r 1
J
'y W**%,
e i
o UNITED STATES I
[
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-4001 July 1, 1999 Mr. William A. Eaton Vice President, Operations GGNS Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - RELIEF REQUESTS FOR THE SECOND 10-YEAR INTERVAL PUMP / ND VALVE INSERVICE TESTING
- PROGRAM (TAC NO. MA0196)
Dear Mr. Eaton:
By letter dated November 26,1997, as supplemented by letter dated February 18,1999, Entergy Operations, Inc. (EOl), submitted its second 10 year inservice testing (IST) program, which began on December 1,1997, for the Grand Gulf Nuclear Station (GGNS). In the updated program, EOl submitted the following relief requests for pump and valve inservice testing:
PRR-E12-01, Residual Heat Removal System Pumps E12C003A, B, & C PRR E21-01, Low Pressure Core Spray Pump E21C002 PRR E22-01, High Pressure Core Spray Pump E22C003
' PRR-P75-01, Standby Diesel Generator System Pumps P75C002A & B PRR-P81-01, HPCS Diesel Generator System Pump P81C002 VRR-B21-01, Main Steam Safety / Relief Valves and Automatic Depressurization System Valves (Ref. Section 3.1 of enclosed Safety Evaluation for valve identification)
VRR-B21-02. Feedwater System Valves B21F010A & B VRR-E38-01, Feedwater Leakage Control System Valves E38F002A & B; E38F003A & B
/f VRR-E51-01, Reactor Core Isolation Cooling System Valves E51F079 and E51F081
//
The staff's evaluation of the relief requests submitted in the letter of February 18,1999, is provided in the enclosed Safety Evaluation. Based on its evaluation, the staff concludes that the nine relief requests previously identified are authorized pursuant to Title 10 of the Code of
/
Federal Reaulations. Section 50.55a(a)(3)(ii), on tifa basis that imposition of the American f(
Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements would result in 1
v 9907080394 990701 PDR ADOCK 05000416 P
PDR g
J it
C s
gt
. A. _,
i I
W. A. Eaton
-2 July 1, 1999 hardship _without a compensating increase h 'the level of quality and syMy. The staff further concludes that EOl's proposed alternatives provide reasonable assurance of c,perational readineca for the affected pumps and valves.-
Sincerely, ORIGINAL SIGNED BY Robert A. Gramm, Chief, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-416
)
Enclosure:
As stated cc w/ encl: See next page DISTRIBUTION:
y. Docket File 1
PUBLIC i
PD4-1 r/f S. Richards (clo)
R. Scholl (RFS, SE only)
D.Lange
~
K. Brockman, RIV
' Y. S. Huang, EMEB D. Terao, EMEB
- SEE PREVIOUS CONCURRENCE To recetve a copy of Inis document, indicate "C" in the box OFFICE PDIV-1/PM C, PDIV-1/L6 Q OGC*
PDIV-1/SC C PSekerakk LBerry %
SUttal RGramm M NAME DATE 7 / / /99 9 / I /99 6/24/99 1 / l /99 DOCUMENT NAME: G:\\PDIV-1\\GrandGulf\\GG0196.REL.WPD OFFICIAL RECORD COPY i
j
h 1
y l
Grand Gulf Nuclear Station.
l.
cc:
J Executive Vice President General Manager, GGNS
& Chief Operating Officer Entergy Operations, Inc.
Entergy Operatior.s, Inc.
P. O. Box 756 P. O. Box 31995-Port Gibson, MS 39150 Jackson, MS 39286-1995 Attomey General Wise, Carter, Child & Caraway Department of Justice P. O. Box 651 State of Louisiana,
' Jackson, MS 39205.
P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strewn -
1400 L Street, N.W. - 12th Floor State Health Officer Washington, DC 20005-3502 State Board of llealth P. O. Box 1700 Director Jackson, MS 39205 Division of Gelid Waste Managen ent Mississippi Department of Natural Office of the Govemor
' Resources.
State of Mississippi P. O. Box 10385 Jackson, MS 39201 Jackson, MS 39209 Attomey General President, Asst. Attomey General Claibome County Board of Supervisors State of Mississippi P. O. Box 339 P. O. Box 22947 Port Gibson,'MS 39150 Jackson, MS 39225 Regional Administrator, Region IV Vice President, Operations Support U.S. Nuclear Regulatory Commission Entergy Operations, Inc.
611 Ryan Plaza Drive, Suite 1000 P.O. Box 31995
. Arlington, TX 76011 Jackson, MS 39286-1995 Senior Resident inspector Director, Nuclear Safety j
U. S. Nuclear Regulatory Commission and Regulatory Affairs P. O. Box 399 Entergy Operations, Inc.
Port Gibson, MS 39150 P.O. Box 756 Port Gibson, MS 39150 usy tese
--.