ML20055D134

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/90-14 & 50-457/90-17 on 900618-22.No Violations Noted
ML20055D134
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/28/1990
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20055D135 List:
References
NUDOCS 9007030242
Download: ML20055D134 (2)


See also: IR 05000456/1990014

Text

V

.

.

,

.

\\

<

,

.

1

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, Il

60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. Rolf A. Westberg

of this office on June 18 through 22, 1990, of activities reguarding the

implementation of Generic letter 85-06 relative to ATWS mitigating systems at

Braidwood Nuclear Power Plant, Units 1 and 2, authorized by NRC Operating

License No. NPF-72 and NPF-77 and to the discussion with Mr. R. E. Querio at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

.No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room. We will gladly discuss any questions you have concerning

this inspection.

Sincerely,

Original Signed by Mark A. Ring

M. A. Ring, Chief

Engineering Branch

Enclosures:

1. Inspection Report

No. 50-456/90014;

50-457/90017

h

See Attached Distribution

r

RIII

RIII

R

f

Rill

V

VN-

.

f'"4V

i

Westberg /lc

Gardner

e

ng

'

6/JE/90

6/25/90

6/g/0

7/90

k

Fhk kh,Efn osooo m

j 2 900628

I

1

a

.

..

'

.

w

,

Commonwealth Edison Company

2

Distribution

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations

T. Kovach, Nuclear

Licensing Manager-

S. Hunsader, Nuclear

Licensing Administrator

,

R. E. Querio, Station Manager

i

D. E. Cooper, Regulatory

Assurance Supervisor

DCD/DCB(RIUS)

!

,

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII

Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

,

E. Reis, OGC

4

Stephan P. Sands, NRR

Robert Newmann, Office of Public

Counsel, State of Illinois Center-