|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld ML20195G4591999-06-10010 June 1999 Forwards MORs for May 1999 & Revised Repts for Apr 1999 for LGS Units 1 & 2 ML20195H0531999-06-0909 June 1999 Forwards Revised Bases Pages B3/4 10-2 & B3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7701999-06-0707 June 1999 Provides Notification of Change to NPDES Permit PA0052221, for Bradshaw Reservoir Facility Which Supports Operation of Lgs,Units 1 & 2,per EPP Section 3.2 ML20195C7631999-06-0101 June 1999 Notifies NRC That PECO Energy Has Completed Installation of New Large Capacity,Passive Strainers on RHR & Core Spray Sys Pump Suction Lines at Lgs,Unit 2,in Response to Ieb 96-003 ML20195D5381999-05-26026 May 1999 Forwards 1998 Occupational Exposure Tabulation Rept for LGS Units 1 & 2. Encl Is Diskette & Instructions.Rept Is Being re-submitted to Reset 12 Month Time Period.Without Disk ML20195B2821999-05-24024 May 1999 Requests That NRC Distribution Lists for LGS Be Updated. Marked-up Distribution List Showing Changes Is Attached ML20196L2891999-05-20020 May 1999 Provides Status Update of Thermo-Lag 330-1 Fire Barrier Corrective Actions,Iaw Commitments Made in ML20195B2951999-05-20020 May 1999 Forwards Rev 0 to LGS Unit 2 Reload 5,Cycle 6 COLR, IAW TS Section 6.9.1.12.Values Listed Have Been Determined Using NRC-approved Methodology & Are Established Such That All Applicable Limits of Plants Safety Analysis Are Met 05000352/LER-1999-003, Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv1999-05-19019 May 1999 Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv 05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 9904191999-05-18018 May 1999 Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 ML20206E2001999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept (Non- Radiological) for Limerick Generating Station,Units 1 & 2. Rept Submitted IAW Section 5.4.1 of App B of Fols,Epp (Non- Radiological) & Describes Implementation of EPP for 1998 ML20206D8801999-04-27027 April 1999 Forwards Rev 2 to LGS Unit 1 Reload 7,Cycle 8 COLR, IAW TS Section 6.9.1.12.COLR Provides cycle-specific Parameter Limits for Noted Info ML20206A5461999-04-21021 April 1999 Responds to Conference Call Between Util & NRC on 990420,re TS Change Request 98-07-2,revising TS Section 2.0 to Incorporate Revised MCPR Safety Limits.Attached Ltr Contains Info Requested ML20205T0441999-04-17017 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept 15, IAW TS Section 6.9.1.7.REMP for 1998,confirmed That LGS Environ Effects from Radioactive Release Were Well Below LGS TSs & Other Applicable Regulatory Limits ML20205Q7581999-04-15015 April 1999 Forwards Response to RAI Re ISI Program First & Second 10-Yr Interval Relief Requests.Revs to Identified by Vertical Bar in Right Margin 1999-09-09
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML20058L8901990-07-30030 July 1990 Advises That FEMA Grants Exemption from 10CFR50 App E for Biennial full-participation Onsite/Offsite Exercise ML20011E5571990-02-0808 February 1990 Forwards Us Bankruptcy Court for Eastern District of Tennessee Orders & Memorandum on Debtors Motion to Alter or Amend Order & Opinion Re Status of Sales Agreement Between DOE & Alchemie.Doe Believes Agreement Expired on 890821 ML20005D7501989-12-0404 December 1989 Forwards Rept for State of Mn off-hours & Unannounced Drill Conducted on 891019 for Plants.One Area Requiring Corrective Action Re Staffing Activation Inadequacy Corrected at Monticello 890726 Exercise.Preparedness Deemed Adequate ML20248E1141989-07-31031 July 1989 Forwards Radiological Emergency Preparedness Exercise Evaluation Rept,Limerick Generating Station, for Exercise on 890614.Deficiency Noted Re Inadequate Response Capability by Lower Pottsgrove Township ML20247J7721989-07-19019 July 1989 Forwards Rept for Unannounced off-hours Drills on 881020 for State of WI,site-specific to Zion,Point Beach,Kewaunee & Prairie Island Nuclear Power Stations.No Deficiencies or Areas Requiring Corrective Actions Noted ML18101A4911989-06-26026 June 1989 Forwards Final Exercise Rept of 881129 Exercise of Offsite Radiological Emergency Preparedness Plans site-specific to Artificial Island Generating Station.No Deficiencies Noted ML20247K4031989-05-19019 May 1989 Forwards Final Exercise Rept for 890405 Exercise of Offsite Radiological Emergency Preparedness Plans site-specific to Facility.One Deficiency Noted Re Lower Pottsgrove Township Emergency Operations Ctr ML20247N1291989-05-19019 May 1989 Forwards Final Exercise Rept for 880405 Exercise of Offsite Radiological Emergency Preparedness Plans site-specific to Plant.Offsite Preparedness at Plant Not Adequate to Provide Reasonable Assurance That Public Health & Safety W/O Risk ML20235N3421989-02-15015 February 1989 Responds to 890201 Request for Estimates for Centrifuge Plant Demonstration Facility (Cpdf) & Oliver Springs Plus Cpdf.Doe Intends to Ensure That Sufficient Finances Exist for Decontamination & Decommissioning Liabilities ML20151A1321988-06-29029 June 1988 Forwards Artificial Island Nuclear Generating Stations Site Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification. Sys Satisfies NUREG-0654/ FEMA-REP,Rev 1 & FEMA-REP-10 Requirements ML18093A8641988-05-27027 May 1988 Forwards FEMA & Region III Final Exercise Rept of 870909 Exercise of State of DE Offsite Radiological Emergency Preparedness Plans site-specific to Artificial Island Generating Station ML20237C0831987-12-0707 December 1987 Forwards Kewaunee Nuclear Plant & Point Beach Nuclear Plant Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification. Alert & Notification Sys Satisfies NUREG-0654/FEMA-REP-1,Rev 1 ML20236L2461987-07-30030 July 1987 Discusses Participation of Certain Ingestion Exposure Pathway EPZ-only States in Qualifying Exercises Used by NRC in Making Licensing Decisions for Operating Exercises.Listed Plants Noncompliant as of 870331 ML20245B6361987-06-17017 June 1987 Forwards Post-Exercise Assessment of 861112 Exercise of Radiological Emergency Response Plans of State of Nj,Salem County.... FEMA Requested Schedule of Corrective Actions from State by 870626.Offsite Preparedness Adequate for EPZ ML20212P3671987-03-0303 March 1987 Forwards Limerick Generating Station Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification. Alert Sys Satisfies Requirements of Rev 1 to NUREG-0654/FEMA-REP-1 & FEMA-43 ML20214M6591986-09-0202 September 1986 Responds to NRC 860729 Request Re Establishment of Addl Traffic Controls on Pennsylvania Turnpike at Route 100. Chester County Radiological Response Plan Includes Placement of Three State Police Officers on Turnpike ML20204F2011986-07-29029 July 1986 Forwards Exercise Evaluation Rept for Limerick Generating Station for 860403 Exercise of Offsite Radiological Emergency Preparedness Plans.No Deficiencies Noted.Areas Requiring Corrective Actions Listed ML20199B2561986-06-0505 June 1986 Notifies NRC That State of DE & Local Radiological Emergency Plans Adequate,Conditioned on FEMA Verification of Alert & Notification Sys ML20214E2311986-02-28028 February 1986 Forwards Medical Svcs Info for State of Ny & Oswego County Radiological Emergency Preparedness Plan.Info Confirms List of Medical Facilities Identified for Use in Event of Emergency ML20151V0191986-02-0404 February 1986 Forwards 851029 Full Participation Exercise Rept of Offsite Radiological Emergency Preparedness Plans & Results of 851115 Remedial Exercise.Deficiency Identified Re Failure to Complete Public Alert within Time Period ML20140A8921986-01-14014 January 1986 Forwards Interim Findings on Adequacy of Radiological Emergency Response Preparation of State & Local Govts..., Based on State of Nj Emergency Response Plan & Exercises Conducted at Salem from 810408-841023.Plans Adequate ML18092A7771985-09-16016 September 1985 Informs That Remaining Category B Deficiency Identified During Salem 831026 Exercise Corrected.Util Agreed to Underwrite Cost of Installing Decontamination Showers & Sleeping Quarters at State of DE Emergency Operations Ctr ML20135C1771985-09-0606 September 1985 Notifies of Util Application for Permit Re Use of Cooling Water from Beechwood Pit Filed W/Delaware River Basin Commission.Questions Raised Re Effects of Water on Quality of Schuylkill River & Need for Addl EIS-related Work ML20133G6411985-08-0606 August 1985 Supports Pennsylvania Emergency Mgt Agency Request to Exempt Chester County from Full Participation in Joint Exercises Involving Peach Bottom,Providing County Participates in Limerick Exercise ML20127J8811985-06-14014 June 1985 Advises That State & Local Plans for Radiological Emergencies Adequate,Subj to Criteria of App 3 of NUREG- 0654/FEMA-REP-1,Rev 1 & FEMA-43, Std Guide for Evaluation of Alert & Notification Sys for Nuclear Power Plants ML20126J3191985-06-0606 June 1985 Forwards List of Local or Regional Medical Facilities Having Capabilities to Provide Treatment for Radiation Exposure in Vicinity of Plant,Per 850528 Request ML20129C0201985-05-30030 May 1985 Updates 850521 Memo Re Plant Offsite Planning & Preparedness.Verification That Traffic Control & Access Control Points Will Be Established in King of Prussia Area to Keep Evacuating Traffic in Motion Received ML20128C7241985-05-21021 May 1985 Forwards 850418 & 25 Draft FEMA Region III Exercise Evaluation Rept, of 850410 & 22 Remedial Exercises, Respectively ML20133A5121985-04-30030 April 1985 Forwards PA Bradley FOIA Request for Documents Re Vogtle & Ei Hatch Antitrust Reviews ML20100J6951985-04-0909 April 1985 Forwards Pp Giordano 850329 Memo Forwarding Supplemental Findings on Offsite Radiological Emergency Preparedness for Facility.Deficiencies Listed.Plan Deemed Inadequate ML20127D6561985-03-27027 March 1985 Discusses 850307 Remedial Exercise at Graterford State Correctional Institution in Support of Facility.Portion of Category a Deficiencies Cited on 840725 Corrected ML20106E2981985-02-0101 February 1985 Forwards Exhibit Status Rept Re FEMA Exhibits Addressed at Hearing in Facility Proceeding ML20104A7061985-01-23023 January 1985 Responds to 841226 Memo Re FEMA Support for NRC Licensing of Facilities.Clarification from PA Emergency Mgt Agency Re Nature & Scheduling of Review of Revised Plans Requested. Index to Revised Plans Requested by 850201 ML20112H1971985-01-10010 January 1985 Forwards Exercise Evaluation Rept for 841120 Supplemental Exercise of Offsite Radiological Emergency Preparedness Plans.Supplemental Exercise Conducted to Correct Deficiency Identified in Initial Full Participation Exercise on 840725 ML20108F3801984-12-13013 December 1984 Forwards Final Findings 44CFR350,NY State & Oswego County Plans & Preparedness,Nine Mile Point/Ja Fitzpatrick Nuclear Power Generating Stations, for Review.Comments Requested by 850108 ML20108E1221984-12-11011 December 1984 Forwards 841126 Notice of Appearance Re Offsite Emergency Planning Hearing,In Response to Request ML20094A9021984-11-0202 November 1984 Forwards FEMA Prefiled Testimony on Offsite Planning Issues. W/O Encl.Related Correspondence ML20098E3921984-09-25025 September 1984 Forwards Evaluation of 840725 Exercise of Offsite Radiological Emergency Preparedness Plans for Limerick.Plans Inadequate.Schedule of Corrective Actions Under Review ML20096E6741984-09-0505 September 1984 Discusses FEMA Position on ASLB Request for Release of FEMA Regional Draft Rept Re Jul 1984 Exercise to ASLB & Parties Prior to Review at Headquarters.Fema Has Never Released Unreviewed Repts of Subj Type ML20138C1821984-08-23023 August 1984 Forwards Project & Budget Proposals for NRC Work for Rev 1 to, Evaluation of Selected NRC Open Items Before Plant Fuel Load & Evaluation of Selected Open NRC Activities at Near-Term OL Sites Needing Action.. ML20095A2061984-08-13013 August 1984 Informs That FEMA Does Not Intend to Conduct full-scale Evaluation of Hope Creek 1985 Exercise.Since Salem Unit 1 OL Issued Prior to 820713,full Participation in 1985 Not Required by NRC or FEMA Rules ML20091P6631984-06-0606 June 1984 Comments on Fes Re Surface Water Hydrology & Water Quality. Comments Support Recommendation for Evaluation of Impacts During Schuylkill River Extreme Low Flow Conditions ML20091G3451984-05-25025 May 1984 Forwards FEMA Regional Assistance Committee 840427 Informal Evaluation of Offsite Radiological Emergency Response Plan. Rept Is Addendum to 840508 Interim Findings ML20084J8231984-05-0808 May 1984 Forwards Interim Finding on Offsite Radiological Emergency Response Plans for Limerick Generating Station,Apr 1984 ML20083P6051984-04-17017 April 1984 Informs of Error in Fourth Line of Second Paragraph of First Technical Comment, Statistics & Probability. Sense of Paragraph Stated as Either/Or Situation Recommended ML20080S7861984-02-27027 February 1984 Forwards Original Typescript of Revised Comments Dtd Feb 1984 to Be Appended Into Fes.Corrected Version Supersedes Jan 1984 Version ML17346A5701984-02-15015 February 1984 Approves State & Local Plans & Preparedness for Alerting & Protecting Public in Event of Radiological Emergency. Approval Conditional on Verification of Alert & Notification Sys,Per Criteria of App 3 of NUREG-0654/FEMA-REP-1,Rev 1 ML20087E1011984-02-10010 February 1984 Notifies That Natl Ctr for Devices & Radiological Health Has No Comment Re Postulated Plant Accidents Described in Des (NUREG-0974) ML20080P2851984-02-0808 February 1984 Comments on Suppl 1 to Des for Facilities.Consequences of Severe Accidents on Schuykill River Not Clarified & Adverse Effects on Fish & Wildlife Not Considered ML20080B9751984-02-0303 February 1984 Forwards Technical Comments Based on Review of Suppl 1 to Des.Nrc Should Consider Risks Associated W/Range of Events Expected to Occur Offsite.Documents Rated as ER-2 1990-07-30
[Table view] |
Text
- - -- --
,y -
A l,,y i,, -
.u
? - us .
& s//.6%S 9f
- d States Department of the Interior United
!!R"!2=== ,
jQ( $2* '.
FISH AND WILDLIFE SERV,lCE euntAu or srORT FISHERIES AND WILDLIFL h*
W. '
WAs!!!NGTON, D c. :tuno eM[h
JUL 8 STI ff g 46
. Mr. Harold L. Price f
., ' Director of Regulation bLlh L L I$
- U.S. Ato:cic Enercy Commission 2 grf jg*/} > d-i ,
y) .
l i.'
Washi.rgton, D.C. 20545
- Y,,,, v H-Dear Mr. Price T['b"
.P 4TT e This is in reply to Mr. Ped's letters cf M.r:h 1h cr.d 0:td,;a 5,, ' ~
'3 1970, requestinc our comments en volunes 1 through 5 of the '
Preliminary Safety Analysis Report and amendments I;os.1 through 6, EM*Lj . nled by the Phila*;niphia Electric Company for the Limerick Cen; rat-l ins Etation, Unitt 2. and 2, Montgomery County, Pennsylvania, /J:C i
Docket Nos. 50-352 and 50-353 p' The project is located on the emot bank of the Schuylkin River about 3
1.7 riles sucthwesi, of the boroucn of Pottstown and about PC,7 miles northwest of Philadelphia. The site includes about 587 acres of land adjoining about one mile of the river.
Two identical boiling water reactors designed for a combined output of 6,586 Wt (2,200 We) win be used. Heat rejected to the circu-lating coolinc water system will be dis:ipated to the atrost.here by y means of four hyperbolic, natural-draft cooling towers. Water re-quirements for the two units will be about 107 c.f.s., of which 34 4 c;f.s. win be used for makeup, 20 c,f.s. vin be used for blow-
, g' - dern, and 33 c.f.s. will be used for other purposes including vatar
,y quality maintenance, miseennneous cooling, drinking and santtary use, and wash water. Facilities will be pro /ided for treating the drinking
- and tanitary water. Temperature differentia 1L within the plant and imposed on the environ.ent are not specified in the safety analysis report. An State water quality standards for plant discharges are to be met.
i- ~
Due to the periodic critically short supply of water in the Schuylkin River and the prior downstream claims on the water, Delaware River water win be used to fulfin the $4 c.f.s. consumptive demand of the project. Delaware River water wi n be diverted and transported by conduit to the East tranch of Perkiomen Creek, then diverted from the creek by conduit to the plant site.. Water velocitie,s through the Schuylkill River water intake win be 0 75 to 1.0 foot per second.
N5n
\
8709240372 870921 ND PDR FOIA l MENZO7-111 PDR j -
l N.T [ , i l
]N$]:sI
- 146 -
i^
h]
3' n: 4 h,QI L
,'JE Ml The radiological waste collection r,yster includes filters, decinera- i liters, and evaporators. The applicant sistcc that the rMielodcal l
wasu diccharcc: will be ategt 1 percesit of the permissible liuAts prescribed by the Atonic Ener.'ty Co:nission's Code of Federal Repla.
- tions, Title 10, Port 20. The applicant plans to conduct both pre-
- and postdevelop
- ent envirore, ental radiological surveys. Details of-the surveys are not presently availabic.
The Schuylkill River in the project area supports moderate populations of largemouth bass, smallmouth base, walleye, crapp:c, sunrisher,, bull-hand, catfish, carp, and suckers. The amount of tisMn:; is moderate, y but is expected to increase. Water quality is generclly g. sod, but is
-; wbject to Walcalc i,os of acMiu du.ii.:.s;e frc up;tycc. c.ir.ca.
4
.: Imprwcment in water qua31ty hon been observed wer the isst decade.
I This trend is expected to continue. The applicant has planned recrea-l M;: tional developments, including acce'ss to the river, 4: a part of q { the project.
p' l Amendment No.1 proposes that a 20-mile reach of East Branch of I 4. Perkiomen Creek be used as part of the water transport system from the Delaware River. This segment of the croer, contains good popula-tions of warmwater fishes such as it.rSemouth bass, crappie, and other
- sunfishes. Two channel impoundments within this reach prwide addi.
.i -
r tional fish habitat. The stream has Bood public access and receives i ! anlerate to heavy fishing pressure. Wstor qv.ality in-the strear: is
_l j. good.
The project tite is located in an area which aupports moderate popu-j lations of phessant, cottonteil, grey squirrel and guail. Migratir.g vaterfowl use the river in spring and fall. Hunting is light in the
'N area because public access is restricted. However, Eastern Pennsylvania is considered to be, some of the better pnensant habitat in the east,ern United States. Most of the hunting is for pheasmt, cottontail, guail,
, and squirrel.
4 The applicant indicates that release of radioactive wastes will be i j only about 1 percent of prescribed enh permissible concentrations. '
- While maintenance of these low levels wculd safeguard aan from undue t
radiation exposure, the radiosensitivity of fish and wildlife organ- ,
isme is poorly understood so that it is uncertain that they would be 1 i
safe rates for fish and wildlife. R:4icicotopes of many elements ue concentrated and stored by organisms that require these or chemi-cally similar elements for their normal raetabolic activities. Food chain transfer of these radionuclides may result in concentrations hazardous to fish and wildlife.
i i 2 {
l P'f
i'
.H - 147 -
w- % :
{
qq l~ To date, there has been little study.of t% effet of Encous and sy i enlid radioactive ustes on vi3dlife. T.wrefore, t!.e applicarit i
- )._ should furnish infor.tation on t!.c reta, quantitio, 69 d dig err,a1 yg redius of tho. e radioactive tastes tha: vill to niersed.
D g
y !*
! The $ 6.f.s. of water that vv.dd be lost throuch evaporation in the project cooling process may prwe detrimental to fishery re-i sources.
j Th!r divertice reduces the amount-of available fresh water in the De3avarc River needed for fi:;h and wildlife production in the l
Delcware River and estuary.
This water withdrawal in addition to the i estuary, consumptive uses of water cwid cause* serious water shortages in th i
l We underdand that tNe applicant's pre- and postdevelopment radio-logical ano envaronmensaA monnorire will incluut uardy vasor .
-- samplec and quarterly river sediment, fish, and other biotic su:ples, l h The applicant also will monitor terrestrial vegetat!on semiennusily tad soils annually. Those monitoring proi,rers should be coordinated t
dth the Eureau of Sport Fisheries and Wildlire, the office of Water
- Prop es of the D:vironmental Protection Atener (Federal B> Pennsylvania, fish Com:sission, and other natural resource)c, obse scencies. _ The appliennt's monitorier pro ram should be expandad to the i <
k include and aquatic plants and benthic animals such as clams, crayfish, insects.
- , Fishes which depend en various food webs includins i some bottce feeding species such as suckers, carp, and catfish and scoe L i piseivorous species such as bat 4 and crappie also should be sampled.
ij The terrestrial animals such as cottantail, pheasant, and squirrel should be sasipled quarterly. Animals with different food habits are likely to differ significantly in their concentration of radionuclides.
Possible adverse effects of thermal and ehemical water-purifyinc d additive discharges and o' f water intake velocities also are
- concern, The Delsware River intake and pumping facilities could entrein signi. '
mile reach of the Fast Branch of Parkiomen Creek w
. by.the proposed transport of $ c.f.s. of Delaware River water.
a Water quality of the creek would be degraded, and the larger flows
- would cause accelerated stream bed and bank erosion. However, the M j. lower two-thirds of the affected reach could benefit free the larger, y more constant flows.
The applicant should include in the environmental monitoring program, studies which show the effects of the project on fish and wildlife of the affected stream sections, j
The monitoring elso should be planned, implemented, and evaluated in cooperation with the appropriate Federal and State regulatory agencies. ;
3 C n...- _,-.-. . - ~ ~--
y_
_ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - ~ - '
i
<o
- 148 - !
1 09 a '
6 f] Tbc prcoperetional study rhodd inventory the natural resources, ih
- /
- deter;dr.e hir uno, u.d set forth the effect the project is expected to have on the resuarecs. Ti! e postopciational study should verify j :
the c clynes and include remedial r.cacures, if deemed necessary by i%
s the appropriate aten-les.
I If the nonitoring pregams dioelose ht plant operation will or has
} remited in enviro.tental chnnges detriacntal to fish and wildlife, i prwision for r.odifyire, project structures and operations to proteet' these resources should be planned and put into effect.
In view of this agency's policy to maintain, protect, and improve the f quality of the fich and wildlife recources and the environment, it is reccer.caced that the cmstruction pernit for this project not be, issued untn tb eTpHear.t pr~f19.e: tw c =1::1er, tith :::ur=; e:t'.::::t:r/
f$ to the Secretary of the Interior that the project would be cora;tructed l" and operated in a ranner which wi31 neither harmfully reduce the water i*M(a j.
i*j%
quality in the r.ffected arca, nor create intoleraMc adverse effects on fish and vildlife re:curecs. Such a::utcn:cs should tc dcaonstrated by the Philadelphia Electric Company as follws
- 1. Cooperate with the Bureau of Sport Fisheries and Wildlife, the Federal kater Quality AcLainistration, the l
t Pennsylvania Came Connaionian, the Pennsylvania Fish Ccmaission, the Pennsylvania sanitary Water Board, and
' other interested Federal and State agencies in the plan-aing, itaplementation, and evahation of the pre- and post-development radiolc61 cal and environmental monitoring ,
' 8 yrograms. j i l j 2. Prepare and provide five copies of the pree2velcpment I i
>t radiological and environmental monitoring programs to the
- gylj Secretary of the Interior for evaluation prior to project aparation.
,g
- 3. Provide infonsation on the rates, quantities, and din-persion of radioactive wastes that will be diccharged from the plant.
x 4. Include in the pre- and postdevelopment radiological sonitoring pro;;ran, representative aquatic plants, tenthic animals, and terrestrial birds and mar.:mals. Samples should be collected at appropriate locations and times.
- 5. Construct, operate, and maintain such fish protective facilities over the intake structures as are necessary to prevent significant damages to the fishery resources of the e Schuylkill and Delmiare Rivers.
k
t 3N1 Ws - 149 - i A
- 1. :y.s ,.
-l
- 6. Inchde pre- and postoperctionel envjron: ental studies
- z. ! of the tuenty-nile reach of the 3 cst Err.nch of Perkio an de. t* Crech und 6t. the Delnware ilivur inta2e to deterntne and rcetiP/, if necc:: try, the crfects of tran:portin , Dolnware F,her vat.rs to the pla::t. T rse studies should bc rlt.nned
, , and coadacted by the ripplic:.nt it. cooperation with the appropriate Feder:d said State flun and wilulite conservation acencles.
i: 7 To protect the fish and wildlife recources, make such l
t ,"
l podifiestions in pecject .str.:cture and operation as say be 1 Getcri.ined necenst.ry by the interestod Federal and State
{ a6encies.
The opportunity of providing our ccrments is asuscisted.
gi Sincerely yours,
/tklkA Yi
, Ly. 1r..t.
i .
e 1
s.
a e
e f*
- 4 l,
... , . . . .. ._-n L_-________-------- - - - - - - - - - - - - -