Forwards Safety Insp Repts 50-456/89-17 & 50-457/89-17 on 890601-20.Violations Noted.Decision Re Enforcement Action Will Be Sent by Separate Correspondence
ML20245H839
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/26/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20245H844 List:
References
NUDOCS 8906300117
Download: ML20245H839 (2)


See also: IR 05000456/1989017

Text

_ _ _ _ _ -_

,

j] l

'

}h. ,[ g t0

kp

'

[

'

JUN 2 61989

lo i

'

>

L Docket No. 50-456-  !

Docket No. 50-457 l

Commonwealth Edison Company

j

"

ATTN:- Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690 j

Gentlemen:

This refers to the special safety inspection conducted by Messrs.

G. A. VanSickle, T. M. Tongue, and T. E. Taylor, of this office from

June 1 through June 20, 1989, of' activities at the Braidwood Station,

Units 1 and 2, authorized by NRC Operating Licenses No. NPF-72 and ,

No. NPF-77, and to the discussion of our findings with Mr. D. E. O'Brien  !

and others of your staff at the ctrclusion of the inspection. 1

-The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

violation of NRC requirements. You will be notified by separate

correspondence of our decision regarding enforcement action based on

the findings of this inspection. No written response is required until

you are notified of the proposed enforcement action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

f 41

$sR6338 hit: $$88$g6

Q

i

,[ .

  • a

. .

.

Commonwealth Edison Company

2 JUN 2 61989

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by.E. G. Greenman

Edward G. Greenman, Director

Division of Reactor Projects i

Enclosure: Inspection Report

No. 50-456/89017 DRP ;

No. 50-457/89017 DRP

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations

T. Kovach, Nuclear

Licensing Manager

S. Hunsader, Nuclear

Licensing Administrator

R. E. Querio, Station Manager

D. E. Cooper, Regulatory

Assurance Supervisor

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC

G. Berry, 0GC i

.

Stephen P. Sands, NRR

bcc, U~ LA-% oc

3 C,adbi

g , cz ,C.

l 7.Parb, Net

b

,

\

EA 89- 151 .[j

64.

RIII RIII RIf'. R(' \

W

l

J

OB \\)) /

f i,\p Y

Calhoun/jp ftHinds Sfiafe . ') ro"b GreenWAn'

06/:3/89 I th3lq ) (;l7f

1