Forwards Insp Repts 50-373/98-23 & 50-374/98-23 on 981121-990105.No Cited Violations Identified.Two Equipment Problems Identified During Shutdown for Planned Outage Were Not Effectively Addressed to Preclude Problem Recurrence
ML20203A198
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/02/1999
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20203A202 List:
References
50-373-98-23, NUDOCS 9902090308
Download: ML20203A198 (3)


See also: IR 05000373/1998023

Text

-.

-

-.

.

..

-

-

e

.g.

p@8%

UNITED STATES

i-

f

-

NUCLEAR REGULATORY COMMISSION

o-

REGION lit

{

d

I

801 WARRENvlLLE ROAD .

'

fo

!

lisle, ILLINOIS 60532 4351

%*****/

February 2, 1999

- Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

' ATTN: Regulatory Services ~

~

j

Executive Towers West 111

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

LASALLE INSPECTION REPORT 50-373/98023(DRP); 50-374/98023(DRP)

i

Dear Nir. Kingsley.

This refers to the inspection conducted November 21,1998, through January 5,1999, at the

LaSalle Nuclear Power Station. The purpose of the inspection was to determine whether

activities authorized by the license were conducted safely and in accordance with NRC

requirements. At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report. No cited violations of NRC

'

requirements were identified during the course of this inspection.

Overall, performance of plant personnel was acceptable. Operators performed well during

routine activities and effectively controlled activities in a deliberate manner. The shutdown and

startup of Unit 1 for a planned outage was also effectively controlled by the operators.

However, the inspectors noted that in two instances, involving a failure of a turbine stop valve to

fast close and declaring the high pressure core spray system operable with an inoperable

tmergency power supply, operators did not practice strict compliance with Technical

~ Specification requirements. While the circumstances involved in each instance resulted in

' neither being safety significant, together these actions demonstrated the need to maintain

i

proper focus on Technical Specifications. In addition, system engineering support in initially

l

responding to the failure of the turbine stop valve was not thorough and did not adequately

i

i

focus on potential safety considerations.

Your staff performed maintenance activities during the inspection period in a proficient manner

and in accordance with procedures. However, two equipment problems identified during the

shutdown for a planned outage were not effectively addressed to preclude the problems from

\\

recurring during the subsequent plant startup. These problems, involving a malfunction of the

\\ \\

thrust bearing wear detector on a turbine driven reactor feedwater pump and a feedwater

heater isolation due to level instabilities in the feedwater heaters, demonstrated the need to

continue to emphasize proper resolution of material conditicn issues.

9902090308 990202

PDR

ADOCK 05000373

G

PDR

_

_ _ _

_ _ _ ._.

_

.

.

O. Kingsley

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ G. E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-373; 50-374

License Nos.: NPF-11; NPF-18

Enclosure:

Inspection Report 50-373/98023(DRP);

50-374/98023(DRP)

cc w/ encl:

D. Helwig, Senior Vice Presioent

H. Stanley, PWR Vice President

C. Crane, BWR Vice President

R. Krich, Regulatory Services Manager

S. Dort, Licensing Director

DCD - Licensing

J. Benjamin, Site Vice President

T. O'Connor, Station Manager

P. Bames, Regulatory Assurance Supervisor

R. Hubbard

M. Aguilar, Assistant Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

See Attached Distribution

'

DOCUMENT NAME: G:\\LASA\\LAS98023.DRP

To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No

copy

OFFICE

Rill

l( Rlli

lM Rlli

d

Rlli

NAME

Hills

bc4

Shear 93/-/or

LanksburyiGP

GrantCJCy

DATE

01/ti/99

01/24/99 " ~

01E9/99

01/74jO

OFFICIAL RECORD COPY

. . .

.

.

..

. - . .

.

.

.

_ - . . - . .

.-

.-

. .

. - - . . - . .

,

!

y. Y '

\\

l

O. Kingsley

-3-

'

!

r

>

Distribution:

SAR (E-Mail)

<

RPC (E-Mail)

Project Mgr., NRR w/enci

+

l-

' J. Caldwell, Rill w/enct

-

C. Pederson, Rlll w/enci

" 8. Clayton, Rlli w/enci

SRI LaSalle w/enci

DRP w/enci

- TSS w/enci

DRS (2) w/enci

l

Rlli PRR w/enci

PUBLIC IE-01 w/ encl

,

Docket File w/enci

GREENS-

IEO (E-Main)

l

DOCDESK (E-Mail)

!

l

i

.

I

i

g(jhO

l

.

.,