ML20207B636

From kanterella
Jump to navigation Jump to search

Forwards SE Accepting Revised SG Tube Rupture (SGTR) Analysis for Bryon & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station
ML20207B636
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 05/25/1999
From: Stewart Bailey
NRC (Affiliation Not Assigned)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20207B640 List:
References
TAC-M97316, TAC-M97318, TAC-MA97316, TAC-MA97318, NUDOCS 9906020050
Download: ML20207B636 (3)


Text

'. ]

i

. May 25, 1999

- Mr. Oliver D. Kingsley, President -

Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 '

Downers Grove, IL 60515

SUBJECT:

- REVISED STEAM GENERATOR TUBE RUPTURE ANALYSIS FOR BYRON, UNIT 2, AND BRAIDWOOD, UNIT 2 (TAC NOS. M97316 AND M97318)

Dear Mr. Kingsley:

By letter dated November 13,1996,' Commonwealth Edison Company (Comed, the licensee) submitted a revised steam generator tube rupture (SGTR) analysis for Byron and Braidwood Stations. The revised analysis was submitted to support steam generator replacement at Unit 1 of each station. The SGTR analysis was also revised for Unit 2 of each station because Comed proposed to change operator actions used to mitigate the consequences of the event.

Comed provided add. anal information by letters dated March 20, June 24, August 19, November 3, November 26 and December 19,1997; April 13 and June 10,' 1998, and April 20, 1999. The staff approved the analysis for Unit 1 of each station by letter dated January 28, 1998, as supplemented by letter dated March 11,1998.

The staff has completed its evaluation of the potential radiological doses associated with a SGTR at Byron, Unit 2, and Braidwood, Unit 2. The licensee had postulated that a steam generator tube rupture accident occurred coincident with a loss of offsite power. Two cases

. were considered. One case assumed that the accident induced an iodine spike, referred to as the accident-initiated spike case The second case assumed that prior to the steam generator .

tube rupture occurring, an iodine spike had occurred, referred to as a pre-existing spike case.

For the above two cases, the staff confirmed the licensee's conclusions that the dose guidelines  ;

of 10 CFR Part 100 and 10 CFR Part 50, Appendix A, General Design Criterion 19 would be met. The staff's safety evaluation is enclosed.

Sincerely, Original signed by Stewart N. Bailey, Project Manager, Section 2 9906020050 990525 Project Direc,. orate til DR ADOCK 0500 5 Division of Licensing Project Management p i a Office of Nuclear Reactor Regulation O\ )

Docket Nos. STN 50-455, STN 50-457 Distribution: -Oceket Pileb PUBLIC M. Jordan, Rill  !

Enclosure:

Safety Evaluation PDill r/f J. Hayes  !

ACRS, T2E26 OGC,015B18 cc w/ encl: See next page R. Norsworthy (SE)

DOCUMENT NAME: A:\SE97316.WPD

  • concurrence provided by SE; no major revisions j To receive a copy of this document, Indicate # the bos: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE PM:LPD3 C ljAMD3 E PM:LPD3 _

E SC:PSAB 6 SC:LPJi/ O- j NAME SBAILEY J didODRE JHICKMAC/)tW FMREINHART* AM2NDidLA 7

DATE 05/M /99 05/W /99 05/ 2C/99 05/07/99 05/ W/99 OFFICIAL RECORD COPY V j

c O. Kingsley Byron /Braidwood Stations .

Commonwealth Edison Company cc:

Ms. C. Sue Hauser, Project Manager George L. Edgar Westinghouse Electric Corporation Morgan, Lewis and Bochius Energy Systems Business Unit 1800 M Street, N.W.

Post Office Box 355 Washington, DC 20036 Pittsburgh, Pennsylvania 15230 Attomey General Joseph Gallo 500 S. Second Street Gallo & Ross Springfield, Illinois 62701 1025 Connecticut Ave., N.W., Suite 1014 Washington, DC 20036 lilinois Department of Nuclear Safety Office of Nuclear Facility Safety Michael 1. Miller, Esquire 1035 Outer Park Drive Sidley and Austin Springfield, Illinois 62704 One First National Plaza Chicago, Illinois 60603 Commonwealth Edison Company Byron Station Manager Howard A. Leamer 4450 N. German Church Road Environmentallaw and Policy Byron, Illinois 61010-9794 Center of the Midwest l 35 East Wacker Dr., Suite 1300 Commonwealth Edison Company Chicago, Illinois 60601 Site Vice President- Byron 4450 N. German Church Read U.S. Nuclear Regulatory Commission Byron, Illinois 61010-9794 Dyron Resident inspectors Office 4448 N. German Church Road U.S. Nuclear Regulatory Commission Byron, Illinois 61010-9750 Braidwood Resident inspectors Office

. RR 1, Box 79 Regional Administrator, Region ill Bra eville, Illinois 60407 U.S. Nuclear Regulatory Commission 801 Warrenville Road Mr. Ron Stephens Lisle, Illinois 60532-4351 lilinois Emergency Services and Disaster Agency Ms. Lorraine Creek 110 E. Adams Street RR 1, Box 182 Springfield, Illinois 62706 Manteno, Illinois 60950 Chairman Chairman, Ogle County Board Will County Board of Supervisors Post Office Box 357 Will County Board Courthouse 4 Oregon, Illinois 61061 Joliet, Illinois 60434 Mrs. Phillip B. Johnson Commonwealth Edison Company 1907 Stratford Lane Braidwood Statior Manager  !

~ Rockford, Illinois 61107 RR 1, Box S4 Braceville, Illinois 60407 i

l l

v;

.s s.

O. Kingsley Byron /Braidwood Stations .

Commonwealth Edison Company Ms. Bridget Little Rorem Ms. Irene Johnson, Licensing Director Applessed Coordinator Nuclear Regulatory Services 117 N. Linden Street Commonwealth Edison Company Essex, Illinois 60935 Executive Towers West lli l 1400 Opus Place, Suite 500 Document Control Desk-Licensing Downers Grove,IL 60515

(.

Commor wealth Edison Company 1400 Opus Place, Suite 400 Commonwealth Edis on Company l Downers Grove, Illinois 60515 Reg. Assurance Supervisor- Braidwood

RR 1, Box 79 l Commonwealth Edison Company Braceville, Illinois 60407

, Site Vice President- Braidwood

! RR 1, Box 84 Commonwealth Edison Company Braceville,IL 60407 Reg. Assurance Supervisor- Byron i . 4450 N. German Church Road l Mr. David Helwig Byron, Illinois 61010-9794

! SeniorVice President Commonwealth Edison Company Mr. Michael J. Wallace Executive Towers West lll Senior Vice President 1400 Opus Place, Suite 900 Commonwealth Edison Company Downers Grove, IL 60515 Executive Towers West lil 1400 Opus Place, Suite 900 Mr. Gene H. Stanley Downers Grove,IL 60515 PWR's Vice President Commonwealth Edison Company

! Executive Towers West lll 1400 Opus Place, Suite 900 l Downers Grove, IL 60515 i

Mr. Steve Perry -

BWR's Vice President Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 900 Downers Grove,IL 60515 Mr. Dennis Ferrar Regulatory Services Manager Com.nonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515 L

f 1