Insp Repts 50-456/88-13 & 50-457/88-14 on 880410-0528. Violations Noted.Major Areas Inspected:Previously Identified Items,Ler Review,Startup Test Observation,Operational Safety Verification,Radiological Protection & SecurityML20155H031 |
Person / Time |
---|
Site: |
Braidwood ![Constellation icon.png](/w/images/b/be/Constellation_icon.png) |
---|
Issue date: |
06/15/1988 |
---|
From: |
Hinds J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
---|
To: |
|
---|
Shared Package |
---|
ML20155H004 |
List: |
---|
References |
---|
50-456-88-13-01, 50-456-88-13-1, 50-457-88-14, CAL-RIII-88-05, CAL-RIII-88-06, CAL-RIII-88-5, CAL-RIII-88-6, IEIN-84-55, NUDOCS 8806200172 |
Download: ML20155H031 (13) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:UTILITY
MONTHYEARIR 05000456/19900181990-11-16016 November 1990 Insp Repts 50-456/90-18 & 50-457/90-20 on 900817-1030.No Violations or Deviations Noted.Major Areas Inspected: Selected Startup Core Performance Testing & Surveillances Performed Subsequent to Initial Core Reload IR 05000456/19900201990-10-22022 October 1990 Insp Rept 50-456/90-20 on 901004-06.No Violations or Deviations Noted.Major Areas Inspected:Review of Operator Performance & Supervisory Overview During Incident Determining Adequacy of Operating Procedures IR 05000456/19900131990-08-17017 August 1990 Insp Repts 50-456/90-13 & 50-457/90-16 on 900617-0728. Violations Noted.Major Areas Inspected:Lers,Follow Up on TMI Action Items,Increase in Unit 1 I-131 Activity & Condenser Tube Leak & Unit 2 Heat Flux Hot Channel Factor IR 05000456/19900151990-07-25025 July 1990 Partially Withheld Physical Security Insp Repts 50-456/90-15 & 50-457/90-18 on 900621-27 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Protected & Vital Area Physical Barriers,Detection & Assessment Aids & Packages & Vehicles IR 05000456/19900121990-07-16016 July 1990 Safety Insp Repts 50-456/90-12 & 50-457/90-15 on 900429- 0616.Violations Noted.Major Areas Inspected:Licensee LER Review,Operational Safety Verification,Radiation Protection, Security & ESF Sys IR 05000456/19900141990-06-28028 June 1990 Insp Repts 50-456/90-14 & 50-457/90-17 on 900618-22.No Violations or Deviations Noted.Major Areas Inspected: Implementation of 10CFR50.62 & ATWS Rule IR 05000456/19900081990-06-14014 June 1990 Insp Repts 50-456/90-08 & 50-457/90-08 on 900416-20 & 0430- 0504.Violations Noted.Major Areas Inspected:Fire Protection, Inservice Testing,Support of Maint & Related Mgt Activities IR 05000456/19900101990-05-17017 May 1990 Insp Repts 50-456/90-10 & 50-457/90-11 on 900318-0428. Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Maint/Surveillance Observation & Contractor Health Physics Technician Strike IR 05000456/19890221989-09-25025 September 1989 Insp Repts 50-456/89-22 & 50-457/89-22 on 890730-0916. Violations Noted.Major Areas Inspected:Ler Review,Followup on Temporary Instructions,Self Assessment,Osha Issues, Inspector Inquiries & Degraded Main Steam Safety Valve IR 05000456/19890241989-09-12012 September 1989 Insp Repts 50-456/89-24 & 50-457/89-24 on 890703-0901. Violations Noted.Major Areas Inspected:Operational Radiation Protection Program & Radwaste Program,Including Changes in Personnel,Audits & Appraisals & Outage Planning IR 05000456/19890211989-08-31031 August 1989 Insp Repts 50-456/89-21 & 50-457/89-21 on 890731-0815. Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits,Protected & Vital Area Physical Barriers,Detection & Assessment Aids.Info Withheld IR 05000456/19890161989-08-21021 August 1989 Safety Insp Repts 50-456/89-16 & 50-457/89-16 on 890731- 0803.Allegations Unsubstantiated.Major Areas Inspected: Allegations Re NDE & Corrosion of Small Bore Piping IR 05000456/19890191989-08-0404 August 1989 Safety Insp Repts 50-456/89-19 & 50-457/89-19 on 890618- 0729.No Violations or Deviations Noted.Major Areas Inspected:Ler Review,Regional Request,Followup on TMI Action Items & Fuel Handling IR 05000456/19890181989-07-24024 July 1989 Safety Team Insp Rept 50-456/89-18 on 890612-0706.No Violations or Deviations Noted.Major Areas Inspected: Instrumentation Sys for Assessing Plant Conditions During & Following Accidents as Specified in Reg Guide 1.97,Rev 3 IR 05000456/19890151989-06-23023 June 1989 Insp Repts 50-456/89-15 & 50-457/89-15 on 890430-0617.No Violations Noted.Unresolved Item Noted Re Operator Logs. Major Areas Inspected:Ler Review,Regional Request,Followup on TMI Action Items & Operational Safety Verification IR 05000456/19890171989-06-22022 June 1989 Insp Repts 50-456/89-17 & 50-457/89-17 on 890601-20. Violation Noted Re ECCS Operability.Major Areas Inspected: Inoperability of Centrifugal Charging Pump 2B While Manual Isolation Valve in Recirculation Line Shut IR 05000456/19890111989-06-16016 June 1989 Safety Insp Repts 50-456/89-11 & 50-457/89-11 on 890508-24. No Violations Noted.Major Areas Inspected:Verify That Util Emergency Operating Procedures Technically Correct & Usable IR 05000456/19890091989-05-15015 May 1989 Safety Insp Repts 50-456/89-09 & 50-457/89-09 on 890319-0429.Violations Noted.Major Areas Inspected:Ler Review,Followup on TMI Action Items,Unit 2 Boron Dilution Prevention Sys Inoperability & Training Effectiveness IR 05000456/19890121989-05-0303 May 1989 Partially Withheld Physical Security Insp Repts 50-456/89-12 & 50-457/89-12 on 890410-14 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support,Access Control - Personnel,Packages & Vehicles IR 05000456/19890051989-03-29029 March 1989 Insp Repts 50-456/89-05 & 50-457/89-05 on 890203-0318.No Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Items,Ler Review,Regional Request, Followup on TMI Action Item,Esf Sys & Security IR 05000456/19890041989-03-17017 March 1989 Corrected Table 2 & Revised Descriptive Text to Insp Repts 50-456/89-04 & 50-457/89-04,correcting Licensee Fe-55 Value IR 05000456/19890061989-03-14014 March 1989 Insp Repts 50-456/89-06 & 50-457/89-06 on 890214-17. Violations Noted.Major Areas Inspected:Changes in Personnel, Audits & Appraisals,Planning & Preparation,External & Internal Exposure Controls & Control of Radioactive Matls ML20245J2431989-02-17017 February 1989 Insp Repts 50-456/89-04 & 50-457/89-04 on 890110-13 & 18-20. No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training,Primary & Secondary Sys Water QC Programs & QA in Lab IR 05000456/19880281988-11-17017 November 1988 Insp Repts 50-456/88-28 & 50-457/88-28 on 881015-1103.No Violations Noted.Major Areas Inspected:Events Surrounding Several Missed or Improperly Performed Tech Spec Surveillances IR 05000456/19880271988-11-0808 November 1988 Insp Repts 50-456/88-27 & 50-457/88-27 on 881017-22.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Followup on Actual Emergency Preparedness Program & Previously Identified Items IR 05000456/19880261988-10-27027 October 1988 Insp Repts 50-456/88-26 & 50-457/88-26 on 880828-1015. Violations Noted.Major Areas Inspected:Ler Review,Secondary Chemistry Excursion,Startup Test Observation,Operational Safety Verification,Esf & Training Effectiveness IR 05000456/19880251988-09-23023 September 1988 Insp Repts 50-456/88-25 & 50-457/88-25 on 880829-0908.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection Program & Gaseous Liquid & Solid Radwaste Programs ML20154J2101988-09-14014 September 1988 Insp Repts 50-456/88-22 & 50-457/88-22 on 880710-0827.No Violations or Deviations Noted.Major Areas Inspected:Ler Review,Heat Wave Effect,Startup Test Observation, Verification,Radiological Protection & Physical Security IR 05000456/19880021988-08-17017 August 1988 Insp Repts 50-456/88-02 & 50-457/88-02 on 871120-880722.No Violations Noted.Major Areas Inspected:Alleged Use & Sale of Drugs by Some Named Contractors Employed at Site & Criminal Records of Some Employees ML20151J6491988-07-22022 July 1988 Enforcement Conference Repts 50-456/88-23 & 50-457/88-23 on 880718.Major Areas Discussed:Enforcement Options, Circumstances Surrounding & Corrective Actions in Response to Violation Re Inattentiveness to Duty IR 05000456/19880191988-07-19019 July 1988 Safety Insp Repts 50-456/88-19 & 50-457/88-19 on 880529- 0709.No Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Items,Emergency Preparedness,Followup on TMI Action Items & Events ML20150B5521988-07-0101 July 1988 Partially Withheld Physical Security Insp Repts 50-456/88-20 & 50-457/88-20 on 880620 (Ref 10CFR2.790).Violations Noted. Major Areas Inspected:Compensatory Measures & Access Control & Incident Involving Inattentiveness of Security Officers ML20154C9121988-07-0101 July 1988 Insp Repts 50-456/88-20 & 50-457/88-20 on 880620.Violation Noted.Major Areas Inspected:Compensatory Measures & Access Control Re NRC Identified Incident Involving Inattentiveness to Duty Issue of Security Officers IR 05000456/19880181988-06-28028 June 1988 Partially Withheld Insp Repts 50-456/88-18 & 50-457/88-18 on 880606-10 & 0614-21.No Violations Noted.Major Areas Inspected:Mgt Effectiveness,Security Organization & Program Audit,Records & Repts & Physical Barriers IR 05000456/19880171988-06-21021 June 1988 Insp Repts 50-456/88-17 & 50-457/88-17 on 880524-26 & 0531-0602.No Deviations Noted.Violation Noted.Major Areas Inspected:Plant Chemistry Organization,Mgt Controls,Qa & Confirmatory Measurements for Plant Radiochemical Analyses IR 05000456/19880131988-06-15015 June 1988 Insp Repts 50-456/88-13 & 50-457/88-14 on 880410-0528. Violations Noted.Major Areas Inspected:Previously Identified Items,Ler Review,Startup Test Observation,Operational Safety Verification,Radiological Protection & Security IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items ML20154Q3861988-05-27027 May 1988 Insp Repts 50-456/88-05 & 50-457/88-06 on 880229-0504. Deviations Noted.Major Areas Inspected:Licensee Action on Ser/Technical Evaluation Rept Commitments & Environ Qualification Program Compliance to 10CFR50.49 IR 05000456/19880141988-05-0505 May 1988 Safety Insp Repts 50-456/88-14 & 50-457/88-15 on 880419-27. No Violations or Deviations Noted.Major Areas Inspected: Actions on Previous Insp Items ML20151Z4871988-05-0202 May 1988 Partially Withheld Physical Security Insp Repts 50-456/88-15 & 50-457/88-16 on 880420-21 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Licensee Reported Security Event on 880419 Re Control Access to Vital Area IR 05000456/19880101988-04-20020 April 1988 Insp Repts 50-456/88-10 & 50-457/88-11 on 880314-30.No Violations or Deviations Noted.Major Areas Inspected:Status of Fire Protection License Conditions & Open Items IR 05000456/19880081988-04-18018 April 1988 Insp Repts 50-456/88-08 & 50-457/88-09 on 880214-0409. Violations Noted.Major Areas Inspected:Confirmatory Action Ltrs,Regional Requests,Followup on TMI Action Items,Control Room Log Entries & Physical Security ML20151H5681988-04-14014 April 1988 Safety Insp Repts 50-456/88-13 & 50-457/88-11 on 880314-25. Violation Noted.Major Areas Inspected:Events Surrounding Inoperability of Nonaccessible Area Exhaust Filter Plenums IR 05000457/19880121988-04-12012 April 1988 Safety Insp Rept 50-457/88-12 on 880314-25.Violation Noted. Major Areas Inspected:Event in Which 2B Safety Injection Pump Found Incapable of Performing Intended Function When Pump Manual Discharge Valve Found Locked Shut ML20150E9701988-03-29029 March 1988 Operational Readiness Insp Rept 50-457/88-07 on 880216-0307. Violations Noted.Major Areas Inspected:Operations, Surveillance & Testing,Maint,Radiation Controls,Chemistry Controls,Nuclear Engineering Activities & Training IR 05000456/19880091988-03-28028 March 1988 Safety Insp Repts 50-456/88-09 & 50-457/88-10 on 880303-07. No Violations or Deviations Noted.Major Areas Inspected: Allegation Riii 88-A-0009 ML20150E9921988-03-25025 March 1988 Insp Rept 50-456/88-07 on 880301-17.Apparent Violation Noted:Failure to Have Control Room Ventilation Sys Operable. Appropriate Enforcement Action Will Be Determined.Major Areas Inspected:Licensee Actions Following Startup Test IR 05000456/19870381988-03-17017 March 1988 Insp Repts 50-456/87-38 & 50-457/87-36 on 871005-1222, 880119,0218 & 26.Violations & Deviations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Review of Electrical & Instrumentation Components IR 05000456/19880041988-03-0909 March 1988 Insp Repts 50-456/88-04 & 50-457/88-05 on 880113-0216.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection Program,Including Licensee Action on Previous Insp Findings & Organization IR 05000456/19880061988-03-0909 March 1988 Safety Insp Repts 50-456/88-06 & 50-457/88-08 on 880216-25. No Violations or Deviations Noted.Major Area Inspected: Licensee Implementation of Generic Ltr 83-28 in Areas of Equipment Classification & Vendor Interface 1990-08-17
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20195G3681998-11-17017 November 1998 Notice of Violation from Insp on 980909-1019.Violation Noted:As of 980818,licensee Failed to Initiate Measures to Determine Cause or Take Action to Preclude Recurrence of Loose Bolts on Two EDG Lubricating Oil Heat Exchanger Bells ML20195G3031998-11-13013 November 1998 Notice of Violation from Insp on 980915-1022.Violation Noted:On 981022,two Individuals Working Under RWP 984014 Removed Outer Rubber Gloves While Replacing Insulation in Containment IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project ML20196D9201998-11-10010 November 1998 Notice of Violation from Insp on 981013-19.Violation Noted: Licensee Security Staff Discovered That on Three Occasions Between 980826 & 1002,security Officers Were Found Asleep on Post IR 05000456/19983051998-11-0202 November 1998 Exam Repts 50-456/98-305 & 50-457/98-305 on 980914 with Telephoned Exam Results 981020.No Violations Noted.Exam Results:Applicant Passed Retake Exam & Was Issued Reactor Operator License IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0911998-07-0606 July 1998 Notice of Violations from Insp on 980421-0608.Violations Noted:On 980424,licensee Failed to Implement Specific Fire Protection Program Requirements in That Welding Machine Was Left Unattended & Energized in Fuel Handling Bldg ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20248D0821998-05-19019 May 1998 Notice of Violation from Insp on 980310-0420.Violation Noted:On 980303,licensee Failed to Implement Braidwood Administrative Procedure 2321-18T11,Step E.1,for Sf Pool Skimmer Strainer Level Control IR 05000456/19983041998-04-29029 April 1998 NRC Operator Licensing Exam Repts 50-456/98-304OL & 50-457/98-304OL (Including Completed & Graded Tests) Administered During Wk of 980413 ML20217F5281998-04-21021 April 1998 Notice of Violation from Insp on 980331-0407.Violation Noted:Licensee Failed to Check That SG Worker Dosimetry Was Present & Correctly Worn IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0611998-04-0808 April 1998 Notice of Violation from Insp on 980127-0309.Violation Noted:On 971010,21,1219 & 980105,licensee Failed to Require Independent Verification of Proper Sys Alignment for safety-related Valves Repositioned in Steps F.1.4 & F.1.7 ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20203D9151998-02-20020 February 1998 Notice of Violation from Insp on 971216-980126.Violation Noted:In Nov 1989,licensee Failed to Initiate Deviation Rept & Take Corrective Measures to Preclude Repetition of Mechanical Failure to All 4 Main Feedwater Check Valves ML20202F2321998-02-11011 February 1998 Notice of Violations from Insp on 971112-21 & 980115. Violations Noted:Licensee Failed to Follow NSWP-A-15 & Bwap 330-10 Requirements to Issue PIF for Tempering Line Snubber Considered Inoperable on 971110 IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering PNO-III-98-013, on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration1998-01-29029 January 1998 PNO-III-98-013:on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07100104/20120151998-01-0202 January 1998 Notice of Violation from Insp on 971104-1215.Violation Noted:On 971102,inspectors Identified That Licensee Had Failed to Fasten Covers on Incore Neutron Detector Drive Mechanism IR 05000456/19973101997-12-29029 December 1997 NRC Operator Licensing Exam Repts 50-456/97-310OL & 50-457/97-310OL for Tests Administered on 971006-1107.Three Senior Reactor Operators & One Reactor Operator Passed Exam. One Senior Reactor & One Reactor Operator Failed ML20199A5681997-12-17017 December 1997 Notice of Violation from Insp on 970923-1103.Violation Noted:On 971014,licensee Instrument Technician Made Error When Changing Setpoints on Unit 2 Containment Area Radiation Monitor 2AR11J.Error Resulted in High Radiation Alarm 1999-09-03
[Table view] |
Text
.e
% ** .
[
.
!:' '
u
- U.S. NUCLEAR REGULATORY COMMISSION
.
REGION III
Report Nos. 50-456/88013(DRP); 50-457/88014(DRP)
Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-75; NPF-77 Licensee: Commonwealth Edison Company Post-Office Box 767 Chicago, IL 60690 Facility Name: Braidwood Station, Units 1 and 2
.
Inspection At: Braidwood Site, Braidwood, Illinois Inspection Conducted: April 10 through May 28, 1988 Inspectors: T. M. Tongue T. E. Taylor R. M. Lerch G. A. VanSickle
"
J. A. Gavula F. A. Maura f??Y9+}A ApprovedBy:ft J. M. Hinds, Jr. , Chief fbstv/4I/998
'
/ Reactor Projects Section 1A 'Date Inspection Summary Inspection from April 10 through May 28, 1988 (Report Nos. 50-456/88013(ORP);
50-457/88014(DRP))
Areas Inspected: Routine, unannounced safety inspection by the resident inspectors and region-based inspectors of licensee action on previously identified items; licensee event report review; startup test observation; operation 61 safety verification; radiological protection; engineered safety l feature systems; physical security; monthly maintenance observation; monthly surveillance observation; inoperability of 08 control room chiller; confirma-tory action letters; issuance of Unit 2 full power license; increased control room and plant observations; training effectiveness; initial synchronization to the grid of Unit 2; and report revie Results: Of the sixteen areas inspected, no violations were identified in fourteen. In the remaining areas two violations were identified, one regarding a missed surveillance requiring the use of moveable incore detectors (MIDS)
(Paragraph 10) and the other concerning the inoperability of the OB control room chiller (Paragraph 11).
8806200172 880615 PDR ADOCK 05000456 O DCD
.
..' .. .
.
- '
a'
- DETAILS
. Persons Contacted Commonwealth Edison Company (CECO)
T. J. Maiman, Vice President M. J. Wallace, Manager of Projects D. L. Shamblin, Project Manager
- R. E. Querio, Station Manager W. E. Vahle, Construction Superintendent
- D. E. O'Brien, Station Services Superintendent
- K. Kofron, Production Superintendent L. E. Davis, Assistant Superintendent - Technical Services B. Byers, Assistant Construction Superintendent M. Lohman, Project Startup Superintendent P. Cretens, Station Startup Assistant Superintendent S. C. Hunsader, Nuclear Licensing Administrator F. Willaford, Security Administrator D. E. Paquette, Maintenance Assistant Superintendent
- R. Masters, Operations Assistant Superintendent E. L. Martin, Quality Assurance Superintendent R. Benn, Assistant Security Administrator
- P. L. Barnes, Regulatory Assurance Supervisor M. Takaki, Regulatory Assurance J. Gosnell, Quality Control Supervisor R. E. Aker, Radiation / Chemistry Supervisor J. Jasnoz, Technical Staff AR/PR Coordinator R. Lemke, Technical Staff Supervisor F. G. Lentine, Licensing Supervisor G. M. Orlov, Staff Assistant to Project Manager P. G. Holland, Regulatory Assurance T. W. Simpkin, Regulatory Assurance Operating Experience Group R. C. Bedford, Regulatory Assurance R. D. Kyrouac, Quality Assurance Supervisor L. Kline, Regulatory Assurance Industry Group
- L. W. Raney, Nuclear Safety R. J. Ungeran, Operating Engineer Unit 1 R. Yungk, Operating Engineer R. J. Legner, Lead Operating Engineer T. O'Brien, Tech Staff S. Hedden, Master, Instrument Maintenance R. Hoffman, Master, Mechanical Maintenance J. Smith, Master, Electrical Maintenance W. McGee, Training Supervisor B. Tanouye, Project Construction Departr.1ent A. J. D' Antonio, Quality Control D. H. Schavey, Training
- E. W. Carroll, Regulatory Assurance j *P. F. Hart, Quality Assurance Engineer (
l l
l i 2 l
l
- _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - - _ _ - - - - - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _ _ _
,
-
'
.; . . .
, 'i
.
- * Pierce,' Assistant Technical Staff Supervisor
- L. Bush, Regulatory Assurance
- R. A~. Fessner, Operations Staff
- Denotes those attending the exit interview conducted on May 26, 1988 and at other times throughout the inspection perio The inspectors also talked with and interviewed several other licensee
. employees, including members of the technical and engineering staff 3, startup engineers, reactor and auxiliary operators, shift engineers and foremen, electrical, mechanical and instrument maintenance personnel, contract security personnel, and construction personne . Licensee Action on Previously Identified Items (92701)
(Closed) Open Item 457/87028-01: Completion of local leak rate testing required to calculate the containment integrated leak rate test (CILRT)
valve lineup penalty. The inspector reviewed the local leak rate results of 2BwPT-PC-50 for the steam generator blowdown and fuel transfer tube-penetrations, and the local leak rate results of 2BwPT-PC-50, Retest #24, for the CILRT test instrumentation and H m nitoring penetration Using the minimum pathway leakage methodology,2the overall penalty leakage calculation, including instrument error, was 683 sccm, which is equivalent to 0.0003 wt %/ da As a result, the NRC calculated Lam (total measured
- ontainment leakage rate at the calculated peak containment internal pressure) at the 95% upper confidence limit remained 0.049 wt %/ day, which is below the Appendix J acceptance criteria of <0.075 wt %/ da This item is considered close (Closed) Open Item 457/88004-01: Inconsistent thermal movements between high temperature and ambient conditions necessitated additional testing and verification of piping thermal expansio Due to the previously identified inconsistencies, Preoperational Test Procedure BwPT-EM-50, "Thermal Expansion-Primary Side," Retest No. 038, was conducted during February 1988. Subsystems 2CV09, 2CV15, 2CV25, 2RC13 and 2MS01 wero included in this retest procedure. Based on the previous test results, approximately six supports were modified in order to reduce the frictional forces inherent in the original support design System temperatures were extensively monitored and used in thermal expansion calculations in order to obtain additional accuracy for predicted piping movement The NRC inspector reviewed relevant portions of the above test results to confirm the correlation between the as-analyzed and as-observed thermal displacements. This review showed that all the observed thermal displacements were within the stated tolerances of the predicted displacements. Based on this review, this item is considered close No violations or deviations were identifie .
.; .. .
..
.
..'
.' Licensee Event Report (LER) Review (92700)
.
Through direct observations, discussions with licensee personnel, and review of records, the following event reports were reviewed to determine that reportability requirements were fulfilled, immediate corrective action was accomplished, and corrective action to prevent recurrence had been or would be accomplished in accordance with technical specifications:
(Closed) 456/87031-L1 and L2: Control Room Ventilation Shift to Emergency Makeup Mode as Result of Spurious Actuation of Rad Monitor Due to a Design Deficiency. Supplemental reports issued to include an additional occurrence of December 28, 1987, and to update the corrective action taken. Overall, three actuations (June 23, October 16, and December 28, 1987) occurred. The root cause of all three events has been attributed to the pressure switches of monitors OPR 31J and OPR 32J, which have repeatedly generated noise spikes when the monitor vacuum level has fluctuated around a high vacuum (approximately 10 inches of mercury below atmospheric). As part of the licensee's corrective actions, noise suppressing electro cubes were installed into the monitors' pressure switch assemblies. There have been no further occurrences of this typ This item is considered close (Closed) 456/87058-LL: Both Trains of Control Room Ventilation Inoperable Due to Incorrect Design Incorporation. This LER was reviewed and is specifically addressed in Inspection Report 50-456/88007(DRSS).
Enforcement actions are addressed in associated correspondence and tracked under that inspection report number. This LER is considered close (Closed) 45G/87063-LL and 456/88006-LL: Two Inoperable Non-Accessible VA Filter Plenums Due to Misalignment. This event is addressed in Inspection Reports 456/88011(DRP); 457/88013(DRP). A Notice of Violation was issued for these events. This LER is considered close _(Closed) 457/88001-LL: Safety Injection Pump Discharge Valve Found Locked Closed. This issue is addressed in Inspection Report 457/88012(DRP).
A Notice of Violation was issued for this even This LER is considered closed.
(Closed) 456/88004-LL: Rod Withdrawal as Indicated by Digital Rod Position Indication (DRPI). At 6:55 a.m. on March 11, 1988, Unit 1 was
- in hot shutdown with the control rods fully inserted and the reactor i trip breakers closed, when an annunciator indicated a control rod l deviation. The DRPI display for rod D-4, Control Bank D, was at 18
'
steps. An attempt to manually insert control rod D-4 failed to change the indication and as a result, at 6:57 a.m. the reactor trip breakers
,
were manually opened with no change in rod 0-4 indication. Boration was then initiated to increase the boron concentration by 100 ppm per procedure for shutdown margin consideration '
l l
I l
l
- 4 l
.
.. e * *
.
.
..'
- The cause of this event was a failure of the detector / encoder card in the DRPI Data A cabinet. The detectoc/ encoder card was replaced and the system was declared operable. The failure affected rod position indication only; there was no physical control rod movement. The licensee is continuing to inonitor DRPI system performance for any generic or recurring failure This item is considered close (Closed) 456/88009-LL: Loss of OB Controi Room Chiller Due to Determination of Temperature Controller. During routine maintenance on the 08 Control Room Chiller OW001CB, instrument technicians found leads for the chilled water sensor lifted and taped of This issue is the subject of a Notice of Violation and is discussed in detail in paragraph 11 of this report. This LER is considered close (Closed) 456/88010-LL: Control Room Ventilation to Makeup Mode of Operation From a High Radiation Alarm Due to Incorrect Setpoint. At 1:03 a.m. on April 10, 1988, the control room ventilation system automatically shifted to the emergency makeup mode of operatio This was in response to a high radiation setpoint being exceeded on control room outside air intake particulate channel ORE-PR033 Samples by the Radiation / Chemistry Department verified that there were no abnormal levels of radioactivity presen It was discovered that an incorrect setpoint had been entered for the monito This was due to a management deficiency in that permanent changes to the instrument data sheets were not properly implemented in accordance with the procedure when the setpoint was modified by a change to the Final Safety Analysis Report. The proper setpoint was entered, operation of the monitor was returned to normal, and the control room ventilation system lineup was returned to normal. Radiation setpoints have been reviewed and verified to be correct on all control room ventilation monitors, and the setpoint data sheet documentatien has been reviewed and correcte Qual verification is now required on the data sheets, and the instrument procedure will be revised to required Yochnical Staff notification when a discrepancy between the as-found condi?. ion and the data sheet is identifie This item is considered close In addition to the foregoing, the inspector reviewed the licensee s Deviation Reports (DVRs) generated during the inspection perio This was done in an effort to monitor the conditions related to plant or personnel performance, potential trends, etc. DVRs were also reviewed for assurance that they were generated appropriately and dispositioned in a manner consistent with the applicable procedures and the quality assurance (QA) manua No violations or deviations were identifie . Startup Test Observation (72302)
The inspectors witnessed performance of portions of the following Unit 2 startup test procedures in order to verify that testing was conducted in accordance with the operating license and procedural requirements, that test data was properly recorded, and that performance of licensee
m
__ _ . -_
,
..' . . .
r:
"
.
..'
- personnel con'ucting d the tests demonstrated an understanding of assigned
'
duties and responsibilities:
AP-70 - Loss of Offsite Power RC-75 - Shutdown From Outside the Control Room No violations or deviations were identifie . Operational Safety Verification (71707)
The inspectors conducted routine plant tours during the inspection period to make an independent assessment of-equipment conditions, plant condi; ions, construction activities, security, fire protection, general personnel safety, housekeeping, and adherence to applicable regulatory requirements. During the tours, the inspectors reviewed various logs and daily orders, interviewed personnel, attended shift briefings and plan of the day meetings, witnessed various construction work activities, and independently determined equipment status. During the shift changes, the inspectors observed operator, shift control room engineer, and shift engineer turnovers and panel walkdown These reviews and observations were conducted to verify that facility operations were in conformance with the requirements established under technical specifications,10 CFR, and administrative procedure No violations or deviations were identifie . Radiological Protection (71709)
The inspectors selected portions of the licensee's radiological program to verify conformance with facility policies, procedures, and regulatory .
requirement Observed aspects included the health physics managers'
awareness of any unusual conditions or challenges, the implementation of the ALARA program, the use of Radiological Work Permits (RWPs), the control and monitoring of radiation exposures, including work in high radiation areas if applicable, and the control of radioactive materia No "iolations or deviations were identifie . Engineered Safety Feature (ESF) Systems (71710)
During the inspection, the inspectors selected accessible portions of several ESF systems to verify their statu Consideration was given to the plant mode, applicable Technical Specifications, Limiting Conditions for Operation Action Requirements (LC0ARs), and other applicable requirements.
. Various observations, where applicable, were made of hangers and supports; housekeeping; whether freeze protection, if required, was installed and operational; valve positions and conditions; potential ignition sources; major component labeling, lubrication, cooling, etc. ; interior conditions
<
of electrical breakers and control panels; whether instrumentation was
6
-_ _ _ . -
- - - -
.
\ ..: ,. .
- s
-
1 - .
, .
. properly installed and functioning and significant process parameter
-
values were consistent with expected values; whether instrumentation was calibrated; whether necessary support systems were operational; and whether locally and remotely indicated breaker and valve positions agreed, j J
During the inspection, the following ESF systems / components were walked down:
Unit 1 l
1A and IB Emergency Diesel Generators '
4160 ESF Switchgear Unit 2 ,
2A Emergency Diesel Generator No violations or deviations were identifie . Physical Security (71881)
At various times throughout the inspection period, the inspectors monitored compliance with the Physical Security Plan (PSP). Observations were made of selections of manning levels and collateral duties of assigned personnel; access control equipment and processes, such as x-ray machines, metal detectors, explosive detectors, and other search mechanisms; whether protected area (PA) and vital area (VA) barriers were properly maintained; whether procedures were properly followed; whether compensatory measures were appropriately used when required; whether persons in the PA and VA were preperly badged and escorted if required; whether various detection / assessment aids such as fences and illumination of the PA, were operable, and whether TV monitors had sufficient clarity and resolutio No violations or deviations were identifie . Monthly Maintenance Observation (62703)
Station maintenance activities affecting the safety-related systems and components listed below were observed / reviewed to ascertain that they were conducted in accordance with approved procedures, regulatory guides and industry codes or standards, and in confor.aance with Technical Specification The following items were considered during this review: the limiting conditions for operation were met while components or systems were removed from and restored to service; approvals were obtained prior to initiating the work; activities were accomplished using approved procedures and were inspected as applicable; functional testing and/or alibrations were performed prior to returning components or systems to service; quality control records were maintained; activities were
. _ . . . . . . . . . . . . . . . . .
-
.
'
._ . .
.
.
.
.
accomplished by qualified personnel; parts and materials used were
'
-
properly certified; radiological controls were implemented; and fire prevention controls were implemente Work requests were reviewed to determine the status of outstanding jobs and to assure that priority is assigned to safety-related equipment maintenance which may affect system performanc Maintenance activities on the following equipment were observed and reviewed:
Unit 1 1D, C, FWO0a Feedwater Isolation Valves Hydraulic System 1B Emergency Diesel Generator Moveable Incore Detector System Troubleshooting Unit 2 2A RHR Pump Shaft Seal Replacement 28 Diesel Generator Water Jacket Inspection on 10L Cylinder Unit 1 and Unit 2 Environmentally Qualified (EQ) Motor Operated Valves (MOV) Grease Sampling and Replacement EQ Pressure Switch Replacement No violations or deviations were identifie . Monthly Surveillance Observation (61725)
The inspectors observed surveillance testing required by technical specifications for Units 1 and 2 during the inspection period and verified that testing was performed in accordance with adequate procedures, that test instrumentation was calibrated, that limiting conditions for operation were met, that removal and restoration of the affected components were accomplished, that results conformed with techni.'al specifications and procedure requirements and were reviewed by personnel other than the individual directing the test, and that any deficiencies identified during the testing were properly reviewed and resolved by appropriate management personne The inspectors also witnessed portions of the following test activities:
,
Unit 1 1B Diesel Generator Monthly Operability Surveillance Bw0P IC-3, Incore Moveable Detectors Flux Mapping Procedure Bw0P 3.4.2.a-1, Turbine Throttle Governor, Reheat and Intercept Valve Monthly Surveillance
--- .
- -
,, , . .
L .
,
".
..
Unit 2
.
28w0S 3.2.1-070, Unit 1 ESFAS (Engineered Safety Feature Actuation System) Instrumentation Slave Relay Surveillance 2B Auxiliary Feedwater AFW ASME pump Run Surveillance Requiring Use of the Moveable Incore Detectors (MIDS)
During the inspection, the inspectors became aware that the licensee was experiencing problems with Unit 1 Moveable Incore Detectors (MIDS).
Only 43 of the pathways were available for flux mapping. This number is less than the 75% (44 of 58) required by Technical Specification 3.3. for the performance of surveillances involving the MID The blocked thimbles (passages), which were initially found on May 10, 1988, apparently resulted from the settling of the lubricant (neolube) used to lubricate the thimble tubes. An additional 2 clogged thimbles were later identifie This phenomenon had been experienced at other similar facilities in the past. The licensee made several unsuccessful attempts to clear the thimble tubes by running the normal neutron detector or a blank cable with the normal drives through the affected thimble This issue also received attention from Region III and NRC Headquarters due to previous thimble failures during attempts to clear blockages and unusual radiation exposures to hands during removal of irradiated cables and detectors at other facilitie These occurrences were dirs assed in IE Information Notice 84-5 After discussions between the licensee and regional personnel, the licensee chose not to attempt to clean the thimbles while the reactor was at normal operating temperature and pressure. In addition, after the failed attempts to clear the blockage, the licensee pursued relief from Technical Specification 3.3.3.2 in order to perform the required surveillances with fewer thimbles. This had been done in the past at other similar facilities; however, the submittal for Braidwood Unit I was disapproved by NRR due to a lack of core information for high power levels at that uni Subsequent to the inspection period, on June 3, 1988, an emergency Technical Specification relief was granted for a period of ten days for continued operation, during which preparations could be made for shutdown, cooldown, and cleaning of the blockage One surveillance foe which 75% of the detector thimbles must be avail-able is the incore-excure calibration of the power range high neutron flux trip setpoin Table 4.3-1 of the Technical Specifications requires this surveillance to be performed quarterly, above 75% of rated thermal power. This surveillance was last performed in January 1988, and the latest allowable date for completion of the subsequent surveillance was March 23, 1988, in accordance with Technical Specification 4.0.2. Since the MIDS were unavailable and a current calibration was not in effect, the appropriate action would have been to reduce power to less than 75%,
where the calibration requirement does not appl *
., . .
.o
..
'..'
Contrary to the foregoing, on May 23, 1988, during sustained observation
-
of control room and plant activities, an inspector noted that reactor power was between 75% and 76%. This condition had existed for 13 day In discussions with the inspectors, plant management personnel stated that they chose to stay at greater than 75% power as an incentive to operating personnel to correct the MID problem, thereby enabling performance of the required surveillance. However, no corrective action to restore MID operability was available for the immediately foreseeable future. When the Senior Resident Inspector pointed out this state of affairs to the plant manager and indicated that reducing power to less than 75% would be appropriate, the licensee-reduced power to 74%.
The licensee contended that it was within the Technical Specifications as long as it was actively pursuing the calibration. The licensee also stated that the basis for Technical Specification 4.0.4 allowed this operation. After further review, the inspectors contended that the basis for 4.0.4 does not apply in this instance, and that as long as the equipment to perform the calibration was inoperable (less than 75% of the MIDS available), the surveillance could not be performe Subsequent to the inspection period, the inspectors consulted with NRR on June 6, 1988, and found that NRR concurred with the inspectors'
evaluation. In addition, guidance provided in Generic Letter 87-09 provides a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for a surveillance to be performed following an outage; however, this guideline has not been made part of the Braidwood/ Byron Technical Specification The failure to take appropriate corrective action when it was found that the excore neutron detectors could not be calibrated is considered a violation of Technical Specification 4.3-1, item 2 (50-456/88013-01(DRP)).
1 Inoperability of OB Control Room Chiller On March 2,1988, the Project Construction Department (PCD) requested the electrical contractor to determinate temperature element 1TE-0082 on containment chiller 1W001CB. On March 16, 1988, using erroneous information referenced on the construction work traveler, an electrical contractor construction worker determinated temperature controller OTC-W0082 for control room chiller 0W001CB, and not temperature element ITE-0082 on containment chiller 1W001CB. On April 7, 1988, during routine maintenance of control room chiller 0W001CB, a contractor instrument technician discovered that leads to temperature controller OTC-WOO 82 were determinated and taped. Investigation by operations personnel found that all the leads to OTC-WOO 82 were daterminated and that no authorized work other than the routine maintenance by the contract instrument technician was in progress for the 0W001CB control room chiller. At 11:23 p.m. on April 7,1988, control room chiller 0W001CB was declared
- inoperable, and the appropriate Technical Specification Action Statement
!
was entered. On April 8, 1988, the OTC-W0082 temperature controller was
! reterminated, and chiller OW001CB was functionally tested satisfactoril With the temperature controller determinated, the chiller would have started, but would not have loaded to maintain the control room temperature below 90*F.
,
. - - - - - - - - - - -
.. . .
.. - .
-
.
. - . . .
. . . . .
. . - , . . . . .
. y , . .
, .*
.
'
..'
. The root cause of this event was the erroneous information referenced
-
on the construction work traveler. The errors were introduced during transposition of equipment numbers from the original work request generated on March 2, 1988, to.the construction work traveler. The work traveler referenced VC (control room ventilation) Chiller Temperature Controller 1TC-0082, instead of Containment Chiller Temperature Element 1TE-0082; and Control Room Chiller Equipment Piece Number (EPN) OW001CB, instead of Containment Chiller 1W001C Technical Specification 3.7.6 requires that two independent VC systems shall be operable. Additionally, for Modes 5 and 6, Technical Specifi-cation 3.7.6 states, "With one Control Room Ventilation System inoperable, restore the inoperable system to operable status within 7 days or initiate and maintain operation of the remaining operable Control Room System in the makeup mode." The B Train of the VC system was inoperable for approximately 22 days. This failure to initiate action to restore operability within 7 days or to maintain Train A of the VC system in the makeup mode with one VC system inoperable is a violation of Technical Specification 3.7.6 (50-456/88013-02(ORP)). Details of this event are documented in LER 456/8800 As corrective action, licensee management has counseled all individuals onsite involved with this event and revised page 1 of Quality Procedure QP 3-1 to require all maintenance and modification work which is to be done by the Projects and Construction Services Departments or Substation Department to be controlled by the station under the Work Request Syste This will eliminate the possibility of transposing incorrect EPNs onto construction travelers. Based on the corrective actions taken by the licensee the inspector has no further concerns regarding this matter and this item is considered closed; consequently, no reply to this violation is require . Confirmatory Action Letters (CALs)
On March 23, 1988, Confirmatory Action Letters (CALs) CAL-RIII-88-05 and CAL-RIII-88-06 were issued for Braidwood Units 1 and 2, respectively (see Inspection Report 456/88008; 457/88009).
The CALs were lif ted by Region III letters, dated April 29 and May 16, 1988, for Units 1 and 2, respectivel During the duration of the CALs, the resident inspectors monitored the progress, status, and results of the corrective actio No violations or deviations were identifie . Unit 2 Full Power License Issued On May 20, 1988, a Commission briefing was held at NRC headquarters in Rockville, Maryland for determining whether the licensee should receive a full power license to operate Braidwood Unit 2. After presentations
M4
- '
1 II I
e , ,
't c,. .. ;
i
,
.- i
.
by Commonwealth Edison and members of the NRC Staff, the Commissioners voted 5 to 0 authorizing the granting of the licens NRC Operating License NPF-77 was issued by NRR on that da No violations or deviations were identifie . Increased Control Room and Plant Observations In accordance with a commitment to the Commission, the resident inspectors, augmented by Region III inspectors, conducted continuous (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day) inspections in the control room and in the plant during the first four days when the Unit 2 reactor power was increased above 3% following the issuance of the full power license. In addition, monitoring was increased during other major activities at the plant, such as main turbine rolls and initial synchronization to the gri This was done to verify that any conflicts were resolved between Unit 1 operation and Unit 2 power ascension. The inspectors found that communications were acceptabl No violations or deviations were identifie . Initial Synchronization to the Grid On May 25, 1988, the Unit 2 main turbine generator was synchronized to the grid on nuclear steam for the first tim The inspectors monitored the preparation, increase in power, and the execution of the activitie They were carried out in a well planned, cautious manne No violations or deviations were identifie . Training Effectiveness (41400 - 41701)
The effectiveness of training programs for licensed and non-licensed personnel was reviewed by the inspectors during the witnessing of the licensee's performance of routine surveillance, maintenance, and operational activities and during the review of the licensee's response to events which occurred during the inspection period. Personnel appeared to be knowledgeable of the tasks being performed, and nothing was observed which indicated any ineffectiveness of trainin No violations or deviations were identifie . Report Review During the inspection period, the inspector reviewed the licensee's Monthly Operating Reports for March and April 1988. The inspector confirmed that the information provided met the requirements of Technical Specification 6.9.1.8 and Regulatory Guide 1.1 The inspector also reviewed the licensee's Monthly Plant Status Reports for March and April 198 No violations or deviations were identifie . ,
,a ,
. .
.
'
,',
be
'
.
-
18. Exit Interview (30703)
The inspectors met with the licensee and contractor representatives denoted in paragraph 1 during the inspection period and at the conclusion of the inspection on May 26, 1988. The inspectors summarized the scope and results of the inspection and discussed the likely content of this inspection report. The licensee acknowledged the information and did not indicate that any of the information disclosed during the inspection could be considered proprietary in natur '
.