Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-457/88-07.Violation Re Failure to Write Deviation Rept Withdrawn
ML20195H626
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 06/17/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20195H633 List:
References
NUDOCS 8806280330
Download: ML20195H626 (2)


Text

_ . - _ _ _ _ _ _ _ .

-

i

-

JUN 171988 Docket No. 50-457 Comonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

Thank you for your letter dated April 29, 1988, informing us of the steps you have taken to correct the violations which we brought to your attention in our letter dated March 29, 1988 (Report No. 50-457/88007). We will examine the effectiveness of your actions during a future inspectio Your letter also requested that we withdraw the violation regarding deviation reporting based on an incomplete understanding of the Deviation Reporting Program at Braidwood. We have reviewed'your response to this violation and the associated Deviation Report which was issued regarding the event, and have determined that this violation should be withdraw The violation was based on the failure to write a deviation report based on a perceived plugged recirculation line from the U-0 boric acid pump. However, a deviation report was written for the inability to obtain flow from this pump at the time of the event. Based on the expected flow from the mini-recirculation line being 2 gpm, and the flow gauge used ranging from 0-90 gpm, we agree that the operator would have difficulty in determining that flow had been established and could have been mislead into thinking that the line was plugged. When the throttle valve 2AB8478 was opened, operators were immediately able te observe and control the recirculation line flow rate. Based on the above, we conclude that a deviation report for the system inoperability was written, and that no separate deviation report was required based solely on a plugged recirculation lin It is important to note that this withdrawal is based on the existence of a deviation report for the event in question and not on your description of when deviation reports are require Our records will be modified to indicate the withdrawal of this violatio !

"

8806280330 880617 7 DR ADOCX 0500 I

[

_ ___

.- - -- -

JUN 17 1988 -

.

<

Connonwealth Edison Company 2 We will gladly discuss any questions you have-concerning this matte

Sincerely, DRIClHAf, SIGflED BY. GEOLEREY C. WRIGHT _

G. C. Wright, Chief Operations Branch, Division of Reactor Safety Enclosure: CECO ltr Jtd 4/29/88 cc w/o enclosure:

T. J. Maiman, Vice President, PWR.0perations D. Butterfield, Nuclear Licensing Manager M. Pallace, Manager cf Projects M. i.ohmann, Project Construction and Startup Superintendent W. Vahle, Construction Superintendent E. E. Fitzpatrick, Station Manager P. L. Barnes, Regulatory Assurance Supervisor Resident Inspector, RIII, Braidwood cc w/ enclosure:

DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII, Byron D. W. Cassel, Jr. , Es Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division E. Chan, 0GC G. Berry, 0GC Stephen P. Sands, NRR The Honorable A. Dixon Callihan, ASLB The Honorable Richard F. Cole, ASLB The Honorable Ivan W. Smith, ASLB The Honorable Gary J. Edles,-ASLAP The Honorable Dr. W. Reed Johnson, ASLAP The Honorable Christine N. Kohl, ASLAP RIII ,A II h RIIIf' RIII Snrl@) 'r Hinds Hare /lc < illips Wrig 6//f/88 6[g[g ( -