ML20203A198
| ML20203A198 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 02/02/1999 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20203A202 | List: |
| References | |
| 50-373-98-23, NUDOCS 9902090308 | |
| Download: ML20203A198 (3) | |
See also: IR 05000373/1998023
Text
-.
-
-.
.
..
-
-
e
.g.
p@8%
UNITED STATES
i-
f
-
NUCLEAR REGULATORY COMMISSION
o-
REGION lit
{
d
I
801 WARRENvlLLE ROAD .
'
fo
!
lisle, ILLINOIS 60532 4351
%*****/
February 2, 1999
- Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
' ATTN: Regulatory Services ~
~
j
Executive Towers West 111
1400 Opus Place, Suite 500
Downers Grove,IL 60515
SUBJECT:
LASALLE INSPECTION REPORT 50-373/98023(DRP); 50-374/98023(DRP)
i
Dear Nir. Kingsley.
This refers to the inspection conducted November 21,1998, through January 5,1999, at the
LaSalle Nuclear Power Station. The purpose of the inspection was to determine whether
activities authorized by the license were conducted safely and in accordance with NRC
requirements. At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed report. No cited violations of NRC
'
requirements were identified during the course of this inspection.
Overall, performance of plant personnel was acceptable. Operators performed well during
routine activities and effectively controlled activities in a deliberate manner. The shutdown and
startup of Unit 1 for a planned outage was also effectively controlled by the operators.
However, the inspectors noted that in two instances, involving a failure of a turbine stop valve to
fast close and declaring the high pressure core spray system operable with an inoperable
tmergency power supply, operators did not practice strict compliance with Technical
~ Specification requirements. While the circumstances involved in each instance resulted in
' neither being safety significant, together these actions demonstrated the need to maintain
i
proper focus on Technical Specifications. In addition, system engineering support in initially
l
responding to the failure of the turbine stop valve was not thorough and did not adequately
i
i
focus on potential safety considerations.
Your staff performed maintenance activities during the inspection period in a proficient manner
and in accordance with procedures. However, two equipment problems identified during the
shutdown for a planned outage were not effectively addressed to preclude the problems from
\\
recurring during the subsequent plant startup. These problems, involving a malfunction of the
\\ \\
thrust bearing wear detector on a turbine driven reactor feedwater pump and a feedwater
heater isolation due to level instabilities in the feedwater heaters, demonstrated the need to
continue to emphasize proper resolution of material conditicn issues.
9902090308 990202
ADOCK 05000373
G
_
_ _ _
_ _ _ ._.
_
.
.
O. Kingsley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the
enclosure will be placed in the NRC Public Document Room.
Sincerely,
/s/ G. E. Grant
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos.: 50-373; 50-374
Enclosure:
Inspection Report 50-373/98023(DRP);
50-374/98023(DRP)
cc w/ encl:
D. Helwig, Senior Vice Presioent
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Regulatory Services Manager
S. Dort, Licensing Director
DCD - Licensing
J. Benjamin, Site Vice President
T. O'Connor, Station Manager
P. Bames, Regulatory Assurance Supervisor
R. Hubbard
M. Aguilar, Assistant Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
See Attached Distribution
'
DOCUMENT NAME: G:\\LASA\\LAS98023.DRP
To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No
copy
OFFICE
Rill
l( Rlli
lM Rlli
d
Rlli
NAME
Hills
bc4
Shear 93/-/or
LanksburyiGP
GrantCJCy
DATE
01/ti/99
01/24/99 " ~
01E9/99
01/74jO
OFFICIAL RECORD COPY
. . .
.
.
..
. - . .
.
.
.
_ - . . - . .
.-
.-
. .
. - - . . - . .
,
!
y. Y '
\\
l
O. Kingsley
-3-
'
!
r
>
Distribution:
SAR (E-Mail)
<
RPC (E-Mail)
Project Mgr., NRR w/enci
+
l-
' J. Caldwell, Rill w/enct
-
C. Pederson, Rlll w/enci
" 8. Clayton, Rlli w/enci
SRI LaSalle w/enci
DRP w/enci
- TSS w/enci
DRS (2) w/enci
l
Rlli PRR w/enci
PUBLIC IE-01 w/ encl
,
Docket File w/enci
GREENS-
IEO (E-Main)
l
DOCDESK (E-Mail)
!
l
i
.
I
i
g(jhO
l
.
.,