ML20204J900
| ML20204J900 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 03/23/1999 |
| From: | Jordan M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20204J904 | List: |
| References | |
| 50-456-99-02, 50-456-99-2, 50-457-99-02, 50-457-99-2, EA-97-265, NUDOCS 9903300181 | |
| Download: ML20204J900 (3) | |
See also: IR 05000456/1999002
Text
,-
ka "*%q'o
-
UNITED STATES
NUCLEAR REGULATORY COMMISSION
,,
o
REGION ll!
f'
7g
801 WARRENvlLLE ROAD
l-
g
~
lisle, ILLINOls 60532-4351
"%
March 23, 1999
g
l
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towers West 111
1400 Opus Place, Suite 500
Downers Grove, IL 60515
SUBJECT:
BRAIDWOOD INSPECTION REPORT 50-456/99002(DRP); 50-457/99002(DRP)
Dear Mr. Kingsley:
i
On March 1,1999, the NRC completed an inspection at your Braidwood Units 1 and 2 reactor
facilities. The enclosed report presents the results of that inspection. During the 6-week period
covered by this inspection, your conduct of activities was generally characterized by safety-
conscious operations, sound engineering and maintenance practices, and careful radiological
!
work controls.
Activities which were of particular note included your operators' performance in addressing
failures of the Unit 1 annunciator inverters. Control room operators promptly assessed the
Unit 1 and Unit 0 annunciator system status, declared an unusual event, made the proper
notifications, identified the inoperable annunciators, and implemented compensatory actions.
Also, control room supervisors demonstrated an excellent safety focus when they performed an
annunciator-by-annunciator review of the inoperable annunciator windows to identify available
indications to monitor system status.
'
9903300181 990323
ADOCK 05000456
G
\\
'
- - -
n.
M
l
O. Kingsley
-2-
l
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the
enclosure will be placed in the NRC Public Document Room.
Sincerely,
I
/s/ Michael J. Jordan
Michael J. Jordan, Chief
Reactor Projects Branch 3
Docket Nos.: 50-456;50-457
Enclosure:
InspeWn Report 50-456/99002(DRP);
50-4s 39002(DRP)
cc w/ encl:
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Vice President, Regulatory Services
DCD - Licensing
T. Tulon, Site Vice President
K. Schwartz, Station Manager
T. Simpkin, Regulatory Assurance Supervisor
M. Aguilar, Assistant Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
DOCUMENT NAME: G:BRAl\\99002.DRP
To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with
attachment / enclosure "N" = No copy
OFFICE
Rlli
E. Rill -
f Rlli
d
Rlli
l
,
,
NAME
cegf
Q
Gardner W
Clayton #"
Tongue /mt/dp
Jordan
&
Section E2.2
Section M8.4
DATE
03/S/99
03/31/99
03/32/99
03/23/99
OFFICIAL RECORD COPY
p
a . .:
!
O. Kingsley
-3-
l
Distribution:
J. Lieberman, OE w/enci
l
J. Goldberg, OGC w/ encl
~ R. Zimmerman, NRR w/enct
SAR (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/encI
J. Caldwell, Rlll w/enct
SRI Braidwood w/enci
DRP w/ enc!
DRS (2) w/enci
.
Rlli PRR w/enci
'
< = PUBLIC IE-01 w/enci
Docket File w/ encl
GREENS
l
LEO (E-Mail)
l
DOCDESK (E-Mail)
l
l
l
-
30004'-