of materials as specified
-
-
Performance of~ prescribed inspections
-
Performance of prescribed NDE activities
-
Calibration and use of proper measuring and test equipment Utilization of qualified inspection (QC) and NCE personnel
-
w
-
.
,
<
l
.
.
'
<
,
<
I Specific activitias observed were:,
<
'
i Installation, activities, including idedtification and cleanliness
-
verification, of pipe spools Q2P41-G003-05, 06, 19 and 20 at field
1.
welds 7 and 24 on drawing M-2358C.
-
Installation activities, including identification and, cleanliness verification, of pipe spool Q2E12-G115-01H-20 at field weld 81 on drawing M-2548E.
,
'
' Installation activities of pips spool Q2E12-G115-14-20 at field weld 38
-
on drawing M-2548E.
>
,
Laydown yard storage of pipe spools Q2P41-G008-04-24, Q2P41-G008-03-24,
-
Q2E61-G001-06-23, Q2G41-G016-38-23, Q2E12-G017-01-23, Q2G41-G009-21-22, and in plant storage of stool Q2P41-G003-07-22.
'
Within the areas inspected, no violations or deviations were identified.
,
10.
Containment (Structural Steel Welding) - Observation of Work & Work Activities (55053B) (Unit 2)
,
-
The inspector observed in process welding off' containment structures as indicated below to determine whether applicable code and procedure require-mentsi,were being met. The applicable codes for this welding are the AWS structural welding code D1.1, 1982 edition and Bechtel Specffication C-133.0, Revision 17.
a.
In process welding for the following structures inside the containment
/
'
was observed:
,'
"
ISI Platform P-4
'
,
Dwg. C-2040A
/
WP & IR Q2M20-Y-2317380A, Rpt. #5
.
FCN C2-0976 e
'
Welding bracket to heam 614B3 at intersection of beams 61483 anc 112B18.
.f
>
'
Main steam hanger and snubber supports Dwg. C-2086J
'
Section J welds
,' The work was compared with applicable requirements in the areas of:
,
Weld identification /Socation
-
-
Joint preparation and alignment
-
,
Use of applicable' weld procedure
-
-
Welder qualified to perform weld
"
Use of specified filler material
-
.,
-
Repair procedures
,
h h
s
,
e
'
j i
e s
f- ~
c i
..-
.. a
,.
>
.
IIDE performed at proper stage of fabrication
-
Periodic che,cks of welding variables
-
b.
Weld material control w'as examined (see paracraph 6.c dbove).
c '.
Work areas' were observed for.the presence of uncontrolled filler
material.
'
j d.
The inspector examined the 1bvel of OA/QC involvement in the above l
,we ding ~ activities.
' '
e.
Welder qualification records and status records for the below listed a
welders relative to the welds listed in paragraph a.
above were
'
reviewed.
.
-I4b0
,
P 250
'
Within the areas inspected, no violations or deviations were identified.
+
,
11.
IE Bulletins (92703) (Units 1 and 2)
)
(Closed) 416,' i417/83-BU-07, Apparently Fraudulent Products Sold By Ray Miller, Inc. : The inspector reviewed the licensee's internal correspondence and responses' to NRC, AECM-84/0391 dated August 16, 1984, AECM-84/0083 dated March 13,1984, and AECM-84/0126 dated May 24, 1984.
The licensee's and
their contractor's investigations revealed that no Ray Miller products were purchased or installed at Grand Gulf Units 1 and 2.
,
t.
I
,
-
,
i s
,
s,
i
,
!
!
l
.
l
,
s
,
.
g ( '
- -
- -.,.., -..
-- -