Forwards Insp Repts 50-456/89-14 & 50-457/89-14 on 890425-28.No Violations or Deviations Noted.Ltr,Documenting Actions in Response to Inattentiveness Incidents,Requested within 60 Days of Ltr Receipt
ML20247P045
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/26/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20247P050 List:
References
NUDOCS 8906060093
Download: ML20247P045 (3)


See also: IR 05000456/1989014

Text

__ _

',

hlO

p 'g *-

.

MAY 2 6 1993

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

e Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special onsite review conducted by the NRC Augmented

Inspection Team (AIT) composed of E. McKenna, G. VanSickle and M. Kunowski

of this office, S. Sands of the Office of Nuclear Reactor Regulation and an

NRC Consultant, S. Nealey, on April 25-28, 1989, of activities associated

with events at Braidwood Station Units 1 and 2, authorized by Operating

License Nos. NPF-72 and NPF-77 and to the discussion of our findings with

Mr. D. O'Brien at the conclusion of the inspection.

The enclosed copy of the AIT report identifies areas examined during the

inspection. kithin these areas, the inspection consisted of a selective

examination of procedures and records, observations, and interviews with

personnel.

No violations or deviations were identified. Reconunendations developed by

the team as a result of this inspection are included in the enclosure for

your consideration. A letter documenting your actions in response to the

inattentiveness incidents is requested within 60 days of receipt of this

letter.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosure will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by E. G. Greenman

g 60g g y[gy@g56 Edward G. Greenman, Director

g PDC Division of Reactor Projects

{gg

Enclosure: Augmented Inspection

Team Report No. 50-456/89014(DRP); k

No. 50-457/89014(DRP) \

See Attached Distribution a

f

'

RIII NRR RIII RIII RIII R

q (% _%

-(

grn jp Sand Hinds Greger McKenna Gre ni n

_-_

,:-

,.

,,.v'

.

MAY 2 61999

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special onsite review conducted by the NRC Augmented

Inspection Team (AIT) composed of E. McKenna, G. VanSickle and M. Kunowski

of this office, S. Sands of the Office of Nuclear Reactor Regulation and an

NRC Consultant, S. Nealey, on April 25-28, 1989, of activities associated

with events at Braidwood Station Units 1 and 2, authorized by Operating

License Nos. NPF-72 and NPF-77 and to the discussion of our findings with

Mr. D. O'Brien at the conclusion of the inspection.

The enclosed copy of the AIT report identifies areas examined during the

inspection. Within these areas, the inspection consisted of a selective

examination of procedures and records, observations, and interviews with

personnel.

No violations or deviations were identified. Recommendations resulting

from this inspecticn are included in the enclosure for your consideration.

A written response documenting your proposed actions from these events is

requested within 60 days of receipt of this letter.

In accordaace with 10 CFR 2.790 of the Commission's regulations, a copy of

this let'er and the enclosure will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely.

Original signed by E. G. Greenaan

Edward G. Greenman, Director

Division of Reactor Projects

Enclosure: Augmented Inspection

Team Report No. 50-456/89014(DRP);

No. 50-457/89014(DRP)

S

3 e Attached Distribution t A9

RIII NNy .

QJ, R III RIII

Fornev/jp

IO

a ds

5

Hi s Gr er McKen Greenman

Nll ' ' 5ff b/l? 9

- - _ - _ -

..:- ..

'*

,.

,; . *

Commonwealth Edison Company 2

W26g

Distribution

cc w/ enclosure:

T.'J. Maiman, Vice President,

PWR Operations

T. Kovach, Nuclear  :

Licensing Manager  !

S. Hunsader, Nuclear i

p Licensing Administrator '

R. E. Querio Station Manager

D. E. Cooper, Regulatory

Assurance Su

DCD/DCB (RIDS)pervisor

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

. D. W. Cassel , Jr. , Esq.

.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC-

G. Berry, 0GC 1

S. P. Sands, NRR

F. Miraglia, NRR l

G. Holahan, NRR

M. Virgilio, NRR

D. Muller, NRR .

'

J. Roe, NRR

C. E. Rossi, NRR

W.-Lanning, NRR 1

E. Jordan, AE0D

W. Kane, RI  :

L. Reyes, RII

J. Callan, RIV ,

R. Zimmerman, RV l

-