ML21288A538: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = Response to Request for Additional Information (RAI), Technical Specifications
| document type = Response to Request for Additional Information (RAI), Technical Specifications
| page count = 23
| page count = 23
| project = CAC:00102, EPID:L2021
| project = CAC:001028, EPID:L2021
| stage = Other
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-First Statement_______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        This certificate is conditioned upon fulfilling the requirements of 10 CFR Part 72, as applicable, the attached Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), and the conditions specified below:
CoC Body            Section I. Technology                                      No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          No Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                      No Contents (Selection A2                                    No Criteria)                A3                                No Appendix B.        Section 3 Limiting      L1                                No Technical          Conditions for          L2                                No Specifications      Operation (LCOs)*        L3                                No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                  No Controls A significant increase in                                  No the probability or consequences of an accident previously Risk Insight**:    evaluated in the cask Will removing      FSAR?
this                The possibility of a new or                                No requirement        different kind of accident from the CoC/TS being created compared result in          to those previously evaluated in the FSAR?
A Significant reduction in                                No the margin of safety for ISFSI or cask operation?
Page 1 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original Evaluation Summary                            Rewrite to specify correct contents of reorganized Appendices: This certificate is conditioned upon fulfilling the requirements of 10 CFR Part 72, as applicable, the attached Appendix A (Inspections, Tests and Evaluations), Appendix B (Technical Specifications), and the conditions specified below:
Page 2 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-Des.______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC
 
== Description:==
 
Model No.: HI-STORM FW MPC Storage System Description The HI-STORM FW MPC Storage System consists of the following components: (1) interchangeable multi-purpose canisters (MPCs), which contain the fuel; (2) a storage overpack (HI-STORM FW), which contains the MPC during storage; and (3) a transfer cask (HI-TRAC VW), which contains the MPC during loading, unloading and transfer operations. The MPC stores up to 44 pressurized water reactor fuel assemblies or up to 89 boiling water reactor fuel assemblies.
CoC Body            Section I. Technology                                    Yes Certified Design Section II. Design Features                                No Appendix A - Inspections, Tests, and                                        No Evaluations Section 1 Definitions, Use                              No and Application Section 2 Approved A1                                    No Contents (Selection A2                                  No Criteria)                A3                              No Appendix B.        Section 3 Limiting      L1                              No Technical          Conditions for          L2                              No Specifications      Operation (LCOs)*        L3                              No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                No Controls Risk Insight**:    A significant increase in                                No Will removing      the probability or this                consequences of an requirement        accident previously from the CoC/TS evaluated in the cask result in          FSAR?
Page 3 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original The possibility of a new or        Yes - since a different non-analyzed DSC different kind of accident        configuration could conceivably be loaded being created compared to those previously evaluated in the FSAR?
A Significant reduction in                              No the margin of safety for ISFSI or cask operation?
Evaluation Summary                            Keep in CoC Section I as this is a description of the dry storage system.
Page 4 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-1______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 1: Operating Procedures: Written operating procedures shall be prepared for handling, loading, movement, surveillance, and maintenance.
The users site-specific written operating procedures shall be consistent with the technical basis described in Chapter 9 of the FSAR.
CoC Body            Section I. Technology                                    No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          No Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                    No Contents (Selection A2                                    No Criteria)                A3                              No Appendix B.        Section 3 Limiting      L1                              No Technical          Conditions for          L2                              No Specifications      Operation (LCOs)*        L3                              No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                  No Controls A significant increase in                                No the probability or consequences of an accident previously Risk Insight**:    evaluated in the cask Will removing      FSAR?
this                The possibility of a new or                              No requirement        different kind of accident from the CoC/TS being created compared result in          to those previously evaluated in the FSAR?
A Significant reduction in                                No the margin of safety for ISFSI or cask operation?
Page 5 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original Evaluation Summary                            Deleted from CoC - not required as compliance with 10 CFR 72.150, which requires that documented procedures be followed, is a regulatory requirement that must be met.
Page 6 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-2______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 2: Acceptance tests and maintenance program: Written acceptance tests and a maintenance program shall be prepared consistent with the technical basis described in Chapter 10 of the FSAR. At completion of welding the MPC shell to baseplate, an MPC confinement weld helium leak test shall be performed using a helium mass spectrometer.
The confinement boundary welds leakage rate test shall be performed in accordance with ANSI N14.5 to leaktight criterion. If a leakage rate exceeding the acceptance criteria is detected, then the area of leakage shall be determined and the area repaired per ASME Code Section III, Subsection NB, Article NB-4450 requirements. Re-testing shall be performed until the leakage rate acceptance criterion is met.
CoC Body            Section I. Technology                                        No Certified Design Section II. Design Features                                    No Appendix A - Inspections, Tests, and                                            Yes Evaluations Section 1 Definitions, Use                                  No and Application Section 2 Approved A1                                        No Contents (Selection A2                                      No Criteria)                A3                                  No Appendix B.        Section 3 Limiting      L1                                  No Technical          Conditions for          L2                                  No Specifications      Operation (LCOs)*        L3                                  No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                    No Controls Risk Insight**:    A significant increase in                          First sentence - No Will removing      the probability or              Rest of Section - Yes. This test confirms the MPC has this                consequences of an                  been manufactured correctly and will provide requirement        accident previously                            confinement as designed.
from the CoC/TS evaluated in the cask result in          FSAR?
Page 7 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original The possibility of a new or                            No different kind of accident being created compared to those previously evaluated in the FSAR?
A Significant reduction in                              No the margin of safety for ISFSI or cask operation?
Evaluation Summary                            First sentence will be deleted as this statement merely refers to the FSAR and so does not need to be repeated in the CoC. The rest of this section will be moved to Appendix A as it describes a test to provide reasonable assurance that an MPC has been manufactured and will operate in conformance with the certified design, and that the confinement safety function will be performed.
Page 8 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-3_______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 3: Quality Assurance: Activities in the areas of design, purchase, fabrication, assembly, inspection, testing, operation, maintenance, repair, modification of structures, systems and components, and decommissioning that are important-to-safety shall be conducted in accordance with a Commission-approved quality assurance program which satisfies the applicable requirements of 10 CFR Part 72, Subpart G, and which is established, maintained, and executed with regard to the storage system.
CoC Body            Section I. Technology                                    No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          No Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                    No Contents (Selection A2                                    No Criteria)                A3                              No Appendix B.        Section 3 Limiting      L1                              No Technical          Conditions for          L2                              No Specifications      Operation (LCOs)*        L3                              No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                  No Controls A significant increase in                                No the probability or consequences of an Risk Insight**:
accident previously Will removing evaluated in the cask this FSAR?
requirement The possibility of a new or                              No from the CoC/TS different kind of accident result in being created compared to those previously evaluated in the FSAR?
Page 9 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original A Significant reduction in                            No the margin of safety for ISFSI or cask operation?
Evaluation Summary                            Delete from CoC - not required as compliance with the QA provisions in 10 CFR 72 Subpart G is a regulatory requirement that must be met.
Page 10 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-4______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 4: Heavy Loads Requirements: Each lift of an MPC, a HI-TRAC VW transfer cask, or any HI-STORM FW overpack must be made in accordance to the existing heavy loads requirements and procedures of the licensed facility at which the lift is made. A plant-specific review of the heavy load handling procedures (under 10 CFR 50.59 or 10 CFR 72.48, as applicable) is required to show operational compliance with existing plant specific heavy loads requirements.
Lifting operations outside of structures governed by 10 CFR Part 50 must be in accordance with Section 5.2 of Appendix A.
CoC Body            Section I. Technology                                      No Certified Design Section II. Design Features                                    No Appendix A - Inspections, Tests, and                                            No Evaluations Section 1 Definitions, Use                                  No and Application Section 2 Approved A1                                      No Contents (Selection A2                                      No Criteria)                A3                                No Appendix B.        Section 3 Limiting      L1                                No Technical          Conditions for          L2                                No Specifications      Operation (LCOs)*        L3                                No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                    Yes Controls A significant increase in                                  Yes the probability or            Adherence to heavy load lifting procedures is Risk Insight**:    consequences of an            necessary to preclude the possibility of a cask drop Will removing      accident previously            during loading operations inside the plants fuel this                evaluated in the cask          handling building (per 10 CFR 50) and during transfer requirement        FSAR?                          operations (per 10 CFR 72). A significant increase in from the CoC/TS                                    the probability of a cask drop would occur if these result in                                        heavy load handing procedures are not followed.
The possibility of a new or                                No different kind of accident Page 11 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original being created compared to those previously evaluated in the FSAR?
A Significant reduction in                              No the margin of safety for ISFSI or cask operation?
Evaluation Summary                            Move to Appendix B - Administrative Controls. Note that this administrative control is applicable to heavy load lifting procedures at the ISFSI. Lifts within the Reactor Building are governed by existing 10 CFR Part 50 license requirements.
Page 12 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-5_______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 5: Approved Contents: Contents of the HI-STORM FW MPC Storage System must meet the fuel specifications given in Appendix B to this certificate.
CoC Body            Section I. Technology                                      No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          No Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                      No Contents (Selection A2 Criteria)                A3 Appendix B.        Section 3 Limiting      L1                                No Technical          Conditions for          L2                                No Specifications      Operation (LCOs)*        L3                                No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                  No Controls A significant increase in                                  No the probability or consequences of an accident previously Risk Insight**:    evaluated in the cask Will removing      FSAR?
this                The possibility of a new or                                No requirement        different kind of accident from the CoC/TS being created compared result in          to those previously evaluated in the FSAR?
A Significant reduction in                                No the margin of safety for ISFSI or cask operation?
Evaluation Summary                                Delete from the CoC - This statement in the CoC merely points to information in the Appendices.
Page 13 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-6_______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 6: Design Features: Features or characteristics for the site or system must be in accordance with Appendix B to this certificate.
CoC Body            Section I. Technology                                      No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          No Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                      No Contents (Selection A2                                    No Criteria)                A3                                No Appendix B.        Section 3 Limiting      L1                                No Technical          Conditions for          L2                                No Specifications      Operation (LCOs)*        L3                                No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                  No Controls A significant increase in                                  No the probability or consequences of an accident previously Risk Insight**:    evaluated in the cask Will removing      FSAR?
this                The possibility of a new or                                No requirement        different kind of accident from the CoC/TS being created compared result in          to those previously evaluated in the FSAR?
A Significant reduction in                                No the margin of safety for        All important design features will be discussed in the ISFSI or cask operation?                                  CoC Page 14 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original Evaluation Summary                            Delete from CoC as this is an unnecessary cross-reference. All important design features will be included in the CoC or its Appendices.
Page 15 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-7______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 7: Changes to the CoC: The holder of this certificate who desires to make changes to the certificate, which includes Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), shall submit an application for amendment of the certificate.
CoC Body            Section I. Technology                                    No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          No Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                    No Contents (Selection A2                                    No Criteria)                A3                              No Appendix B.        Section 3 Limiting      L1                              No Technical          Conditions for          L2                              No Specifications      Operation (LCOs)*        L3                              No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                  No Controls A significant increase in                                No the probability or consequences of an accident previously Risk Insight**:    evaluated in the cask Will removing      FSAR?
this                The possibility of a new or                              No requirement        different kind of accident from the CoC/TS being created compared result in          to those previously evaluated in the FSAR?
A Significant reduction in                                No the margin of safety for ISFSI or cask operation?
Page 16 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original Evaluation Summary                            Delete from CoC - not required as 10CFR72.244 does not allow changes to the CoC of its appendices without an application for amendment to the certificate.
Page 17 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-8_______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 8: Special Requirements for First System in Place: The air mass flow rate through the cask system will be determined by direct measurements of air velocity in the overpack cooling passages for the first HI-STORM FW MPC Cask System placed into service by any user with a heat load equal to or greater than 30 kW. The velocity will be measured using direct measurements of air velocity in the inlet vents. An analysis shall be performed of the cask system with the taken measurements to demonstrate that the measurements validate the analytic methods described in Chapter 4 of the FSAR.
The thermal validation test and analysis results shall be submitted in a letter report to the NRC pursuant to 10 CFR 72.4. To satisfy condition 8 for casks of the same system type, in lieu of additional submittals pursuant to 10 CFR 72.4, users may document in their 72.212 report a previously performed test and analysis submitted by letter report to the NRC that demonstrates validation of the analytic methods described in Chapter 4 of the FSAR.
This condition does not apply to the unventilated version of the system.
CoC Body            Section I. Technology                                    No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          Yes Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                    No Appendix B.
Contents (Selection A2                                    No Technical Criteria)              A3                                No Specifications Section 3 Limiting      L1                                No Conditions for          L2                                No Operation (LCOs)*      L3                                No Page 18 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                No Controls A significant increase in        No. The flow rate test will still be performed in the probability or                  accordance with Chapter 9 of the FSAR.
consequences of an accident previously evaluated in the cask FSAR?
Risk Insight**:  The possibility of a new or      No. The flow rate test will still be performed in Will removing    different kind of accident          accordance with Chapter 9 of the FSAR.
this              being created compared requirement      to those previously from the CoC/TS  evaluated in the FSAR?
result in        A Significant reduction in      No. The test merely confirms the equipment has the margin of safety for      been manufactured and will operate in conformance ISFSI or cask operation?        with the certified design. The quality assurance program will still ensure that the SFSCs are manufactured and operate as designed. Furthermore, LCO 3.1.2 will still ensure the heat removal safety function of the SFSCs.
Evaluation Summary                            Delete from CoC - not required as the test merely confirms the equipment has been manufactured and will operate in conformance with the certified design.
The quality assurance program will still ensure that the SFSCs are manufactured and operate as designed.
Furthermore, LCO 3.1.2 will still ensure the heat removal safety function of the SFSCs.
Also, the second paragraph is not required as compliance with reporting specifications in 10 CFR 72.4 and 10 CFR 72.212 are regulatory requirements that must be met.
Page 19 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-9______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 9: Pre-operational Testing and Training Exercise: A dry run training exercise of the loading, closure, handling, unloading, and transfer of the HI-STORM FW MPC Storage System shall be conducted by the licensee prior to the first use of the system to load spent fuel assemblies. The training exercise shall not be conducted with spent fuel in the MPC. The dry run may be performed in an alternate step sequence from the actual procedures, but all steps must be performed CoC Body            Section I. Technology                                    No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          No Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                    No Contents (Selection A2                                    No Criteria)                A3                              No Appendix B.        Section 3 Limiting      L1                              No Technical          Conditions for          L2                              No Specifications      Operation (LCOs)*        L3                              No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                  Yes Controls A significant increase in                                N/A the probability or Risk Insight**:
consequences of an Will removing accident previously this evaluated in the cask requirement FSAR?
from the CoC/TS The possibility of a new or                              N/A result in different kind of accident being created compared Page 20 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original to those previously evaluated in the FSAR?
A Significant reduction in                              N/A the margin of safety for ISFSI or cask operation?
Evaluation Summary                            Move to Appendix B as these testing and training exercises ensure that the equipment will operate and perform safety functions as designed.
The specifics of dry run training should be performed by the general licensee prior to initial use of the system to load spent fuel. In addition, the general license's training program is subject to NRC inspection.
Page 21 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-10______
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement                                        CoC Condition 10: Authorization: The HI-STORM FW MPC Storage System, which is authorized by this certificate, is hereby approved for general use by holders of 10 CFR Part 50 licenses for nuclear reactors at reactor sites under the general license issued pursuant to 10 CFR 72.210, subject to the conditions specified by 10 CFR 72.212, this certificate, and the attached Appendices A and B. The HI-STORM FW MPC Storage System may be fabricated and used in accordance with any approved amendment to CoC No. 1032 listed in 10 CFR 72.214.
Each of the licensed HI-STORM FW MPC Storage System components (i.e., the MPC, overpack, and transfer cask), if fabricated in accordance with any of the approved CoC Amendments, may be used with one another provided an assessment is performed by the CoC holder that demonstrates design compatibility. The HI-STORM FW MPC Storage System may be installed on an ISFSI pad with the HI-STORM 100 Cask System (USNRC Docket 72-1014) provided an assessment is performed by the CoC holder that demonstrates design compatibility.
CoC Body            Section I. Technology                                      No Certified Design Section II. Design Features                                  No Appendix A - Inspections, Tests, and                                          No Evaluations Section 1 Definitions, Use                                No and Application Section 2 Approved A1                                      No Contents (Selection A2                                    No Criteria)              A3                                No Appendix B.        Section 3 Limiting      L1                                No Technical          Conditions for          L2                                No Specifications      Operation (LCOs)*      L3                                No and Surveillance Requirements (SRs)
(Selection Criteria)
Section 4 Administrative                                  No Controls Page 22 of 23
 
CoC Condition/Technical Specification Evaluation Form - CoC original A significant increase in                            No the probability or consequences of an accident previously Risk Insight**:  evaluated in the cask Will removing    FSAR?
this              The possibility of a new or                          No requirement      different kind of accident from the CoC/TS being created compared result in        to those previously evaluated in the FSAR?
A Significant reduction in                            No the margin of safety for ISFSI or cask operation?
Evaluation Summary                            Delete from CoC - not required as these are regulatory requirements (10 CFR 72.210 through 72.214) that must be met.
Page 23 of 23}}

Latest revision as of 11:56, 6 April 2022

Attachment 15: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization Evaluation Form
ML21288A538
Person / Time
Site: 07201032
Issue date: 10/15/2021
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML21288A521 List:
References
5018091, CAC 001028, CoC No. 1032, EPID L2021-LLA-0053
Download: ML21288A538 (23)


Text

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-First Statement_______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement This certificate is conditioned upon fulfilling the requirements of 10 CFR Part 72, as applicable, the attached Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), and the conditions specified below:

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls A significant increase in No the probability or consequences of an accident previously Risk Insight**: evaluated in the cask Will removing FSAR?

this The possibility of a new or No requirement different kind of accident from the CoC/TS being created compared result in to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Page 1 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original Evaluation Summary Rewrite to specify correct contents of reorganized Appendices: This certificate is conditioned upon fulfilling the requirements of 10 CFR Part 72, as applicable, the attached Appendix A (Inspections, Tests and Evaluations), Appendix B (Technical Specifications), and the conditions specified below:

Page 2 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-Des.______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC

Description:

Model No.: HI-STORM FW MPC Storage System Description The HI-STORM FW MPC Storage System consists of the following components: (1) interchangeable multi-purpose canisters (MPCs), which contain the fuel; (2) a storage overpack (HI-STORM FW), which contains the MPC during storage; and (3) a transfer cask (HI-TRAC VW), which contains the MPC during loading, unloading and transfer operations. The MPC stores up to 44 pressurized water reactor fuel assemblies or up to 89 boiling water reactor fuel assemblies.

CoC Body Section I. Technology Yes Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls Risk Insight**: A significant increase in No Will removing the probability or this consequences of an requirement accident previously from the CoC/TS evaluated in the cask result in FSAR?

Page 3 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original The possibility of a new or Yes - since a different non-analyzed DSC different kind of accident configuration could conceivably be loaded being created compared to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Evaluation Summary Keep in CoC Section I as this is a description of the dry storage system.

Page 4 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-1______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 1: Operating Procedures: Written operating procedures shall be prepared for handling, loading, movement, surveillance, and maintenance.

The users site-specific written operating procedures shall be consistent with the technical basis described in Chapter 9 of the FSAR.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls A significant increase in No the probability or consequences of an accident previously Risk Insight**: evaluated in the cask Will removing FSAR?

this The possibility of a new or No requirement different kind of accident from the CoC/TS being created compared result in to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Page 5 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original Evaluation Summary Deleted from CoC - not required as compliance with 10 CFR 72.150, which requires that documented procedures be followed, is a regulatory requirement that must be met.

Page 6 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-2______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 2: Acceptance tests and maintenance program: Written acceptance tests and a maintenance program shall be prepared consistent with the technical basis described in Chapter 10 of the FSAR. At completion of welding the MPC shell to baseplate, an MPC confinement weld helium leak test shall be performed using a helium mass spectrometer.

The confinement boundary welds leakage rate test shall be performed in accordance with ANSI N14.5 to leaktight criterion. If a leakage rate exceeding the acceptance criteria is detected, then the area of leakage shall be determined and the area repaired per ASME Code Section III, Subsection NB, Article NB-4450 requirements. Re-testing shall be performed until the leakage rate acceptance criterion is met.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and Yes Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls Risk Insight**: A significant increase in First sentence - No Will removing the probability or Rest of Section - Yes. This test confirms the MPC has this consequences of an been manufactured correctly and will provide requirement accident previously confinement as designed.

from the CoC/TS evaluated in the cask result in FSAR?

Page 7 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original The possibility of a new or No different kind of accident being created compared to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Evaluation Summary First sentence will be deleted as this statement merely refers to the FSAR and so does not need to be repeated in the CoC. The rest of this section will be moved to Appendix A as it describes a test to provide reasonable assurance that an MPC has been manufactured and will operate in conformance with the certified design, and that the confinement safety function will be performed.

Page 8 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-3_______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 3: Quality Assurance: Activities in the areas of design, purchase, fabrication, assembly, inspection, testing, operation, maintenance, repair, modification of structures, systems and components, and decommissioning that are important-to-safety shall be conducted in accordance with a Commission-approved quality assurance program which satisfies the applicable requirements of 10 CFR Part 72, Subpart G, and which is established, maintained, and executed with regard to the storage system.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls A significant increase in No the probability or consequences of an Risk Insight**:

accident previously Will removing evaluated in the cask this FSAR?

requirement The possibility of a new or No from the CoC/TS different kind of accident result in being created compared to those previously evaluated in the FSAR?

Page 9 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original A Significant reduction in No the margin of safety for ISFSI or cask operation?

Evaluation Summary Delete from CoC - not required as compliance with the QA provisions in 10 CFR 72 Subpart G is a regulatory requirement that must be met.

Page 10 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-4______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 4: Heavy Loads Requirements: Each lift of an MPC, a HI-TRAC VW transfer cask, or any HI-STORM FW overpack must be made in accordance to the existing heavy loads requirements and procedures of the licensed facility at which the lift is made. A plant-specific review of the heavy load handling procedures (under 10 CFR 50.59 or 10 CFR 72.48, as applicable) is required to show operational compliance with existing plant specific heavy loads requirements.

Lifting operations outside of structures governed by 10 CFR Part 50 must be in accordance with Section 5.2 of Appendix A.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative Yes Controls A significant increase in Yes the probability or Adherence to heavy load lifting procedures is Risk Insight**: consequences of an necessary to preclude the possibility of a cask drop Will removing accident previously during loading operations inside the plants fuel this evaluated in the cask handling building (per 10 CFR 50) and during transfer requirement FSAR? operations (per 10 CFR 72). A significant increase in from the CoC/TS the probability of a cask drop would occur if these result in heavy load handing procedures are not followed.

The possibility of a new or No different kind of accident Page 11 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original being created compared to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Evaluation Summary Move to Appendix B - Administrative Controls. Note that this administrative control is applicable to heavy load lifting procedures at the ISFSI. Lifts within the Reactor Building are governed by existing 10 CFR Part 50 license requirements.

Page 12 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-5_______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 5: Approved Contents: Contents of the HI-STORM FW MPC Storage System must meet the fuel specifications given in Appendix B to this certificate.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 Criteria) A3 Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls A significant increase in No the probability or consequences of an accident previously Risk Insight**: evaluated in the cask Will removing FSAR?

this The possibility of a new or No requirement different kind of accident from the CoC/TS being created compared result in to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Evaluation Summary Delete from the CoC - This statement in the CoC merely points to information in the Appendices.

Page 13 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-6_______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 6: Design Features: Features or characteristics for the site or system must be in accordance with Appendix B to this certificate.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls A significant increase in No the probability or consequences of an accident previously Risk Insight**: evaluated in the cask Will removing FSAR?

this The possibility of a new or No requirement different kind of accident from the CoC/TS being created compared result in to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for All important design features will be discussed in the ISFSI or cask operation? CoC Page 14 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original Evaluation Summary Delete from CoC as this is an unnecessary cross-reference. All important design features will be included in the CoC or its Appendices.

Page 15 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-7______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 7: Changes to the CoC: The holder of this certificate who desires to make changes to the certificate, which includes Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), shall submit an application for amendment of the certificate.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls A significant increase in No the probability or consequences of an accident previously Risk Insight**: evaluated in the cask Will removing FSAR?

this The possibility of a new or No requirement different kind of accident from the CoC/TS being created compared result in to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Page 16 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original Evaluation Summary Delete from CoC - not required as 10CFR72.244 does not allow changes to the CoC of its appendices without an application for amendment to the certificate.

Page 17 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ___CoC-8_______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 8: Special Requirements for First System in Place: The air mass flow rate through the cask system will be determined by direct measurements of air velocity in the overpack cooling passages for the first HI-STORM FW MPC Cask System placed into service by any user with a heat load equal to or greater than 30 kW. The velocity will be measured using direct measurements of air velocity in the inlet vents. An analysis shall be performed of the cask system with the taken measurements to demonstrate that the measurements validate the analytic methods described in Chapter 4 of the FSAR.

The thermal validation test and analysis results shall be submitted in a letter report to the NRC pursuant to 10 CFR 72.4. To satisfy condition 8 for casks of the same system type, in lieu of additional submittals pursuant to 10 CFR 72.4, users may document in their 72.212 report a previously performed test and analysis submitted by letter report to the NRC that demonstrates validation of the analytic methods described in Chapter 4 of the FSAR.

This condition does not apply to the unventilated version of the system.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and Yes Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Appendix B.

Contents (Selection A2 No Technical Criteria) A3 No Specifications Section 3 Limiting L1 No Conditions for L2 No Operation (LCOs)* L3 No Page 18 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls A significant increase in No. The flow rate test will still be performed in the probability or accordance with Chapter 9 of the FSAR.

consequences of an accident previously evaluated in the cask FSAR?

Risk Insight**: The possibility of a new or No. The flow rate test will still be performed in Will removing different kind of accident accordance with Chapter 9 of the FSAR.

this being created compared requirement to those previously from the CoC/TS evaluated in the FSAR?

result in A Significant reduction in No. The test merely confirms the equipment has the margin of safety for been manufactured and will operate in conformance ISFSI or cask operation? with the certified design. The quality assurance program will still ensure that the SFSCs are manufactured and operate as designed. Furthermore, LCO 3.1.2 will still ensure the heat removal safety function of the SFSCs.

Evaluation Summary Delete from CoC - not required as the test merely confirms the equipment has been manufactured and will operate in conformance with the certified design.

The quality assurance program will still ensure that the SFSCs are manufactured and operate as designed.

Furthermore, LCO 3.1.2 will still ensure the heat removal safety function of the SFSCs.

Also, the second paragraph is not required as compliance with reporting specifications in 10 CFR 72.4 and 10 CFR 72.212 are regulatory requirements that must be met.

Page 19 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-9______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 9: Pre-operational Testing and Training Exercise: A dry run training exercise of the loading, closure, handling, unloading, and transfer of the HI-STORM FW MPC Storage System shall be conducted by the licensee prior to the first use of the system to load spent fuel assemblies. The training exercise shall not be conducted with spent fuel in the MPC. The dry run may be performed in an alternate step sequence from the actual procedures, but all steps must be performed CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative Yes Controls A significant increase in N/A the probability or Risk Insight**:

consequences of an Will removing accident previously this evaluated in the cask requirement FSAR?

from the CoC/TS The possibility of a new or N/A result in different kind of accident being created compared Page 20 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original to those previously evaluated in the FSAR?

A Significant reduction in N/A the margin of safety for ISFSI or cask operation?

Evaluation Summary Move to Appendix B as these testing and training exercises ensure that the equipment will operate and perform safety functions as designed.

The specifics of dry run training should be performed by the general licensee prior to initial use of the system to load spent fuel. In addition, the general license's training program is subject to NRC inspection.

Page 21 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original CoC Condition/TS Identifier: ____CoC-10______

  • All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),

Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.

    • In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?

Requirement CoC Condition 10: Authorization: The HI-STORM FW MPC Storage System, which is authorized by this certificate, is hereby approved for general use by holders of 10 CFR Part 50 licenses for nuclear reactors at reactor sites under the general license issued pursuant to 10 CFR 72.210, subject to the conditions specified by 10 CFR 72.212, this certificate, and the attached Appendices A and B. The HI-STORM FW MPC Storage System may be fabricated and used in accordance with any approved amendment to CoC No. 1032 listed in 10 CFR 72.214.

Each of the licensed HI-STORM FW MPC Storage System components (i.e., the MPC, overpack, and transfer cask), if fabricated in accordance with any of the approved CoC Amendments, may be used with one another provided an assessment is performed by the CoC holder that demonstrates design compatibility. The HI-STORM FW MPC Storage System may be installed on an ISFSI pad with the HI-STORM 100 Cask System (USNRC Docket 72-1014) provided an assessment is performed by the CoC holder that demonstrates design compatibility.

CoC Body Section I. Technology No Certified Design Section II. Design Features No Appendix A - Inspections, Tests, and No Evaluations Section 1 Definitions, Use No and Application Section 2 Approved A1 No Contents (Selection A2 No Criteria) A3 No Appendix B. Section 3 Limiting L1 No Technical Conditions for L2 No Specifications Operation (LCOs)* L3 No and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls Page 22 of 23

CoC Condition/Technical Specification Evaluation Form - CoC original A significant increase in No the probability or consequences of an accident previously Risk Insight**: evaluated in the cask Will removing FSAR?

this The possibility of a new or No requirement different kind of accident from the CoC/TS being created compared result in to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Evaluation Summary Delete from CoC - not required as these are regulatory requirements (10 CFR 72.210 through 72.214) that must be met.

Page 23 of 23