May 20, 1999
EA 99-106 -
Mr. Oliver D. Kingsley .
President, Nuclear Generat!on Group
Commonwealth Edison Company
ATTN: Regulatory Services-
Executive Towers West lil
1400 Opus Place, Suite 500 -
Downers Grove, IL 60515
SUBJECT:
NRC INSPECTION REPORT _50-456/99005(DRS); 50-457/99005(DRS)
' Dear Mr. Kingsley:
On April 23,1999, the NRC completed an engineering and corrective action' inspection at your
_
Braidwood Units 1 and 2 reactor facilities. The enclosed report presents the results of that
L inspection.
> Areas examined during the inspection are identified in the report. The inspection included an
assessment and evaluation of engineering support, design change and modifica'.,on activities
including 10 CFR 50.59 evaluations and screenings, corrective action and intrmal assessment
.
activities. Within these areas, we selectively observed activities in progress, reviewed
procedures and representative records, observed plant conditions, and discussed activities and
concems with members of your staff.
,
Overall, our inspection results indicated that the engineering program was effective.
. Modifications effectively resolved problems and post-modification testing ensured system
operability. - Controls over temporary modifications were strong and appropriate. Evaluations
done in accordance with 10 CFR 50.59 were thorough and operability determinations reviewed
were of good quality. The problem resolution portion of the corrective action program was
i
considered a strength, with thorough and effective root causes preventing recurrence of
j
. problems. Self-assessments were good and the continuous assessment process appeared
Lf
thorough.
Based on the results of this inspection, the NRC has determined that two violations of NRC
requirements occurred.L These violations are not being cited, consistent with Appendix C of the
Enforcement Policy. The violations are described in the subject inspection report. If you contest
- either the severity level or the violation itself, you should provide a response within 30 days of
the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory
Commission,' ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the
~ Regional Administrator, Region lil, and the Director, Office of Enforcement, United States
. Nuclear Regulatory Commission, Washington, DC 20555-0001.
_
9905270063 990520
'
ADOCK 05000456
k
j
m
Y
-
,
,
..
O. Kingsley
-2-
Distribution:
.
D. Dambly, OGC w/enci
J. Lieberman, OE w/enci
B. Boger, NRR w/ enc!
SAR (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/enci
B. Clayton, Rill w/enct
SRI Braidwood w/enci
DRP w/ encl
DRS w/ encl
Rlli PRR w/enct
PUBLIC IE-01 w/ encl
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
2 l' ('; !\\ i;
i
e
..
O. Kingsley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
Original /s/ J. M. Jacobson
John M. Jacobson, Chief
Mechanical Engineering Branch
Docket Nos. 50-456; 50-457
Enclosure:
Inspection Report 50-456/99005(DRS);
50-457/99005(DRS)
cc w/ encl:
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Kiich, Vice President, Regulatory Services
DCD Licensing
T. Tulco, Site Vice President
K. Schwcrtz, Station Manager
T. Simpkin, Regulatory Assurance Supervisor
M. Aguilar, Assistant Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
DOCUMENT NAME: G:DRS\\ BRA 99005.WPD
v.
.~....
..e
< w.
w.:c.cm.w.n.c-vonew. r.cm ..n..
,u.nce.
r.
em
h@
l
OFFICE
Rill 6
lh
Rlli
..lE
Rlli
I
NAME
Plougheed:sd
MJordan 9fl4
JJacob @ \\
DATE
05/fi/99
05&'a'99
05h*/99(M
OFFICIAL RECORD COPYU
,
l
l