ML20247E972
| ML20247E972 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 09/07/1989 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20247E976 | List: |
| References | |
| NUDOCS 8909180055 | |
| Download: ML20247E972 (2) | |
See also: IR 05000456/1989021
Text
y
m
--
-
,
,
(
g
>-
.
Fll
l
O y
m e n n rs n ' s m~n * * ' W
? ' ^
-
_ , J a ev o - t i t t U t u510
i M 8
^
SEP 0 71989
-
'
)
Docket'No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: 'Mr. Cordell Reed
Senior Vice President
Post.0ffice Box 767
' Chicago,-IL 60690
-Gentlemen:
'
.
This refers to'the routine safeguards inspection conducted by
Ms. G. M. Christoffer and Mr. T. J. Madeda of this office on July 31 through
August 15, 1989,- of activities.at Braidwood Nuclear Power Station, Units-1
-
and 2,. authorized by NRC Operating Licenses No.NPF-72 and No. NPF-77, and
, to the discussion of our. findings with.Mr. Quer.io at the conclusion of the.
- inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection co'nsisted of a selective
examination of procedures'.and' representative records,-observations, and
interviews with. personnel.
During this inspection, certain of your activities appeared to be in violation
of NRCLrequirements,-as described in the enclosed Notice. With respect to
Item 1, the inspection showed that actions had been taken to correct the
-identified violation and to prevent recurrence.
Our understanding of your
' corrective ~ actions is described in Paragraph 4.a of the enclosed inspection
report. . Consequently, no reply to the violation is required and we have no
further questions regarding this matter at this time.
Regarding the remaining
items a written response is required. We have reviewed your staffs comments
' that were presented at the exit interview concerning your position that
Violation No. 2 did not represent a violation.
Based on our review of this
matter, which included consultation with our Headquarters staff, we confirmed
our original. conclusion that your access control practice was in violation of
the cited section of your NRC approved security plan.
l
.
.
Areas examined dur.ing this inspection concern a subject matter which is
exempt from disclosure according to Part 73, Title 10,. Code of Federal
'
Regulations, Section 73.21(c)(2). This information must be handled and
L
protected in accordance with the provisions of 10 CFR 73.21.
Consequently,
the enclosure to this' letter, our report of the inspection, and your response
to the violation (s) identified in the enclosure to this letter will not
be placed in the NRC Public Document Room.
Therefore, your statement of
$6Dt
\\\\
Enclosure Contains
S/JEOUARDS IliFORh'ATI0h
.,n-n nnnn-tnt
_
Upon Separation This
O h.
p.n ,,, n n n
L.u V nt\\ U d 18 4 6 U l hVlO l IV lt
Page Is Decontrolled
v, 5
,
8909180055 890907
l
PDFi
ADOCK 05000456
L GI
.
_ _ _ _ .
. _ _ _ - _ _ - _ ,
.-
.
~
'
b,
jhE[
' \\ 07 V A" M
Commonwealth Edison Company
2
SEP 0 71989
corrective action regarding the violation (s) identified in the enclosure
should be submitted as a separate enclosure to your transmittal letter in
the manner prescribed.
We will gladly discuss any questions you have concerning this inspection..
Sincerely,
l
aqw
L. Robert Greger, Chief
Reactor Programs Branch
Enclosure:
Inspection Reports
No. 50-456/89021(DRSS);
No. 50-457/89021(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosure:
T. J. Maiman, Vice President,
PWR Operations
T. Kovach, Nuclear
Licensing Manager
S. Hunsader, Nuclear
Licensing Administrator
R. E. Querio, Station Manager
D. E. Cooper, Regulatory
Assurance Supervisor
J. Lieberman, OE
.
NRR/DRIS/SGB
l
NRR/DRIS/ SIB
NRR/DLPQ/PEB
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
1
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr., Esq.
Enclosure contains
Richard Hubbard
SAFEGUARDS INFORMATION
J. W. McCaffrey, Chief, Public
Upon separation This
Utilities Division
Face Is DecontroIIod
H. S. Taylor, Quality Assurance
Division
i
E. Chan, OGC
l
G. Berry 0GC
nn--m...-m,
, , . _ _
Stephen P. Sands, NRR
e n _ u ll,s,p,;j g g gg jyg
,
.
-
(
RII
RIII
RIII
RIII
i
h
J,Y#ih
-
]
gh
o fer/sm
Ma ed
9
mm
-