Forwards Insp Rept 50-456/90-20 on 901004-06.No Violation Noted.Nrc Plans to Meet W/Licensee to Discuss Corrective Actions.Licensee Should Prepare to Discuss Act of Conducting Multiple Surveillances on Sys W/High/Low Pressure Interface
ML20058B953
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 10/23/1990
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20058B955 List:
References
NUDOCS 9010310108
Download: ML20058B953 (3)


See also: IR 05000456/1990020

Text

.

-

-

p* Cf og

tjMTED STATES

4

-

,

hV

'

fI

k,

NUCLEAR REGULATORY COMMISSION.

/~

_,

l

y

g

REGION til

-

]-

g

j

too noostvett no Ao

,.

k

6,

GLEN ELLYN. ILUNOIS 60M7

%

/

OCT 2 31990

.;

i

Docket No. 50-456

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

.

'

Senior Vice President

!

1400 Opus Place

l

Downers Grove, IL 60515

!l

Gentlemen:

l

This refers to the special onsite review conducted by the NRC Augmented

Inspection Team composed of Messrs. W. D. Shafer, W. J. Kropp, S. G. DuPont,

and J. A. Hopkins of this of fice, Mr. S. .P. Sands, and S. Diab of the Of fice

l

of Nuclear Reactor Regulation (NRR), E. A. Trager, Jr., Office for Analysis

_

,

and Evaluation of Operational Data (AEOD) and J. L. Harbour, of Idaho National

Engineering Laboratory (INEL) on Octvber 4-6, 1990, of activities associated

3

with the October 4, 1990, loss of-reactor coolant' system inventory event at

'

the Braidwood Station, Unit 1, Operating License No. NPF-72, and to. the-

'

discussion of our findings with Messrs. Kr L. Graesser, K. L. Kofron, and

others of your staff at the conclusion of the inspection,

j

The enclosed copy of our Augmented Inspection Team report identifies areas

3

examined during the inspection. Within these areas, the inspection consisted

i

of a selective examination of procedures and representative records,

,

observations, and interviews with personnel,

j

.

No violations of NRC requirements.were identified during the course of this

j

inspection; however, the major purpose of~the AIT was to perform onsite fact

finding regarding the event.

Issues identified by the AIT may be examined for

possible regulatory violations in subsequent inspections. We are, however,

concerned with the lack of command and control demonstrated by the operating

crew during the March 18, 1990, loss of inventory event.and again during the

October 4, 1990, event. The corrective actions implemented as a result of the

first event were apparently not sufficient to= prevent a similar. occurrence.

-

In this regard, we plan to meet with you to discuss the corrective actions

you have or will implement as a result of the concerns identified (Section

i

VII of the enclosed report) during the AIT 1nvestigation and the results of

your own investigation. We will contact you to schedule.this meeeting once we

have received the results of your investigation and conclusions.

f

The AIT also concluded that while the October 4,1990 loss of inventory event

~

was not an intersystem loss of coolant accident (ISLOCA), the act of

conducting multiple surveillances on systems with a low /high pressure,

5

interface, coupled with the loss of command and control by the Operations

Department, is considered a precursor to an ISLOCA. We request that you-be

prepared to discuss this matter in our forthcoming meeting.

9010310108 901023

PDR

ADOCK 05000456

M

f

G

PNV

/U\\

' ]&

.

- - - - - - - - .

-

.

4

%

Commonwealth Edison Company-

2

OCT 2 31990

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Wau . L.^b

Edward G Greenman,. Dire 9c

. Division of. Reactor Projects

Enclosure: Augmented Inspection

Team Report No. 50-456/90-020(DRP)

See Attached Distribution

-,

}

l

8

P

P

k

.

i

Y

.

%

4

Distribution

cc w/ enclosures:

i

'

M. Wallace, Vice President,

PWR Operations

T. Kovach, Nuclear

Licensing Manager

A. Checca, Nuclear

'l

Licensing Administrator

i

K. L. Kofron, Station Manager

!

D. J. Miller, Regulatory

'

Assurance Supervisor

DCD/DCB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Resident Inspector, RIII Zion

R. Newman, Office of Public Counsel,

State of Illinois Center

Richard Hubbard

i

J. W. McCaffrey, Chief, Public

Utilities Division

j

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

S. P. Sands, NRR

F. Miraglia, NRR

D. Crutchfield, NRR

,

J. Zwr,iinski, NRR

R. Br.rrett, NRR

W. Fodges, NRR

C. Rossi, NRR

W. Lanning, NRR

A. Chaffee, NRR

E. Jordan, AE00

W. Hehl, RI

L. Reyes, RII

J. Callen, RIV

R. Zimmerman, RV

J. Clifford, EDO

!