Forwards Insp Rept 50-416/99-04 on 990131-0320.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
ML20206B360
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/23/1999
From: Tapia J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eaton W
ENTERGY OPERATIONS, INC.
Shared Package
ML20206B364 List:
References
50-416-99-04, 50-416-99-4, NUDOCS 9904290220
Download: ML20206B360 (5)


See also: IR 05000416/1999004

Text

e

[p#"%g\\

t

UNITED STATES

NUCLEAR REGULATORY COMMISSION

,

5-

l

REGloN IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON, TEXAS 76011-8064

,,,,,

APR 231999

William A. Eaton, Vice President

Operations - Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT: NRC INSPECTION REPORT NO. 50-416/99-04

Dear Mr. Eaton:

This refers to the inspection conducted on January 31 through March 20,1999, at the Grand

Gulf Nuclear Station facility. The enclosed report presents the results of this inspection.

During the 7-week period covered by this inspection, your conduct of activities at the Grand

Gulf facility was generally characterized by safety-conscious operations, sound engineering and

maintenance practices, and careful radiological work controls.

Based on the results of this inspection, the NRC has determined that three violations of NRC

requirements occurred. These violations are being treated as noncited violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violation or severity level of these NCVs, you

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington DC 20555-0001, with copies to the Regional Administrator, Region IV, and the

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

,

Sincere ,

.

k

eph I. Tapia,

ief

Project Branch A

Division of Reactor Projects

Docket No.:

50-416

License No.: NPF-29

9904290220 990423

PDR

ADOCK 05000416

G

PDR

1

-

.

.

Entergy Operations, Inc.

-2-

Enclosure:

NRC Inspect;on Report No.

50-416/99 04-

cc w/enclosun1:

Executive Vics President

and Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

1

Winston & Strawn

1400 L Street, N.W. - 12th Floor

Washington, D.C. 20005-3502

Sam Mabry, Director

i

Division of Solid Waste Management

Min.issippi Department of Natural

Resources -

P.O. Box 10385

Jackson, Mississippi 39209

I

President

Claiborne County Board of Supervisors

Port Gibson, Mississippl 39150

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port G;oson, Mississippl 39150

The Honorable Richard leyoub

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005'

Baton Rouge, Louisiana 70804-9005

Office of the Governor -

State of Mississippi

'

Jackson, Mississippi 39201

s

rE

l

.*

,.

Entergy Operations, Inc.

-3-

- Mike Moore, Attomey General

-

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 22947

~ Jackson, Mississippi 39225

- Dr. F. E. Thompson, Jr.

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39205

Robert W. Goff, Director

State Liaison Officer

Division of Radiation Health

Masissippi Department of Health

P.O. Box 1700

Jackson, Mississippi 39215-1700

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

Vice President, Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

,

, _ _ .

4

.

.

l

-4-

APR 231999

.

l

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

I

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

l

E-Mail report to Frank Talbot (FXT)

L

t

bec to DCD (IE35)-

bec distrib. by RIV:

)

I

. Regional Administrator

Resident inspector

l

DRP Dire.,ar

DRS-PSB

DRS Director

MIS System

Branch Chief (DRP/A)

RIV File

Project Engineer (DRP/A)

l

Branch Chief (DRP/TSS)

l

I

1

DOCUMENT NAME: R:\\_GG\\GG904RP.JJR

10 receive copy of document, Indicate in box: *C" = Copy without enclosures *E" s Copy with enclosures 'N" = No copy

RIV: SRI-DRP/A

Rl:GG

n

C:DRP/A /7

.

,

JJRussell Mald

PJAltpr & /'3lTapia T M

i

044@99 - MM 04/999 W 048 99 /) ' O

Q

OFFICIAL RECOMD COPY

1

i

f

a

-4-

g . 231999

E-Mail report to T. Frye (TJF).

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (1

)'

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director --

DRS-PSB

DRS Director

MIS System

Branch Chief (DRP/A)

RIV File

Project Engineer (DRP/A)

Branch Chief (DRP/TSS)

29001"i

DOCUMENT NAME: R:\\_GG\\GG904RP.JJR

' To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy

RIV: SRI-DRP/A

RI:GG

n

C:DRP/A A

.

,

JJRussell kWd

PJAlter \\kb"JITapia T lbi

04/l@99 \\ M.

04899 S4J A04d 99 / O

IQ

OFFICIAL RECOPID COPY

'