Ack Receipt of ,Per 850730 Telcon Re Description of Activities & Schedule to Complete long-term Corrective Actions for Noncompliance Noted in Insp Repts 50-293/81-18 & 50-293/81-22
ML20135B559
Person / Time
Site: Pilgrim
Issue date: 08/28/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
References
NUDOCS 8509110100
Download: ML20135B559 (2)


Text

.. -

.

%

ElIG 2 81985 Docket No. 50-293 License No. DPR-35 Boston Edison Company M/C Nuclear

'

ATTN: Mr. William D. Harrington Senior Vice President, Nuclear

800 Boylston Street Boston, Massachusetts 02199 Gentlemen

-

Subject: Inspection 50-293/81-18 and 81-22

This refers to your letter dated August 7,1985 in response to our telephone conversation on July 30, 1985.

Thank you for providing a description of your activities and schedule to com-plete your long term corrective actions for Item of Noncompliance 81-22-01.

These actions will be examined during a future inspection of your licensed program.

Your cooperator with us is appreciated.

Sincerely, Originni Signed Byr Jacque P.Durr Stewart D. Ebneter, Director Division of Reactor Safety cc w/ encl:

A. V. Morist , Manager, Nuclea Management Services Department C. J. Mathis, Station Manager Joanne Shotwell, Assistant Attorney General Paul Levy, Chairman, Department of Public Utilities W. J. Nolan, Chairman, Plymouth Board of Selectmen Plymouth Civil Defense Director Senator Edward P. Kirby

. E. R. MacCormack, Senior Regulatory Affairs and Program Engineer (Receives

'

SafeguardsOnly)

Public Document Room (PDR)

Local Public Document Room (LPDR)

l Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Massachusetts (2)

DR D S8 OFFICIAL RECORD COPY RL PILGRIM - 0001.0.0 gg l 08/27/85

!

.~. - .~ , , , , , . - - , - - - - - . _ ,

. ._ _. _ . _ . _ . . . _ _ _ _ __ . _ __

. _ _ _ . . . _ . _ . . _ . .

_

.

.

.-

bec w/ enc 1:

Region I~ Docket Room (with. concurrences)

Senior Operations Officer (w/o encl)

Section Chief, DRP t i

t

!

s

!

-

i l

i

!

i

.

.

i

!

. t

!

RI:DRS RI:DRS RI:DRS-Anderson /ca Durr -Ebneter h1/8 8Ld/85 - 8/XW8 ,

OFFICIAL RECORD COPY RL PILGRIM - 0002.0.0 08/22/85

. x _. . _

.

' *

.

CD::;T3N EDICON CCMPANY S00 BovLSTON STREET EDSTON, MAS SACHuS ETTs D2199 WILLIAM D. HARRINGTON

.......... ....... , August 7, 1985

" " * * * BECo Ltr. #85- 142 Mr. Stewart D. Ebneter, Director Division of Reactor Safety l U.S. Nuclear Regulatory Commission Region I - 631 Park Avenue King of Prussia, PA 19406 License No. DPR-35 Docket No. 50-293 Subject: Followup Information Relating to INC 81-22-01 Reference: Combined NRC Inspections 81-18 and 81-22

[

Qear Mr. Martin:

Per Boston Edison Company's telephone conversation on 7/30/85 with Mr. Jack Durr of your office, we are providing you with the following information relating to Item of Non-Compliance 81-22-01:

In order to enhar.co the affected Station operating procedures to the point where those procedures will provide the user adequate technical guidance and Tech. Spec. section references, the below-listed activities will be funded, staffed, and completed as follows:

Scheduled Activity Description Completion Date Revise pro'cedures for D4, DS, D6, Yl, Y2, 12/31/85 and D19 to more clearly indicate equipment affected by the individual breakers.

Complete E-203 walkdowns and issue Discrepancy 7/31/86 packages to the Nuclear Engineering Dept.

for disposition.

Revise all affected procedures to include: 9/30/86 1) Applicable Technical Specifications 2) Idalkdown-Observed Configuration Changes

~3) Component Details , ,., c ) (;- OS d c3 6 .... .. , n*J .' 6)b, '

  • . ,. d ',,,~~ ,

-

,_ -

~

>

g p(jg_<w6w

.

e

.

.

.  !

%

BOSTON EDISON COMPANY Mr. Steward D. Ebneter U.S. Nuclear Regulatory Commission August 7, 1985 Page Two

.

We trust that this information will provide the details and content required.

However, if you have any further questions regarding these issues, please do not hesitate to contact me.

Very truly yours, h 11 ---a X,g

- - -

W. D. Harrington

- _ . .

m

.

'

s COCTON 8'$lDSN CEM7ANY 500 50VLaTON STREET 50sTON, M ABBAcHUe rna 02199 WILLIAM D. H ARRINGTO N a.-..............., August 7, 1985

== 6a== BECo Ltr. #85- 142 Mr. Stewart D. Ebneter, Director Division of Reactor Safety U.S. Nuclear Regulatory Commission Region I - 631 Park Avenue King of Prussia, PA 19406 License No. DPR-35 Docket No. 50-293 Subject: Followup Information Relating to INC 81-22-01 Reference: Combined NRC Inspections 81-18 and 81-22

Dear Mr. Martin:

Per Boston Edison Company's telephone conversation on 7/30/85 with Mr. Jack Durr of your office, we are providing you with the following information relating to Item of Non-Compliance 81-22-01:

In order to enhance the affected Station operating procedures to the point where thosa procedures will provide the user adequate technical guidance and Tech. Spec. section references, the below-listed activities will be funded, staffed, and completed as follows:

Scheduled Activity Description Completion Date Revise pro'cedures for D4, DS, D6, YI, Y2, 12/31/85 and D19 to more clearly indicate equipment affected by the individual breakers.

Complete E-203 walkdowns and issue Discrepancy 7/31/86 packages to the Nuclear Engineering Dept, for disposition.

Revise all affected proceduras to include: 9/30/86 1) Applicable Technical Specifications 2) Walkdown-Observed Configuration Changes 3) Component Details - e' G- CN

'"

C a ,s ,de

. . ._G'JG j335q0

~

,,,..L'

.. .

.

  • .

n BOSTON EDISON COMPANY Mr. Steward D. Ebneter U.S. Nuclear Regulatory Commission August 7,1985 Page Two We trust that this information will provide the details and content required.

However, if you have any further questions regarding these issues, please do not hesitate to contact me.

Very truly yours, k $ l-..a r, F1-- ,

W. D. Harrington

.

e A A w a,