j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001 8
July 30, 1999
- * * * *,o Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
GENERIC LETTER 96-05, " PERIODIC VERIFICATION OF DESIGN-BASIS CAPABILITY OF SAFETY-RELATED MOTOR-OPERATED VALVES" BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. M97018 AND M97019)
Dear Mr. Kingsley:
On September 18,1996, the NRC issued Generic Letter (GL) 96-05, " Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," requesting each nuclear power plant licensee to establish a program, or to ensure the effectiveness of its current program, to verify on a periodic basis that safety-related motor-operated valves (MOVs) continue to be capable of performing their safety functions within the current licensing bases of the facility.
On November 13,1996, Commonwealth Edison Company (Comed) submitted a 60-day response to GL 96-05 notifying the NRC that, as requested in the generic letter, it would establish a program at Braidwood Station, Units 1 and 2, to verify on a periodic basis that safety-related MOVs continue to be capable of performing their safety functions within the current licensing bases of the facility. On March 15,1997, Comed submitted a 180-day response to GL 96-05 providing a summary description of the MOV periodic verification program planned to be implemented at Braidwood. Comed provided an updated GL 96-05 submittal on August 24,1998, and on April 12,1999, provided a response to an NRC staff's request of February 4,1999, for additionalinformuon regarding the GL 96-05 program.
We have reviewed Comed's submittals and applicable NRC inspection reports for the MOV f
program at Braidwood. Based on our understanding of Comed's commitment to all three
[
phases of the Joint Owners Group (JOG) Program on MOV Periodic Verification, we have concluded that Comed has established an acceptable program to verify periodically the design-basis capability of the safety-related MOVs at Braidwood. As discussed in the enclosed safety evaluation (SE), we conclude that Comed is adequately addressing the actions requested in GL 96-05. The NRC staff may conduct inspections at Braidwood to verify the implementation of Ok 9
i l
?
000014 Ig g HarrC8 HER C E 4
i l
9908090008 990730 PDR ADOCK 05000456 P
PDR t
I
y Mr. O.' D. Kingsley '
. the MOV periodic verification program is in accordance with the Comed's commitments; the enclosed SE; our SE dated October 30,1997, on the JOG Program on MOV Periodic Verification; and our SE dated April 14,1998, on the Westinghouse Owners' Group methodology for ranking MOVs by their safety significance.
Sincerely, Original Signed By George F. Dick, Jr., Project Manager, Section 2 Project Directorate ill Division of Licensing Project Management i
Office of Nuclear Reactor Regulation j
- Docket Nos. STN 50-456 and STN 50-457
Enclosure:
Safety Evaluation cc w/ encl: See next page '
Distribution:
Docket File PUBLIC.-
1
' PDill/2 r/f OGC,015B18 ACRS, T2E26 M. Jordan, Rlli J
T. Scarbrough l
l 4
DOCUMENT NAME: G:\\PDill-2\\braidwood\\movse97018.wpd To receive a copy of this document. Indicate in the box: "C" = Copy w/o enci "E" = Oopy w/enct "N" = No copy OFFICE PM:LPDW o F
LM3 W
SC:LPD3 NAME GDICK //fA0 CMDC$tE AMENDIOLA DATE 07/44 '/99 '
07/ O /99 07/5 0 /99 OFFICIAL RECORD COPY i
u
O. Kingsley Braidwood Station Common % <h Edison Company Units 1 and 2
{
cc:
Regional Administrator Mr. Ron Stephens U.S. NRC, Region ill I!!inois Emergency Services & Disaster Agency 801 Warrenville Road 110 E. Adams Street Lisle, lilinois 60532-4351 Springfield, Illinois 62706
)
l lilinois Department of Nuclear Safety Chairman Office of Nuclear Facility Safety Will County Board of Supervisors 1035 Outer Park Drive Will County Board Courthouse Springfield, Illinois 62704 Joliet, Illinois 60434 Document Control Desk-Ucensing Attomey General Commonwealth Edison Company 500 5. Second Street 1400 Opus Place, Suite 400 Springfield, Illinois 62701 Downers Grove, Illinois 60515
)
George L. Edgar Ms. C. Sue Hauser, Project Manager Morgan, Lewis and Bochius Westinghouse Electric Corporation 1800 M Street, N.W.
Energy Systems Business Unit Washington, DC 20036 Post Office Box 355 Pittsburgh, Pennsylvania 15230 Commonwealth Edison Company Braidwood Station Manager j
Joseph Gallo RR 1 Box 84 Gallo & Ross Braceville, Illinois 60407-9619 1025 Connecticut Ave., N.W., Suite 1014 Washington, DC 20036 Commonwealth Edison Company Site Vice President - Braidwood Ms. Bridget Little Rorem RR 1, Box 84 Appleseed Coordinator Braceville, Illinois 60407-9619 117 N. Linden Street Essex, Illinois 60935 Mr. David Helwig Senior Vice President Howard A. Leamer Commonwealth Edison Company Environmental Law and Policy Executive Towers West 111 Center of the Midwest 1400 Opus Place, Suite 900 i
35 East Wacker Dr., Suite 1300 Downers Grove, I!!inois 60515 Chicago, Illinois 60601 Mr. Gene H. Stanley U.S. Nuclear Regulatory Commission PWR Vice President Braidwood Resident inspectors Office Commonwealth Edison Company RR 1, Box 79 Executive Towers West 111 Braceville, Illinois 60407 1400 Opus Place, Suite 900 Downers Grove, Illinois 60515 Ms. Lorraine Creek l
- RR 1, Box 182 Manteno, Illinois 60950
O. Kingsley Braidwood Station Commonwealth Edison Company Units 1 and 2 Commonwealth Edison Company Reg. Assurance Supervisor-Braidwood RR 1, Box 84 Braceville, Illinois 60407-9619 Mr. Christopher Crane BWR Vice President Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 900 Downers Grove, Illinois 60515 Mr. R. M. Krich Vice President - Regulatory Services Commonwealth Edison Company Executive Towers West 111 1400 Opus Place, Suite 500 Downers Grove, Illinois 60515 Ms. Pamela B. Stroebel Senior Vice President and General Counsel Commonwealth Edison Company P.O. Box 767 Chicago, Illinois 60690-0767