MONTHYEARML20140A1912020-05-19019 May 2020 Application for the Model No. Hi-Storm FW: Storage System, Amendment No. 6 - Supplemental Information Needed Project stage: Other ML20182A8622020-06-30030 June 2020 Responses to HI-STORM FW Amd. 6 Requests for Supplemental Information Project stage: Supplement ML20182A8632020-06-30030 June 2020 Attachment 1: HI-STORM FW Amendment 6 Rsi Responses Project stage: Other ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes Project stage: Other ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes Project stage: Other ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes Project stage: Other ML20182A8702020-06-30030 June 2020 Attachment 8 - Affidavit Project stage: Other ML20205L5972020-08-10010 August 2020 Transmittal Letter: Application for the Model Hi-Storm FW Storage System, Amendment No. 6 - Accepted for Review Project stage: Other ML20267A1662020-09-24024 September 2020 Transmittal Letter and Rais: Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Staggered First Request for Additional Information, Thermal Evaluation Project stage: RAI ML20315A0172020-10-31031 October 2020 Fuelsolutions Spent Fuel Management System Certificate of Compliance Renewal Application Project stage: Other ML20280A7412020-11-0606 November 2020 Transmittal Letter: Application for the Model No. Historm FW, Amendment 6 - Structural and Materials Evaluation, Final Staggered Request for Additional Information Project stage: RAI ML20280A7432020-11-0606 November 2020 Enclosure (Rais) to Transmittal Letter: Application for the Model No. Historm FW, Amendment 6 - Structural and Materials Evaluations, Final Staggered Request for Additional Information Project stage: RAI ML20356A3322020-12-21021 December 2020 Attachment 4 - Acceptance Tests and Maintenance Project stage: Other ML20356A3362020-12-21021 December 2020 Affidavit for Kimberly Manzione Project stage: Other ML20356A3302020-12-21021 December 2020 Attachment 2 - SFSC Heat Removal System Project stage: Other ML20356A3292020-12-21021 December 2020 Attachment 1 - Responses to Request for Additional Information Certificate of Compliance No. 1032 Docket No. 72-1032 HI-STORM FW Storage System Amendment No. 6 Project stage: Response to RAI ML20356A3282020-12-21021 December 2020 International Responses to HI-STORM FW Amd. 6 Requests for Additional Information Project stage: Other ML21146A0962021-07-0202 July 2021 Application for the Westinghouse Sentry Dry Storage Cask System, Certificate of Compliance No. 1026, Amendment No. 5 - Request for Additional Information Project stage: RAI ML21214A1322021-08-0202 August 2021 International, Supplemental Responses to HI-STORM FW Amendment 6 Requests for Additional Information Project stage: Supplement ML21333A1392021-11-29029 November 2021 Attachment 1 - HI-STORM FW Amendment 6 RAI Supplemental Responses Revised November 29, 2021 (Non-Proprietary) Project stage: Supplement ML21333A1382021-11-29029 November 2021 International Revised Supplemental Responses for HI-STORM FW Amd. 6 Requests for Additional Information Project stage: Supplement ML21333A1412021-11-29029 November 2021 Attachment 3 - HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (Non-Proprietary) Project stage: Other ML21333A1422021-11-29029 November 2021 Attachment 4 - HI-STORM FW Amendment 6 CoC, Appendix a - Revised November 29, 2021 (Non-Proprietary) Project stage: Other ML21333A1432021-11-29029 November 2021 Attachment 5 - Affidavit of Kimberly Manzione Project stage: Other ML22145A4072022-10-13013 October 2022 User Need Memorandum for Rulemaking for the Holtec HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 6 Project stage: Other ML22145A3132022-10-13013 October 2022, 9 December 2022 Rulemaking Package: Certificate of Compliance No. 1032, Amendment 6, Model No. HI-STORM FW Project stage: Request ML22290A1472022-11-0808 November 2022 Approval of Holtec International Request Withholding Information from Public Disclosure of the Application for Holtec HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 6 (Docket No. 72-1032) Project stage: Other ML22145A4082022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 1: Draft Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML22145A4092022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 2: Draft Appendix a, Technical Specifications, Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML22145A4102022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 3: Draft Appendix B, Technical Specifications, Approved Contents and Design Features, CoC No.1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML22145A4112022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 4: Preliminary Safety Evaluation Report, Certificate of Compliance. No, 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Approval ML23041A4692023-02-15015 February 2023 Enclosure 3 - Final Appendix B, Technical Specifications, Approved Contents and Design Features, CoC No.1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4702023-02-15015 February 2023 Enclosure 4 - Final Safety Evaluation Report, Certificate of Compliance. No, 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Approval ML23041A4682023-02-15015 February 2023 Enclosure 2 - Final Appendix a, Technical Specifications, Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4662023-02-15015 February 2023 Amendment No. 6 to Certificate of Compliance No. 1032 for the Holtec International Storage Module (Hi-Storm) Flood and Wind (FW) Multipurpose Canister (MPC) Storage System (Docket No. 72-1032, CAC No. 001028, EPID: L-2019-LLA-0231) Project stage: Other 2020-09-24
[Table View] |
|
---|
Category:Response to Request for Additional Information (RAI)
MONTHYEARML24100A0302024-04-0808 April 2024 Attachment 2: Holtec Responses to NRCs Clarification Questions Documented in Conversation Record (1) on HI-STORM FW Amendment 7 Clarification Call Dated February 28, 2024 ML23321A2472023-11-17017 November 2023 Attachment 1: Holtec International - Summary of Additional Clarifications/Changes Submitted for Review ML23289A2132023-10-16016 October 2023 International - Schedule for Responses to HI-STORM FW Amendment 9 Requests for Additional Information ML23227A2502023-08-15015 August 2023 Attachment 1: Summary of Clarification Call Action Items (non-proprietary) ML23181A1942023-06-30030 June 2023 Attachment 1 - Summary of Clarification Call Action Items (Non-Proprietary) ML23181A1962023-06-30030 June 2023 Attachment 3 - Holtec Clarifications of Responses to Request for Additional Information (Part 5) (Non-Proprietary) ML23128A3052023-05-0808 May 2023 Attachment 2: HI-STORM FW Amendment 7 RAI Responses Part 5 (non-proprietary) ML23072A4282023-03-13013 March 2023 Attachment 1: Holtec International, HI-STORM 100 Amendment 9 Obs Responses to Observations ML23006A2662023-01-0606 January 2023 Attachment 2: HI-STORM FW Amendment 7 RAI Responses Part 4 (Non-Proprietary) ML22336A1342022-12-0101 December 2022 Attachment 1 - Holtec Clarification of Response to Request for Additional Information 5-2 ML22210A1472022-09-29029 September 2022 Attachment 1: HI-STORM FW Amendment 7 RAI Responses Part 2 (non-proprietary) ML22258A2522022-09-15015 September 2022 International, Summary of Clarification Call Action Items of Responses to Request for Additional Information (Part 1), Amendment No. 7 ML22258A2552022-09-15015 September 2022 International, Updated HI-STORM FW Amendment 7 RAI Responses ML22192A2182022-07-11011 July 2022 Attachment 2: HI-STORM FW Amendment 7 RAI Responses Part I (non-proprietary) ML22192A2192022-07-11011 July 2022 Attachment 3: HI-STORM FW Amendment 7 Certificate of Compliance Appendix a, Changed Pages (non-proprietary) ML22192A2202022-07-11011 July 2022 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance Appendix B, Changed Pages (non-proprietary) ML21333A1392021-11-29029 November 2021 Attachment 1 - HI-STORM FW Amendment 6 RAI Supplemental Responses Revised November 29, 2021 (Non-Proprietary) ML21333A1412021-11-29029 November 2021 Attachment 3 - HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (Non-Proprietary) ML21333A1422021-11-29029 November 2021 Attachment 4 - HI-STORM FW Amendment 6 CoC, Appendix a - Revised November 29, 2021 (Non-Proprietary) ML21288A5362021-10-15015 October 2021 Attachment 13: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B Reorganization ML21288A5402021-10-15015 October 2021 Attachment 17: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B Reorganization Evaluation Form ML21288A5392021-10-15015 October 2021 Attachment 16: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix a Reorganization Evaluation Form ML21288A5382021-10-15015 October 2021 Attachment 15: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization Evaluation Form ML21288A5372021-10-15015 October 2021 Attachment 14: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization Matrix ML21288A5282021-10-15015 October 2021 Attachment 6: HI-STORM FW FSAR Proposed Revision 10A, Changed Pages ML21288A5262021-10-15015 October 2021 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance Appendix B, Changed Pages ML21288A5252021-10-15015 October 2021 Attachment 3: Updated Summary of Proposed Changes ML21288A5242021-10-15015 October 2021 Attachment 2: HI-STORM FW Amendment 7 Rsi Responses ML21214A1342021-08-0202 August 2021 Attachment 2: HI-STORM FW FSAR Proposed Revision 7.C Supplemented ML21214A1332021-08-0202 August 2021 Attachment 1: HI-STORM FW Amendment 6 RAI Responses Supplemented ML21092A1652021-04-0202 April 2021 Attachment 3: Responses to NRC Staff'S Open Items ML20356A3292020-12-21021 December 2020 Attachment 1 - Responses to Request for Additional Information Certificate of Compliance No. 1032 Docket No. 72-1032 HI-STORM FW Storage System Amendment No. 6 ML20356A3302020-12-21021 December 2020 Attachment 2 - SFSC Heat Removal System ML20182A8632020-06-30030 June 2020 Attachment 1: HI-STORM FW Amendment 6 Rsi Responses 2024-04-08
[Table view] |
Text
ATTACHMENT 1 TO HOLTEC LETTER 5018078 Responses to Request for Supplemental Information Certificate of Compliance No. 1032 Docket No. 72-1032 HI-STORM FW Storage System Amendment No. 6 Shielding Evaluation RSI-Sh-1 Provide the following:
- a. the analyses for the transfer cask and overpack that demonstrates that the cask meets the criteria in Title 10 of the Code of Federal Regulations (10 CFR) Sections 72.236(b) through (f) in the event of a cask drop due to failure of the handling equipment. This information should ensure that this equipment maintains its safety function during credible accidents when the single failure proof criterion is not satisfied.
- b. a revised application including a demonstration that the regulations in 10 CFR 72.236 are met considering the drop analysis when the handling equipment does not meet the single failure proof criterion.
- i. a demonstration that the spent fuel storage cask is still subcritical considering any reconfiguration resulting from the drop analysis; ii. a demonstration that radiation and confinement features are sufficient to meet the accident dose limits in 10 CFR 72.106; and iii. a demonstration that the storage cask is still capable of providing adequate heat removal capacity.
The applicant proposes to modify technical specification 5.2(c) in Appendix A to the certificate of compliance (CoC) to allow the use of handling equipment that does not meet the single failure proof criterion during loading operations of the HISTORM FW Storage System, as long as a site-specific drop analysis is performed as part of the 10 CFR 72.212 report. Section 3.5.1.2, Structural Design Criteria and Design Features, of NUREG-1536, Standard Review Plan for Spent Fuel Dry Storage Systems at a General License Facility, Revision 1, states the following about the design of a cask system and handling operations:
The casks radiation shield must not degrade under normal or off-normal conditions or events.Any permissible degradation in shielding must be shown to result in dose rates sufficiently low to permit recovery of the damaged cask including unloading, if necessary Moreover, the regulations in 10 CFR 72.236 require the certificate holder and applicant for a CoC to demonstrate compliance. Therefore, the staff does not find that requiring the general licensee to perform the site-specific drop analysis meets the regulations in 10 CFR 72.236(b) through (f), as these requirements need to be met by the CoC holder (i.e., the applicant).
This information is needed to determine compliance with the regulatory requirements in 10 CFR 72.236 (b) through (f).
1
ATTACHMENT 1 TO HOLTEC LETTER 5018078 Holtec Response:
As discussed in Holtecs response to RSI-St-1, design evaluations of a free vertical fall from a carry height of 11 in. onto a representative target, have been performed for both the transfer cask and the storage overpack. These evaluations, provided in Attachment 7 to Holtec Letter 5018078, demonstrate that neither the transfer cask nor the overpack experience plastic deformation in excess of their material failure strain, and thus their shielding capacities will not be compromised by the drop event. Likewise, the design evaluations demonstrate that both the MPC enclosure vessel and fuel basket do not sustain significant deformation such that the confinement or criticality control design functions of the MPC are affected. Because the evaluations demonstrate there is no degradation to the functions of the components, there is no change to the subcritical performance, dose rates, or heat rejection capability of the cask.
2
ATTACHMENT 1 TO HOLTEC LETTER 5018078 Structural Evaluation RSI-St-1 Provide a design evaluation to demonstrate that the HI-STORM FW storage system meets the criteria in 10 CFR 72.236(l) for a design basis cask drop evaluation due to failure of lifting equipment that does not meet the criteria listed in technical specification 5.2(c)(1) through (3) in Appendix A to the CoC.
The applicant proposed to modify technical specification 5.2(c) in Appendix A of the CoC by adding technical specification 5.2(c)(4). to allow the use of existing lifting equipment that does not meet criteria (1) through (3) of technical specification 5.2(c). Technical specification 5.2(c)(3) includes the single failure proof criteria. Proposed technical specification 5.2(c)(4) specifies that the general licensee must perform a site-specific drop analysis as part of the 10 CFR 72.212 report. The staff notes that 10 CFR 72.236 requires the certificate holder to provide a design basis evaluation for structures, systems, and components (SSCs) important to safety to demonstrate structural adequacy under the design basis accident conditions, including a cask drop scenario.
The staff notes that Section 2.5.2.2, External Conditions, of NUREG-1536 states that the staff has generally considered that the cask drop should be evaluated as one of the accident conditions in the safety analysis report (SAR), which is part of the application. The staff notes that Section 3.5.1.4, Structural Analysis, of NUREG-1536 states that a cask drop is a high priority item for the staffs structural review and that the applicant should analyze the accident condition or demonstrate that the scenario is not credible. The staff expects that the applicant provide an evaluation in the final SAR (FSAR) for a drop due to failure of lifting equipment that does not meet the criteria listed in technical specification 5.2(c)(1), (2),
and (3) of Appendix A to the CoC.
This information is needed to determine compliance with the regulatory requirements in 10 CFR 72.236(l).
Holtec Response:
It is correctly noted that if the lifting device fails to meet the single failure proof criteria as per requirements of ANSI N14.6, a postulated free drop (free fall) shall be evaluated.
In order to address this, a design evaluation is performed for the postulated drops (free fall) of the HI-STORM FW Version E and the HI-TRAC VW. The drop analyses documented in the FSAR consider a free vertical fall of 11 in. onto a representative target. The target stiffness properties evidently bound the majority of the ISFSI sites.
If the site parameters differ in so much to amplify (increase) the cask response in terms of stresses, strains and g-loads, site specific analysis will be conducted using the finite element models and methodology elaboratively discussed in the FSAR. For example, the cask carry height more than 11 in. will warrant a site-specific analysis. Likewise, site specific analysis will be conducted if the target at the site is stiffer than that discussed in this FSAR.
3
ATTACHMENT 1 TO HOLTEC LETTER 5018078 RSI-St-2 Provide a design evaluation to demonstrate that the anchored variant of the HI-STORM FW Storage System, including the anchorage and attachment points, meets the requirements of 10 CFR 72.236(l) in the case of a tornado missile impact and tornado wind event.
The applicant notes in proposed Revision 7 of the FSAR for the HI-STORM FW Storage System that a site-specific tornado missile analysis shall be performed to demonstrate that the HI-STORM FW Storage System, Version E, casks anchors and its attachment points comply with the Level D stress limits in the American Society of Mechanical Engineers (ASME)Section III, Subsection NF. Regulation 10 CFR 72.236 requires the certificate holder and applicant for a CoC to provide a design evaluation for SSCs important to safety to demonstrate that the SSCs are structurally adequate.
NUREG-1536, Sections 2.4.2.2, External Conditions, and 2.5.2, Design Bases for SSCs Important to Safety, mentions that the safety analysis report should evaluate natural phenomena events, including tornadoes, as part of design-basis accidents. Specifically, NUREG-1536, Revision 1, Section 2.5.2, states the following:
The NRC staff accepts design-basis tornado wind loading as defined by RG 1.76, Design Basis Tornado and Tornado Missiles for Nuclear Power Plants (Region 1) and RG 1.117, Tornado Design Classification.
Design criteria should be established for the cask on the basis of these wind-loading and missile-impact definitions. The cask should not tip over, and the capability to perform the confinement safety function should not be impaired. The NRC staff considers that tornados and tornado missiles may occur without warning.
The staff also notes that Section 3.5.1.4 of NUREG-1536 states that both tornado missiles and tornado winds are low priority review items for the staffs structural review and that the applicant must address these accident conditions in the SAR (application). Similar to the structural evaluation performed for the seismic event, the staff expects that an evaluation be presented in the FSAR for a design basis tornado missile impact and tornado wind event.
This information is needed to determine compliance with the regulatory requirements in 10 CFR 72.236(l).
Holtec Response:
A design analysis is performed for tornado missile impacts and is discussed in the FSAR.
The Design Basis Missiles (DBM) for the HI-STORM FW overpack, including HI-STORM FW Version E, are listed in Table 2.2.5. Since the intermediate and small (penetrant) missile dont challenge the physical stability of the anchored overpacks (HI-STORM FW Version E), their analysis and conclusion are identical to those of the free-standing casks. The large missile impact on the HI-STORM FW Version E is evaluated and documented in the FSAR.
4