MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld ML20195G4591999-06-10010 June 1999 Forwards MORs for May 1999 & Revised Repts for Apr 1999 for LGS Units 1 & 2 ML20195H0531999-06-0909 June 1999 Forwards Revised Bases Pages B3/4 10-2 & B3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7701999-06-0707 June 1999 Provides Notification of Change to NPDES Permit PA0052221, for Bradshaw Reservoir Facility Which Supports Operation of Lgs,Units 1 & 2,per EPP Section 3.2 ML20195C7631999-06-0101 June 1999 Notifies NRC That PECO Energy Has Completed Installation of New Large Capacity,Passive Strainers on RHR & Core Spray Sys Pump Suction Lines at Lgs,Unit 2,in Response to Ieb 96-003 ML20195D5381999-05-26026 May 1999 Forwards 1998 Occupational Exposure Tabulation Rept for LGS Units 1 & 2. Encl Is Diskette & Instructions.Rept Is Being re-submitted to Reset 12 Month Time Period.Without Disk ML20195B2821999-05-24024 May 1999 Requests That NRC Distribution Lists for LGS Be Updated. Marked-up Distribution List Showing Changes Is Attached ML20196L2891999-05-20020 May 1999 Provides Status Update of Thermo-Lag 330-1 Fire Barrier Corrective Actions,Iaw Commitments Made in ML20195B2951999-05-20020 May 1999 Forwards Rev 0 to LGS Unit 2 Reload 5,Cycle 6 COLR, IAW TS Section 6.9.1.12.Values Listed Have Been Determined Using NRC-approved Methodology & Are Established Such That All Applicable Limits of Plants Safety Analysis Are Met 05000352/LER-1999-003, Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv1999-05-19019 May 1999 Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv 05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 9904191999-05-18018 May 1999 Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 ML20206E2001999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept (Non- Radiological) for Limerick Generating Station,Units 1 & 2. Rept Submitted IAW Section 5.4.1 of App B of Fols,Epp (Non- Radiological) & Describes Implementation of EPP for 1998 ML20206D8801999-04-27027 April 1999 Forwards Rev 2 to LGS Unit 1 Reload 7,Cycle 8 COLR, IAW TS Section 6.9.1.12.COLR Provides cycle-specific Parameter Limits for Noted Info ML20206A5461999-04-21021 April 1999 Responds to Conference Call Between Util & NRC on 990420,re TS Change Request 98-07-2,revising TS Section 2.0 to Incorporate Revised MCPR Safety Limits.Attached Ltr Contains Info Requested ML20205T0441999-04-17017 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept 15, IAW TS Section 6.9.1.7.REMP for 1998,confirmed That LGS Environ Effects from Radioactive Release Were Well Below LGS TSs & Other Applicable Regulatory Limits ML20205Q7581999-04-15015 April 1999 Forwards Response to RAI Re ISI Program First & Second 10-Yr Interval Relief Requests.Revs to Identified by Vertical Bar in Right Margin 1999-09-09
[Table view] |
Text
+ ~ ' *
- Etition Support Department
--Elim y
EPP 3.2 PECO NUCLEAR reco ree,2, cemme,,
A Unit of PECO Energy ha P I
l l
June 7,1999 Docket Nos. 50-352 1 50-353 License Nos. NPF 39 NPF-85 NPDES Permit No. PA0052221 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station, Units 1 and 2 Changes to National Pollutant Discharge Elimination System Permit
Dear Sir / Madam:
This letter is being submitted in accordance with the Limerick Generating Station (LGS), Units 1 and 2, Environmental Protection Plan (EPP) Section 3.2, which stipulates that the NRC shall be notified within 30 days following the date of approval of a change to the National Pollutant !
Discharge Elimination System (NPDES) permit.
By letter dated May 18.1999, the Pennsylvania Department of Environmental Protection (PA DEP) amended Bradshaw Reservoir NPDES Permit No. PA0052221. The Bradshaw Reservoir facility supports the operation of Limerick Generating Station (LGS), Units 1 and 2. The amendment to NPDES Permit No. PA0052221 reflects modifications to the monitoring frequency for dissolved oxygen, fecal coliform, and pH. The NRC was previously notified regarding the pending changes to the NPDES permit by letter dated December 9,1998.
Accordingly, this letter provides the required notification of a change to the NPDES permit and is being submitted within 30 days of the permitting agency's approval in accordance with the requirements of the LGS EPP. A copy of the PA DEP letter amending the Bradshaw Reservoir NPDES permit is attached.
If you have any questions or require additional information, please do not hesitate to contact us.
Very tr;ly yours,
\
il e g ,44 A J GG ;
- Garrett D. Edwards Director- Licensing
[)
' Attachment cc: H. J. Miller, Administrator, Region I, USNRC (w/ attachment)
A. L Burritt, USNRC Senior Resident inspector, LGS, (w/ attachment) 9906140069.990607 PDR ADOCK 05000352-p PDR 7 U' . -
, gg \
Pennsylvania Departm 4 of Environmental Protection Lee Park, Suite 6010 555 North Lane Conshohocken,PA 19428 '
Southeast Regional Office '
610-832-6130 Fax 610-832-6133 Mr. Robert M. Matty, Jr.
Engineer, Environmental Affairs !
PECO Energy Company 2600 Monroe Boulevard Norristown,PA 19403 !
Re: IW NPDES Permit PA0052221 Amendment No. I Bradshaw Reservoir Release Bedminster Township Bucla County
Dear Mr. Matty:
Referenced amended permit pages 1,2 and 2a are enclosed.
Please study the amended permit pages carefully and substitute these pages numbered pages in your permit issued Novrmber 9,1998. Please direct any questions to the Section of this office.
This amendment rebects modifications to the monitoring frequency for d coliform and pH. A minimum of five samples must be collected every month at Outfall 001 analyzed for these parameters. The sampling period for these parameters is May to Sep fecal coliform level shall not exceed a geometric mean of 200 col. per 100 milliliters based consecutive samples, each sample collected on different days.
Sincerely,
/-
ames Ne bold, P.E.
Regional Manager Water Management
Enclosures:
Amended Permit pages 1,2 and 2a Amended Master Discharge Monitoring Report (Only page 1 of 3) I cc: Bucks County Health Department Bedminster Township (Transmittal letter only) l Permits and Compliance Mr. Roth Re 30 (GJC99)113-11 An Eqd OpportunityW6nnadve Achon Empbyer http //www.dep. state.pa.us Printed on Rencled Paper
.ww-r m-evwous onze COMMONWEAL.TH OF PENNSYLVANIA
- DEPARTMENT OF ENVIRONMENTAL PROTECTION WATER MANAGEMENT PROGRAM AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NPDES PERMIT NO. PA 0052221 Amendment No.1 in compliance with the provisions of the Clean Water Act,33 U.S.C. Section 1251 g 3g3;. (the "Act") and Pennsylonia's Clean Streams Law,33 amended. 35 P.S. Section 691.1 g agg.,
PECO Energy Company - Client ID No. 83285 is authorized to discharge from a facility located at Bradshaw Reservoir - Site ID No. 452264 Elephant Road and Central School Road Bedminster, PA 18944 Municipality Bedminster Township County Bucks to receiving waters named East Branch Perkiomen Creek in accordance with effluent limitations, monitoring requirements and other conditions set forth in Parts A, B, and C hereof.
THIS PERlW;if SHALL EXPlRE AT MIDNIGHT, 1U09/2003 The authority granted by this permit is subject to the following further qualifications:
- 1. If there is a conflict between the application, its supporting documents and/or amendments and the terms and conditions of this permit, the terms and conditions shall apply.
- 2. Failure to comply with the terms, conditions, or effluent limitations of this permit is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application.
3.
Complete application for renewal of this permit, or notification of intent to cease discharging by the expiration date, must be submitted to the Department at least 180 days prior to the above l expiration date (unless permission has been granted by the Departraent for submission at a later date), using the appropriate NPDES permit application form.
In the event that a timely and complete application for renewal has been submitted and the Department is unable, through no fault of the permittee, to reissue the permit before the above expiration date, the terms and conditions of this permit, including submission of the Discharge Monitoring Reports, will be automaticahy continued and will remain fully effective and enforceable pending the grant or denial of the application for permit renewal.
'4. This NPDES permit does not constitute authorization to construct or make modifications to wastewater treatment facilities necessary to meet t.% terms and conditions of this permit.
DATE PERMIT ISSUED 11/09/98 ISSUED BY &
/
- DATE PERMIT AMENDMENT ISSUED 05/18/99 TITLE: Regional Manager Water Mamazement ,
CATE EFFECTIVE 06/01/99 Re 30(GJC98)l67-6d
.I.
8 .
6 1
'1 1 1 r
2 2 o r 0 ur r) oo t
e (4 2 N . ,
gs t H p d C.
5 0 t n nn t s en 3 0
A m e
d e
i tr e om n
e 4RU A 2
M dn C o 7 pe pi r m
e m
e uu i r
d m m s q u e e e d e
a s e q r l o.A er
.t i R e ip umy p d r
o b
a b
a b a
N t dl R r r r
.n aa S qaT c G G G i
t no g n ReS R e 1
= ,
mit i r
0 e
= 0 P tud i
t o l l
ad y s '
fta m-i 7 cA n e e u 5
i o urt = o ht ht ht u m pos l
M u n n n O 3
2 u pl aa msu se==
ia n o o o S t a n iemq i
t M M M T r it e e n o / / )
N E
i p ms x re (y e MM r F C 5 1
/
5 (
s n
x e pl o M
E d e ep' i t
a n h p m c R
I I t a m /r t o
.U l e i t ns t .u t oro l g
S EEQ hd e n sn m i
Mr i
np n geb m I x i
oe s e
i w
I a T GR I
e v
uie or r r M
MR m l o
hhi i l fo i
R u t LN t q e
l l
II ) a e .
CTR r m g. ht 2a I
, s wg /g uv t
a _
AO FP e loi r n
(m mA 0 t s tag e .
c f o s iy i n na RRE 1
n di nl i 6 ep 2
t n i U u nn MDa a o ka n 3' s ao s
ED 1 s sm i
t dr t o TN AA '5 7
i i
c t d s a
r t d a
b "d e" -
s n n n ey / n l l
a at e i l WG EN 0 r a~
te s cn i
o e c
n gl ah rt
/r ort io t
ol cm S t
h o set n TP I e
i i
s ao t
t a o e vo n np oe 0 0 #0 0 vo ru at ri i C o o SE d u fht a a r AM MR 0 1 9 o bF AEK i t
d ci i L
2 t a e g orei i WD n o
i r t e at l
m'. t n m 6 0 d e i ,
e s LR L pwn)a e e
u t.
u . f o
f io s cl AO C e te u2 h sf l
f s m 0 s e pA af ge I r l f ,ni 5 t E I ni s s"
t E
i i
R T R o
v gwe n gp a
M i m t 0
5" r id n L n SG 4 e s
r ut ein n e mg UN I 4'
R e deipona w o_ i ht ei n
DR 2
uy i 'irlp u
NO 0 4 w a
ri fota at i
mi l W qm IT I h h n c aem a ia x e r a s RN d s
a is d ht, rfo d
/ aD gm OO FM d e B r d nas n o ant Il b l
s M i nr rf o u t { oi o t e a t l SS d a s n o t i TN i
t a ed mt n i t ey o c m z'n r o d n e a gl NO I L o i
oiem Us ah rt mlac ET ,. fr t mle s a ve o n hf e e MA EI T e t
a r
hWap ua s r /o S rp u M .AM t
h n t i g
I wur i
RM I 1 w
e i
e pd nd ee ana ed I L 0 t U T 0 s a
t h it t s r
- cd ne QN w mnne r oet t s t
e e N " i at c e
EE l
s e
e pd m on E pl RUL l i v
e es co eut m a G Y M mlo oc e
6-E t l fta c ha oo I BdF r
a X R O
ce 7 6
G w e r
P O nb l u ) F i l
)
R ~t O h e D I nl a 8 G D) c g L) keh
) 9 A- o r i h
r a M E0 O0 0 a s C HA F w ab h
c ( L9 V3 - C 3-L 9o
ep l
J G
CT s
SR i
D W Oo At o l pma (
0 O ISt t _
I S1 - C1 mS 3 DPA 1
L E - H- a e 1
F D5( F(5 p(5 S* R
~ -
e ~
y.-
Jouw-rm.wyvevs a/n Pzrmit No. PA 0052221 Amendment No.1 DISCHARGE REQUIREMENTS FOR INDUSTRIAL WASTEWATER FACILITIES PART A - EFFLUENT LIMITATIONS, MONITORING, RECORDKEEPING, AND REPORTING REQUIREMENTS (CONT'D)
- c. All discharges of floating materials, oil, grease, scum and substances which produce tastes, odors, turbidity or settle to form deposits shall be controlled to Icvels which will not be inimical or harmful to the water uses to be protected as to human, animal, plant or aquatic life.
I
- d. He permittee shall provide for effective disinfection of this discharge to control disease-producmg organisms. ;
During the swimming season (May 1" through September 30*), the maximum fecal coliform level shall be a geometric mean of 200 per 100 milliliters (ml), based on five consecutive samples each sample collected on different days.
Footnotes (Refer to Page 2) l (1) When sampling to determine compliance with mass effluent limitations, the discharge flow at the time of sempling must be measured, recorded and reported on the Discharge Monitoring Report Form.
{
(2) He Instantaneous Maximum Discharge Limitations are for compliance use by the Department only. Do not report instantaneous maximums on Discharge Monitoring Reports (DMRs) or supplemental DMRs unless specifically required on those forms to do so.
j Re 30 (GJC98)l67-61
- 2a -
~
L R
c E ,
3 P (p ( (
7.CA N 5l 5FE 5D F C M C F A N
_ 0A C C M 1 - i - I L O R A D A P
E 1
F.,* O E RU E 1 1C 1S S O U U R C
J O - M -
T T
0 OA bO W N N I
E C.
E D M R M m C R M 9- 9L 9,L T C K D A E E E I 9M E T Y P 3 3C 3V P Y P I
A D S T I
)0O 0 a 83 N P R ) )0E r A S E D
L T R P
)l 3 T E J L D a E 2 C E E T C 6 0 A O I m I P
I F O e E S P 2 C
- 1 N R A O X t e Y S I 3 O A 6( D PR L R Y r : N :
I 0 fR E E
X G B B T B I
L 1
E M e
v X TN I
E M E U E R R A M N E
/
9 P C
U N C D A A D A E A
- L IT K M SL D E R R D 8 A V S I S L K G D
- 8 N E N C I P E Y R E
)
p A R M e R M e R M R M R M R M R M S l
l I
A i
l T C S r T e a e a e e a e e e e e e e e T O l O S e I qP sSqP sSqP sSqP a a a E O W ,A S v O ue ua u e u a u a u e sSqP ua ue sSqP u e mSqP sS T oi N o"S ir r
em r
m ir s
e.p e mi e eu iu r m r u. m ir r r m rir ua r
e m c a u;e ua r R ll R P R M I AS RBAI e m ep em m ir e m E A E P
_ u O b f
- EN EF WUEANC e mt i w iw.
c mpl e mu e.pl e w t i a el emit c mp iim u m p . m mp T E A OA BSSDE R n s t e e e .
e el t m.el_. t i e el O L S F te E 19 E
- 18_RR kP E AT u. N i n e . .
n .r n n e. - n men OD i
R 1 T Y t . .
d w t t t t t .
t t t t
W E A e N MF I t N P i
ATa S t
oi N n I B O Y i V 01 n Y 6ye ma S.U. THwLN F NU S l A O N ATIN E A i -
i C ,OI MA I 8 mn.
l m V MD M l N R 69 a I ol{ c I T H F F MILE x x x x x x R
EO OV P T y O n ul NE O OYIA R x x x x x x PN NE R 9 L hs t d0 CR R R R E P x R E b
e A e0 LEM x x u
x x OIT TR O u af 1 UD A T nnAI R A i T O BNI%
Q T A N x x x x x RO TR iA l
A L
E S
e I
de NEOT I
UTL LG D A O sN GSNAR H TY I /
YE S d
N 35 uD TGI S NY I I TO Q S
E S ep3HN I N HF
( at r o3EI P IFTGO E L U T R s R FI A A O N e )$U1 .SSO C U NW N f
e ,0 S NA ,E T HT OT F
M M T A r
e 0.CI B T A EH RH x x x x x x R
EO DA I T
T I
n c
0 0{L IP l IE C I OS MA x x
x x
x x
x x
x x
x PIN AX Y O e a3TN CNEA TIT x x x x x x OT I I LM O Y N n x RO E a
l d1 9OTYA L UF RO AR INNO A I
H TR YU R A A L
(
l a
o.
r FTEETMD AI SE V
/
M L O
R P E
AD P R P mSO F S V UP t I R t a
I m (P N F A T I A e E a I P
c h x i.e. AEONO R D ,NAI DBE UMR S D
I IM A nCL I L L m% UNS C L N 0 dI I A m e u;D 1TON x x x M U G M T 0 mAJT C n mes I B OI S TD A x x
x x
x x C N
I O N 5 eRA E s t
MM M T U 22 nGE NT EMHYR x x D P BI x S h imuPT I L S M
t r nRT I!JME e p 2 N MD ll E e r dI DT EER E eS B 1 P ) kr
.- OJO N F .E VDEx I A E O.
A M AI EI AN M D R OIS A M
-- t T I F TEAN I
M NC e--s hNS E L A HLNE e
O P Y O I I I
eTEMEYDD x x x x I TI A R E R
t 6 x x 5 x x NIN N O R M 0 x x 0 x x SM I
T T
M S x x x x T
. U O RG I
I T OG I
M R NE 4 E n A N T NI GEL 0 X O G RI W
l I
P uT R R U .
P EM PI i R E E l
C E O n O MA QU R
ll ON A l S F R M Y OI R
l A P UR x x EO x x OV L A E D TIT M TI x x 0 2 PN x x NE I A D S I
( O A HN OIC x
x x
x 0 OIT x x TR T Y R C DN RO x x iA Y RP TR l
LG O I
MS I LA I
N I Z F
/
YE R A RY 1
DEX C R ) S O /
T T 0 9 A E O M G 0 E B
/ GC N O E 0 2 EU NT C N
1 M
E 0 0 TI D E (
U 3 V E
I N AM N T
U N S S x x x x I I LN R M P D
E 9.T x x 6 x x A D B D 0AI x x x x YI T A E E A M CA 0 S
)
A x x x x I
O Y R ) _
. OR x V U N DE .
EA G. M S T U E N B L E t s x U O M s eC M N P T a c x N T I
T U H o MO x I E
M O .U t
t./ x T S
R N R E B E e E a N R d E EN i _
n W XO s t
A .
r u SOF L O B E c
t oi u
t MO R _
P Y Y F n hB a E S I 5/ U A R s e aN M g
e A
R a
l 1 A M N T N E Q e b S t OA _
O 0 O I N N N N A L O F U of R. P Y E r e 2 P t
O T T T S N e f
0 I
I i
f 1
8 O I S C c g 0R 3 5/
U Y o i4 O S o0 0 D m n -0 V M A pl F0 E 9 _
/ O T e a
2 0 E R E S t
i n c s
0 4 .D _
0 C C G C TA g i 3 R R A A R
A O
R YM P P t
h m i _
D B B B D i
s l e
A E EL f o
Y D E r m
P:perw:rk ReductiIn Act N:tica ,
Public reporting burden for this collection ofinformation is estimated to vary from a range of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> as an average per response, for some minor facilities, to 110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br /> as an average per response for some major facilities, with a weighted average for major and mmzr, -
facilities of 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this :ollection of infonnatioa, including suggestions for reducing this burden, to Chief, Information Policy Branch, PM-223, U.S. Environmental Protection Agency, 401 M Street, SW, Washing:on, DC 20460; and to the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, DC 20503.
General Instructions
- 1. If form has been partially completed by preprinting, disregard instructions directed at entry of that information already preprinted.
- 2. Enter " Permittee Name/ Mailing Address (and facility namellocation, if dferent)," " Permit Number," and " Discharge Number" where indicated. (A separate form is required for each discharge.)
- 3. Enter dates beginning and ending " Monitoring Period" covered by form where indicated.
- 4. Enter each " Parameter" as specified in monitoring requirements of permit.
- 5. Enter " Sample Measurement" data for each parameter under " Quantity" and " Quality" in units specified in permit. " Average" is normally arithmetic average (geometric average for bacterial parameters) of all sample measurements for each parameter obtained during " Monitoring Period", " Maximum" and " Minimum" are normally extreme high and low measurements obtained during
" Monitoring Period " (Note to municipals with secondary treatment requirement: Enter 30-day average of sample measurement under " Average," and enter maximum 7-day average of sample measurements obtained during monitoring period under " Maximum. ")
- 6. Enter " Permit Requirement" for each parameter under " Quantity" and " Quality" as specified in permit.
- 7. Under "No Ex" enter number of sample measurements during monitoring period that exceed maximum (and/or minimun or 7-day average as appropriate) permit requirement for each parameter. If none, enter "0".
- 8. Enter " Frequency of Analysis" both as " Sample Measurement" (actual frequency of sampling and analysis used during monitoring period) and as " Permit Requirement" specified in permit. (e.g., Enter " Cont," for continuous monitoring, "l/7" for one day per week,"l/30" for one day per month, "l/90" for one day per quatter, etc.)
- 9. Enter " Sample Type" both as
- Sample Measurement" (actual sample type used during monitoring period) and as " Permit Requirement,"(e.g., Enter " Grab" for individual sample, "24HC" for 24-hour composite, "N/A " for continuous monitoring, etc.)
- 10. Where violations of permit requirements are reported, attach a brief explanation to describe cause and corrective actions taken, and reference each violation by date.
I 1. If"no discharge" occurs during monitoring period, enter "No Discharge" across form in place ofdata entry.
- 12. Enter "NamelTitle of Principal Executive Oficer" with " Signature of Principal Executive Oficer of Authori:ed Agent "
" Telephone Number ~ and "Date" at bottom of form.
- 13. Mail signed Report to Office (s) by date(s) specified in permit. Retain Copy for your records.
- 14. More detailed instructions for use of this Discharge Monitoring Report (DMR) form may be obtained from Office (s) specified in permit.
Legal Notice This report is required by law (33 U.S.C.1318; 40 C.F.R.125.27). Failure to report or failure to rer ort truthfully can result in civil penalties not to exceed $10,000 per day of violation; or in criminal penalties not to exceed $25,000 per day of violation, or by imprisonment for not more than one year, or by both.
EPA Form 3320-1 (Rev. 9-88) i J
F:
t-l}
-..r ,
! ' To Callulate Mass of Pollutants For a Sampling Event -
l . ; w;. .
~
,.-~ ,
Use the sampling event reported concentrution .md perfo'rm the appropriate calculation as follows:
concentration (pg/l x 0.00834 x 3 flow (million gallons / day)= lb/ day or ,
concentration (mg/l) x 8.34 x flow (million gallons / day) = lb/ day The value assigned tofflow (million gallons / day)" should be the 24-hour average flow for the outfall on the day the sample was taken. Where an outfall discharges for only pan of a day (x hours), the daily mass value should be determined by using the x-hour average flow.
To Calculate an Arithmetic 'Aversee or Mean Use the following equation: -
Xs + X1 + Xs + Xa +...Xx
. I n = number of results X = value ofeach analytical results For example.
' five samples were analyzed, their results were 75,82,90,70, and 85. , / .3 75 '+ 82 + 90 + 70 + 85 1
=: 80.4 5
I i
To Calculate a Geometric Mean or Geometric Iverane (For Fecal Coliform Only) .
Use the following equation:
., '[
. 4 n]Xn x X1 x Xs x Xs x...X.s ,
n = number of analysis results Egini If any value of X is zero, substitute X = value ofeach analytical result a 1.0 for the calculation.
l
- For example, i l: five samples **ere analyzed, their results were 75. 82,90,70, and 85.
t :r .
L i 5]75 x 82 x 90 x 70 x 85 = 543,293,325,000 = 80.1
~
l i .
l- .
l
~
U
INSTRUCTIONS FOR UTILIZING _ ,
NATIONAL POLLUTANT DISCHARGE ELTuTNATION SYSTEM (NPDESi DISCHARGE MONITORING REPORT (DMR) .
The original DMR form (s) included with your permit are provided to serve as a master. Copies of this form must be used when reponing the results of the monitoring requirements in your permit. Do not write on or send the original master. If you receive computer generated preprinted DMR forms. they should be used in place of the enclosed forms.
Please make 'a note of your permit expiration date on the master DMR so that you will be reminded to submit your renewal application 180 days prior to expiration.
A " Monitor / Report" requirement contained in a permit requirement block indicates that the parameter is monitored and the test result reported in the appropriate block. Any test methods specified in Part A or Part C of the permit must be used. ,
. An " Average Weekly" value is defined as the highest weekly arithmetic average value observed during the monthly monitonng period.
Loading or mass units shall be reported as the average of the calculated daily loadings during the monthly, weekly,0. :!.aily measurement pe,riod. .
For parameters for which the effluent limit is lower than the Method Detection Limit (MDL) of the most sensitive existing EPA approved (40 CFR Part 136), test method or DEP approved method, the parameters -
should be analyzed using the test method specified in Part C of the permit. The sample results must be specified on the DMR form as either the measured (quantified) value or as "less than" the detection limit used in the test (e.g. < x.x). Results SHALL NOT be reported as "Not Detectable" or "ND". For computing monthly averages, all "less than" sample results may be counted as zero values. All sample results used in computing monthly average values must be reported on the DMR form in the DMR comment section.
You should also note any other special instructions or definitions contained on the front and back of the DMR as well as in the permit.
Submit the completed forms to: DEP, EPA and the County Health Department as required in the permit. Unless otherwise specified in the permit, the DMR form must be submitted each month. If there is no discharge during the month, the DMR must be submitted with "NO DISCHARGE" written across the front.
,