Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Understands That Westinghouse Will Provide Util W/Generic Bounding Analysis Re Seismic Loadings
ML20247C152
Person / Time
Site: Byron, Braidwood, Zion, 05000000
Issue date: 05/18/1989
From: Olshan L
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
References
IEB-88-011, IEB-88-11, TAC-72114, TAC-72115, TAC-72116, TAC-72117, TAC-72186, TAC-72187, NUDOCS 8905240356
Download: ML20247C152 (6)


Text

-_

(

UNITED' STATES L[E t

- NUCLEAR REGULATORY COMMISSION

!j WASHINGTON, D. C,20555

,/

May 18, 1989 Docket Nos.:. 50-295,50-304,50-454/455, 50-456 and 457-i Mr. Thomas J. Kovach Director of Nuclear Licensing Cose,onwealth Edison Company Post Office. Box 767 Chicago, Illinois 60690

Dear Mr. Kovach:

SUBJECT:

SCHEDULAR RELIEF REQUEST RELATED TO NRC BULLETIN 88-11,

" PRESSURIZER SURGE LINE THERMAL STRATIFICATION," ITEM 1.b (TAC NOS. 72186,72187,72116,72117,72114AND72115) l The purpose of this letter is to inform you of the implementation schedule for Item 1.b of NRC Bulletin 88-11', " Pressurizer Surge Line Thermal Stratification" that was mutually agreea upon between the NRC staf f and the Westinghouse OwnersGroup(WOG)duringanApril 11, 1989 meeting.

By' letter dated March 7,1989, you proposed an alternate schedule for the corrpletion of the bounding analysis required by Item 1.b of NRC Bulletin 88-11 regarding the design adequacy of.the pressurizer surge line, taking into account the effects of thermal stratification. Your proposed schedule for completionof' Item 1.b[(twoyearsfromthecateoftheBulletin)]was consistent with the alternate schedule proposed by the the Westinghouse Owners Group (WOG) program.

During the April 11, 1989 meeting between the staff and the WOG, the staff expressed that the alternate schedule as originally proposed by the WOG was unacceptable. Based upon additional discussion, the WOG agreed to notify its membership that licensees of plants in operation over 10 years should, by the end of May 1989, complete and have available for NRC audit, their bounding analysis as related to Item 1.b of the Bulletin, and submit to the NRC a Justification for Continued Operation (JCO) in the event the results of the beunding analysis do not confirm the adequacy of the pressurizer surge lina for the design life of the plant. Licensees of plants in operation less than 10 years would be no*ified that they were required to complete the required actions of Item 1.b within the originally stated period.(one year from receipt oftheBulletin). The staff found these proposals to be acceptable.

It is our understanding that the WOG will. provide you with a " generic" bounding analysis, to which your plant specific variables (e.g., seismic and thermal loadings) will need to be added and incorporated.

Your analysis should assess all aspects of thermal stratification and thermal striping, including bounding evaluations on stresses and fatigue, based on currently available information.

f 8905240356 890518

[b PDR ADOCK 05000295 It Q

PDC I l p

Mr. Thomas J. Kovach,

Based upon your participation in the WOG program regarding this issue, and absent any other justification, your proposed s1 ternate schedule of completing Item 1.b is not approved.

It is our expectation that your efforts will be accelerated to meet the completion date(s) as committed by the.WOG.

Sincerely, M

Leonard N. Olshan, Project Manager Project Directorate III-2 Division of Reactor Projects III, IV, V, and Special Projects cc: See next page 1

i e

m_

y

- Mr. Thomas J. Kovach Byron /Braidwood Power Station Connonwealth Edison Company Units 1 and 2 CC:

Mr. Jack Tain Dr. Bruce von Zellen 3

Atomic Power Distribution Department of Biological Sciences Westinghouse Electric Corporation Northern Illinois University Post Office Box 355 DeKalb, Illinois 61107 Pittsburgh, Pennsylvania 15230 U. S. Nuclear Regulatory Commission Joseph Gallo, Esq.

Byron / Resident Insoectors Office Hopkins and Sutter 4448 North Germat. onurch Road 1050' Connecticut Ave., N.W.

Byron, Illinois 61010 i

Suite 1250 Washington, D.C. 20036 Ms. Lorraine Creek Rt. 1, Box 182,

C. Allen Bock, Esquire Manteno, Illinois 60950 Post Office Box 342

'. Urbana, Illinois 61801 Mrs. Phillip B. Johnson 1907 Stratford Lane Regional Administrator Rockford, Illinois 61107 U. S. NRC. Region III

'799 Roosevelt Road,. Bldg. #4 Douglass Cassel, Esq.

Glen Ellyn, Illinois 60137 109 N. Dearborn Street Suite 1300 Ms. Bridget Little Rorem Chicago, Illinois 60602 Appleseed Coordinator 117 North Linden Street Ms. Pat Morrison Essex, Illinois 60935 913 N Main. Street #707 Rockford, Illinois 61103-7058 Mr. Edward R. Crass Nuclear Safeguards and Licensing David C. Thomas, Esq.

Division 77 S. Wacker Drive Sargent & Lundy Engineers Chicago, Illinois 60601 55 East Monroe Street Chicago, Illinois 60603 Mr. Charles D. Jones, Director Illinois Emergency Services U. S. Nuclear Regulatory Commission and Disaster Agency Resident Inspectors Office 110 East Adams Street RRil, Box 79 Springfield, Illinois 62706 Braceville, Illinois 60407

____m__.______________________._______.___.___.____.________._._._.m_.

Mr. Thomas J. Kovach Byron /Braidwood

,I "

Commonwealth Edison Company L

cc:

l Mr. Michael C. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety-1035 Outer Park Drive Springfield, Illinois 62704 Michael Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60603

' George L. Edgar

~

Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, D.C. 20036 Commonwealth Edison Company Byron Station Manager 4450 North German Church Road

' Byron, Illinois 61010

I

, o l

1 Mr. Thomas J. Kovach Zion Nuclear Power Station

{

Commonwealth Edison Company Units 1 and 2

)

cc:

Robert J. Vollen, Esquire' Mr. Michael C. Parker, Chief 109 North Dearborn Street Division of Engineering Chicago, Illinois 60602 Illinois Department of Nuclear Safety Dr. Cecil Lue-Hing 1035 Outer Park Drive, 5th Floor Director of Research and Development Springfield, Illinois 62704 Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Phillip Steptoe, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60603-Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 U.S. Nuclear Regulatory Comission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137

.--_.--_-__.-__-.--c

May 18 1989 0

Mr. Thomas J. Kovach Based upon your participation in the WOG program regarding this issue, and absent any other justification, your proposed alternate schedule of completing Item 1.b is not approved.

It is our expectation that your efforts will be accelerated to meet the completion date(s) as committed by the WOG.

Sincerely, Leonard N. 01shan, Project Manager Project Directorate III-2 Division of Reactor Projects III, IV, V, and Special Projects cc: See next page DISTRIBUTION Docket file NRC & Local PDRs PDIII-2 r/f GHolahan NVirgilio LLuther L01shan CPatel SSands OGC EJordan BGrimes ACRS(10)