ML21333A142

From kanterella
Jump to navigation Jump to search

Attachment 4 - HI-STORM FW Amendment 6 CoC, Appendix a - Revised November 29, 2021 (Non-Proprietary)
ML21333A142
Person / Time
Site: 07201032
Issue date: 11/29/2021
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML21333A137 List:
References
5018092, CoC No. 1032, EPID L-2019-LLA-0231
Download: ML21333A142 (1)


Text

ATTACHMENT 4 TO HOLTEC LETTER 5018092 SFSC Heat Removal System 3.1.2 3.1 SFSC INTEGRITY 3.1.2 SFSC Heat Removal System LCO 3.1.2 The SFSC Heat Removal System shall be operable


NOTE--------------------------------------------------

The SFSC Heat Removal System is operable when 50% or more of each of the inlet and outlet vent areas are unblocked and available for flow or when air temperature requirements are met.

APPLICABILITY: During STORAGE OPERATIONS.

ACTIONS


NOTE--------------------------------------------------

Separate Condition entry is allowed for each SFSC.

COMPLETION CONDITION REQUIRED ACTION TIME A. SFSC Heat Removal A.1 Remove blockage. N/A System operable, but partially (50%) blocked.

B. SFSC Heat Removal B.1 Restore SFSC Heat 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> System inoperable. Removal System to operable status.

(continued)

Certificate of Compliance No. 1032 Amendment No. 6 Appendix A 3.1.2-1 PAGE 1 OF 1