Forwards Enforcement Conference Repts 50-456/89-20 & 50-457/89-20 on 890711 & Notice of Violation.Plant May Be Subj to Escalated Enforcement Action Upon Discovery of Addl Valve Mispositioning Affecting ECCS Operability
ML20247A234
Person / Time
Site: Braidwood  
Issue date: 07/17/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20247A238 List:
References
NUDOCS 8907210185
Download: ML20247A234 (2)


See also: IR 05000456/1989020

Text

e

400

.

.

.

i

.

.

.d-

s y

JUL 17 1989

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Conpany

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

l

This refers to the inspection conducted from June 1 through 20, 1989, at the

The Inspection concerned an event (ori

l

Braidwood Station.

50-456/89017(DRP);50-457/89017(DRP))ginallydiscussed

'

in Inspection Report

in which emergency

core cooling system (ECCS) operability was affected by a mispositioned-

isolation valve. Details of the event, as well-as details of two previous

events involving mispositioned ECCS valves, were discussed during an

enforcement conference held in the NRC Region III office in Glen Ellyn,

,

l

Illinois on July 11, 1989. The enclosed copy of our report identifies areas

discussed during the meeting.

I

As discursed during the enforcement conference, although the events involved

'

oifferent circumstances, we are concerned with the effectiveness of the

controls you presently have in place to ensure the continuous operability

of all ECCS equipment. We understand you are presently reviewing these

controls and request that you discuss any changes you have made or plan to

l

make to your program in your response to this violation.

,

l

Based on the information obtained during the inspection and provided at the

i

enforcement conference, we have concluded that the safety significance of the

most recent valve mispositioning event, even when considered in conjunction-

with the two previous events, does not warrant escalated enforcement' action.

However, Braidwood may be subject to escalated enforcement upon discovery

of additional valve mispositioning which affects ECCS operability.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

. Title 10, Code of Federal Regulations, a copy of this letter and-its

enclosures will be placed in the NRC Public Document Room.

- 0\\

-Q

i\\i

.

Q

_ _ _ _ - _ _

_ _ _ - -

.

.

,

..

.'

'

Commonwealth Edison Company

2

g 171999

'

-

The response directed by the. enclosed, Notice.is not subject-to the clearance

procedures of the Office'of Management and Budget as required by the Paperwork

Reduction Act of 1980,. Pub.

L., No.96-511.

l

-Sincerely,

l

l

1

!

Edwar G . Green-

1 ct

i

,

l

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection Rer' ort

No.50-456/L9020(DRP);

No. 50-457/89020(DRP)

3.

CECO Presentation for

Enforcement Conference,

July 11, 1989

i

cc w/caclosures:

l

T. J. Maiman, Vice President,

i

PWR Operations

T. Kovach, Nuclear

Licensing Manager

!

S. Hunsader, Nuclear

I

Licensing Administrator

J

R. E. Querio, Station Manager

D. E. Cooper, Regulatory

Assurance Su

DCD/DCB (RIDS)pervisor

Licensing Fee Management Branch

)

Resident Inspector, RIII

i

Braidwood

l

Resident Inspector, RIII Byron

'

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC

G. Berry, DGC

Stephen P. Sands, NRR

W

v'

e

,

[s.,@RIII

-

RIII

RIII

R

I

!

.

7

8

WM

houn/jp

in s

Ier

'T

pGreenman

07/t4/89

,fg/gg

7/f ,

V

_ _ _ - - - _ - - _ - - - - - _ _ - - - _ - - - -


- - - - -

J