Discusses Insp Repts 50-373/86-40 & 50-374/86-40 & Forwards Notice of Violation.Review for Escalated Enforcement Action Has Resulted in Severity Level IV for Tech Spec Violation & Enforcement Conference for Procedural Violation
ML20212K447
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/21/1987
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212K452 List:
References
NUDOCS 8701290078
Preceding documents:
Download: ML20212K447 (2)


Text

W

, PA

,

JAN 21 1987 Docket No. 50-373 Docket No. 50-374 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Pcs t Office Box 767 Chicago, IL 60690 Ger.tlemen:

SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORTS N0. 50-373/86040 AND NO 50-374/86040)

This refers to the inspections conducted during the period October 8 through November 17, 1986, of activities authorized by NRC Operating Licenses No. NPF-11 and No. NPF-18 for the LaSalle County Nuclear Power Station, Units 1 and 2. The inspection identified one procedural violation and one Technical Specification violation during the performance of a surveillance test on the Residual Heat Removal System for Unit i on October 17, 198 As stated in our correspo dence to you dated December 2, 1986, the two violations were under corsideration for escalated enforcement action. As a result of our review ve have decided to issue one Severity Level IV violation for the Techrscal Specification violation and request an enforcement conf,erence on the procedural violations. The procedure violation concerns issues which have occurred in the past and corrective actions have not been effective in prevent 11g their recurrence. The subject of the violation was failure of the contr(1 room operator to recognize off normal conditions and failure to perform a proper second verificatio A telephone convers.ition was held between Mr. G. Wright of my staff and Mr. Turbak of your staff and it is our understanding that February 13, 1987, at 2:00 p.m. (CST) in the Region III office in Glen Ellyn, IL would be an acceptable date f ar an enforcement conference. Be prepared to discuss the actions you have taken or plan to take to prevent recurrence of these problem You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. In your response, you should document the specific actions taken and any additional actions you plan to take to prevent recurrenc In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Roo ,qC A

B701290078 870121 PDR G

ADOCK 05000373 FDR j

// /

..

.

.

Commonwealth Edison Company 2 J AN 2~1 1987 We will gladly discuss any questions you have concerning this inspectio

Sincerely, ORIGUTAL SIGNED BY C. E. NORELIUS Charles E. Norelius, Director Division of Reactor Projects Enclosure: Notice of Violation cc w/ enclosure: *

D. L. Farrar, Director of Nuclear Licensing G. J. Diederich, Plant Manager .

DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division David Rosenblatt, Governor's Office of Consumer Services

RII RIIISN R I Rvr .

b u.,,,a k ,

[J8

,h ht/jr 4 41 nti ius abo

\\QY) t/ * 7 gko a1 lj2ije7