ML20217G979
| ML20217G979 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/14/1999 |
| From: | Anthony Mendiola NRC (Affiliation Not Assigned) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20217G984 | List: |
| References | |
| TAC-MA1354, TAC-MA1355, NUDOCS 9910220033 | |
| Download: ML20217G979 (3) | |
Text
7 M ctober 14, 1999 Mr. Oliver D. Kingsley, President i
Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove, IL' 60515
SUBJECT:
EVALUATION OF RELIEF REQUESTS RELATED TO REVISION 5 OF THE FIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM FOR BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. MA1354 AND MA1355)
Dear Mr. KingMey:
By letter dated March 5,1998, Commonwealth Edison Company (Comed) submitted Revision 5 to the first 10-year interval inservice inspection (ISI) program plan for Braidwood Station, Units J
1 and 2. The submittalincluded four relief requests not reviewed previously by the NRC.
Three relief requests (NR-35, NR-36 and NR-37) apply to Unit 2 only. Relief Request NR-38 was requested for both units.
The staff, with the assistance from its contractor, Idaho National Engineering and Environmental Laboratory (INEEL) has reviewed and evaluated the information provided by Comed related to the relief requests. The str ~ adopts the evaluation and conclusions contained in the technical letter report (TLR) prepared by INEEL. The enclosed safety evaluation incorporates the TLR.
Relief is granted for NR-35, NR-37, and NR-38 pursuant to 10 CFR 50.55a(g)(6)(i) on the basis of the impracticality of performing the required inspections and the burden on Comed if the g
American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) requirements were imposed. The alternative proposed in relief request NR-36 is authorized pursuant to 10 CFR 50.55a(g)(ii)(A)(5) and 10 CFR 50.55a(3)(i) on the basis that it provides an acceptable level of quality and safety Sincerely, Original Signed By p(".hh hony J. Mendiola, Chief, Section 2 g
pg W
Project Directorate 111 Q
9910220033 991014 Division of Licensing Project Management PDR ADOCK 05000456 Office of Nuclear Reactor Regulation P
PDR Docket Nos. STN 50-456 and STN 50-457 DISTRIBUTION:
Docket Files PUBLIC
Enclosure:
Safety Evaluation w/ attached T4.R PDill r/f TMcLellan 1 e r (13 3 OGC ACRS
~'
2*
R. Scholl G. Hatchett cc w/ encl: See next page
- see previous page for concurrence DOCUMENT NAME: G:\\PDill-2\\braidwood\\RR.,.A1354.wpd j
Ta receive a copy of this document %#ica$ in the box: "C" = Copy w/o attch/enci *E" = Copy wfsff6h/enci "N" = No copy OFFICE PM:PDil$ n lE iLAMlli-2 lC OGC l
SC:pbl)(-2.
l NAME GDick 7J M DMdole
- RBachmann
.A%iendda,
DATE 09hf99 d9(399 09/21/99
( D9! !99-7(/ /c//M Official Record Copy
/
/
I l'.A l
1 O. Kingsley Braidwood Station Commonwealth Edison Company Units 1 and 2 cc:
Regional Administrator Mr. Ron Stephens U.S. NRC, Region lll lilinois Emergency Services & Disaster Agency 801 Warrenville Road 110 E. Adams Street i
Lisle, Illinois 60532-4351 Springfield, Illinois 62706 lilinois Department of Nuclear Safety Chairman Office of Nuclear Facility Safety Will County Board of Supervisors 1035 Outer Park Drive Will County Board Courthouse Springfield, Illinois 62704 Joliet, Illinois 60434 Document Control Desk-Licensing Attorney General Commonwealth Edison Company 500 S. Second Street 1400 Opus Place, Suite 400 Springfield, Illinois 62701 Downers Grove, Illinois 60515 George L. Edgar Ms. C. Sue Hauser, Project Manager Morgan, Lewis and Bochius Westinghouse Electric Corporation 1800 M Street, N.W.
Energy Systems Business Unit Washington, DC 20036 Post Office Box 355 Pittsburgh, Pennsylvania 15230 Commonwealth Edison Company Braidwood Station Manager Joseph Gallo 35100 S. Rt. 53, Suite 84 Gallo & Ross Braceville, Illinois 60407 1025 Connecticut Ave., N.W., Suite 1014 Washington, DC 20036 Commonwealth Edison Company Site Vice President - Braidwood Ms. Bridget Little Rorem 35100 S. Rt. 53, Suite 84 Appleseed Coordinator Braceville, Illinois 60407-9619 117 N. Linden Street Essex, Illinois 60935 Mr. David Helwig Senior Vice President Howard A. Learner Commonwealth Edison Company Environmental Law and Policy Executive Towers West 111 Center of the Midwest 1400 Opus Place, Suite 900 35 East Wacker Dr., Suite 1300 Downers Grove, Illinois 60515 Chicago, Illinois 60601 Mr. Gene H. Stanley U.S. Nuclear Regulatory Commission PWR Vice President Braidwood Resident inspectors Office Commonwealth Edison Company 35100 S. Rt. 53, Suite 79 Executive Towers West til Braceville, Illinois 60407 1400 Opus Place, Suite 900 Downers Grove, Illinois 60515 Ms. Lorraine Creek RR 1, Box 182 Mantono, Illinois 60950
l O. Kingsley Braidwood Station Commonwealth Edison Company Units 1 and 2 Commonwealth Edison Company Reg. Assurance Supervisor-Braidwood 35100 S. Rt. 53, Suite 84 Braceville, Illinois 60407-9619 Mr. Christopher Crane BWR Vice President Commonwealth Edison Company Executive Towers West lll 1400 Opus Place, Suite 900 Downers Grove, Illinois 60515 Mr. R. M. Krich Vice President - Regulatory Services Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 500 Downers Grove, Illinois 60515 Ms. Pamela B. Stroebel i
Senior Vice President and General Counsel Commonwealth Edison Company P.O. Box 767 Chicago, Illinois 60690-0767 i
l l
l i
l l