Forwards Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.Configuration Control Error Resulted in Isolation of Unit 1 Emergency Boration Flow Path Through Designated Boric Acid Pump for Period of 3 H Occurred
ML20206Q532
Person / Time
Site: Braidwood  
Issue date: 05/11/1999
From: Jordan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20206Q538 List:
References
50-456-99-06, 50-456-99-6, 50-457-99-06, 50-457-99-6, NUDOCS 9905190157
Download: ML20206Q532 (2)


See also: IR 05000456/1999006

Text

lS

Paf>E

-

May 11, 1999

Mr. Oliver D. Kingsley

'

President, Nuclear Generation Group

Commonwealth Edison Company

j

ATTN: Regulatory Services

Executive Towers West lil

1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT:

BRAIDWOOD INSPECTION REPORT 50456/99006(DRP); 50-457/99006(DRP)

Dear Mr. Kingsley:

On April 13,1999, the NRC completed an inspection at your Braidwood Units 1 and 2 reactor

facilities. The enclosed report presents the results of that inspection. During the 6-week period

covered by this inspection, your conduct of activities was generally characterized by safety-

conscious operations, sound maintenance practices, and careful radiological work controls.

However, there was a configuration control error that resulted in the isolation of the Unit 1

!

emergency boration flow path through the designated boric acid pump for a period of about

three hours. This error revealed that the procedure for adding boric acid to the Unit 2 boric acid

storage tank was inadequate for the circumstances and resulted in a Non-Cited Violation.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

'

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ M. J. Jordan

N

Michael J. Jordan, Chief

Reactor Projects Branch 3

Docket Nos. 50-456; 50-457

'

License Nos. NPF-72; NPF-77

Enclosure:

Inspection Report 50-456/99006(DRP);

50-457/99006(DRP)

/e O[

l

See Attached Distribution

DOCUMENT NAME: G:\\BRAl\\99006.DRP

To receive a copy of this document, Indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"a No copy

OFFICE

Rlli

E

Rll!

l

y

NAME-

Tongue /djMC

Jordan WB /

DATE

05/// /99

05/l/99 7/

^iGnnan

OFFICIAL RECORD COPY

9905190157 990511

PDR

ADOCK 05000456

G

PDR

2

,

ty

'

,

O. Kingsley

-2-

cc w/ encl:

D. Helwig, Senior Vice President

H. Stanley, PWR Vice President

C. Crane, BWR Vice President

R. Krich, Vice President, Regulatory Services

DCD - Licensing

T. Tulon, Site Vice President

K. Schwartz, Station Manager

T. Simpkin, Regulatory Assurance Supervisor

R. Hubbard, MHB Technical Associates

M. Aguilar, Assistant Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

SAR (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Dyer, Rlli w/ encl

B. Clayton, Rlll w/enci

SRI Braidwood w/encI

DRP w/enct

TSS w/enci

DRS (2) w/enci

Rill PRR w/enct

PUBLIC IE-01 w/ enc!

Docket File w/ encl

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

{.