Text
-
cyygf/UU-~hgUt/:8U 17W 010) 040 6773 DIR. LICENSING
@ 002 10 CFR 50.90
.g V
PECO NUCLEAR escota o<como er 965 Chesterbrook Boukvard A Unit of PECO Energy wayne. PA 19067-5691 April 21,1999 l
l Docket No. 50-353 License No. NPF-85 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Limerick Generating Station Unit 2 Additionalinformation Concerning Technical Specifications Change Request No. 98-07-2 l
l
Dear Sir /Madarn:
I This letter is in response to a conference call bet *;<en PECO Energy Company (PECO) and U.S.
Nuclear Regulatory Commission (USNRC) staff on April 20,1999, concerning Technical Specifications Change Request No. 98-07 2. This change request was submitted to the USNRC on March 11,1999 (letter from G.D. Edwards (PECO) to USNRC) and will revise Technical Specifications Section 2.0 to incorporate revined Minimum Critical Power Ratlo (MCPR) Safety Limits due to the use of cycle specific analysia performed by General Electric Nuclear Energy (GENE) for Limerick Generating Station, Unit 2, Cycle 6.
The attached letter from J. A. Baumgartner (GENE) to J. M. Carmody (PECO), dated April 21, 1999, contains the information requested during the April 20,1999, conference call. This letter confirms that the Limerick Generating Station Unit 2, Cycle 6 specific MCPR Safety Limits were calculated using tne methodology defined in Amendment 25 to GESTAR 11, approved March 11, 1999 and the R-factor Calculation Method for GE11, GE12 and GE13 Fuel, approved January 11, 1999. This information does not affect the No Significant Hazards Determination provided in our March 11,1999, submittal. This information is being submitted under affirmation, and the required affidavit is enclosed.
If you have any questions, please do not hesitate to contact us.
I Very truly yours, e om.,
Garrett D. Edwards j'
Director-Licensing Q
o u b, -
O
Enclosures:
Attachment; Affidavit f
cc:(w/ enc) H. J. Miller, Administrator, Region 1, USNRC A. L Burritt, USNRC Senior Resident inspector LGS R. R. Janati, PA Bureau of Radiological Protection 4
9904290207 990421 PDR ADOCK 05000353 P.
~
f
[ _ __ _ _._. _._ _
t'Atl~ 1919EU10,Jo G53h) o 1
c COMMONWEALTH OF PENNSYLVANIA -
- ss.
COUNTY OF CHESTER J. J. Hogan, being first duly sworn, deposes and says:
That he is Senior Vice President of PECO Energy Company, the Applicant herein; that he has read the foregoing letter conceming Technical Specification Change Request No. 98-07-2, for Limerick Generating Station Unit 2 License No. NPF-85 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
i W
i Vi Pabsident l
Subscribed and swom to before me this *f day I
~
l of 1999.
I
\\
a?.<
A lD :"?"~Q%.
e aAca-.
'/
Notary ublic p
E i?
's ".'" 5 5,?.:. h'
.Y E.~ :,. 5 5. *. h.
- ?:.* ~ =
r
,[$ ** '.......** y',' A'j 4
%,""m.*.j
c
. Note.ong rnet Seal s
gg,gggyy fAember.Pmneytvania Assometionof Noteries
(9(y2p 99 TtIU 07:16 FAI 610 64W 6773 L08L2. LQKQwggg$
@ 004 Apa.ct-a,es,La r;4n,ea-NucL An rust
- >,cac 7 s:o*
Pac'2 res CE Nuclear Energy John A. Baumgsrtner Nuchasr fuel Sentor fuelProject Meneger Gent'e'Dettnc Compsey Product Menegement 9 o sou rso uc An Mmnye NC 3 401 0700 (S 101 t7s-St2 f i
Fes 1910) 67s. site April 21,1999 oc: K. W. Hunt JAB;P99-026LM J. L. McHale P. J. Vescovi S. B. Shelton G. A. Watford Mr. J. M. Carmody Fuel & Services Division PECO NUCLEAR 965 Chesterbrook Boulevard Wayne, PA 19087-5691
SUBJECT:
Limerick Unit 2 Cyde 6 Cyde Specific SLMCPR
REFERENCES:
- 1. Letter, R. M. Burrovich (GE) to K. W. Hunt (PECO Nudear), " Limerick Unit 2 Cycle 6 Safety Limit MCPR," February 4,1999 (and attachment).
- 2. Letter, Fra:1 Akstulewicz (NRC) to Glen A. Watford (GE)," Acceptance for Referencing of Licensing Topicnl Reports NEDC-32601P, Merhodology and Uncertaintiesfor Safety Limit MCPR Evaluarians; NEDC 32694P, Power Distribution Uncerta! stiesfor Safety Limir MCPR Emluation, and Amendment 25 to NEDE-24011 P A on CycIt Specific Safety Limit MCPR (TAC Nos. M97490, M99069 and M97491)", March 11,1999.
- 3. Letter, Thomas H. Essig (NRC) to Glen A. Watford (GE)," Acceptance for Referencing of Licensing Topical Report NDC-32505P, Revision 1, R-factor Cokulation Methodfor Gell. GE/2 and GElJ fuel (TAC No. M99070 and M95081)", January 11,1999.
l
Dear Jim:
The purpose of this letter is to clarify the basis for the cyde speciSc SLMCPR analysis for l
Limerick 2 Cyde 6.
l The I.imerick Unit 2 Cycle 6 cyde specific SLMCPR (Reference 1) was caletuated in accordance l
with the NRC approved (Reference 2) cycle speci$c SLMCPR :nethodology de6ned in l
Amendment 25 to GESTARIL The ar.alysis was also performed in accordance with the NRC l
approved (Reference 3) R-factor methodology Very
- ours, J. A.
sums Fuel Project Manager PECO Nudcar I
l APR 21 ' 39 8:37 9106755684 PACE.002
_. - - -.. -