ML20205S810

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-373/99-08 & 50-374/99-08 on 990311- 26.No Violations Noted.Overall,Insp Results Indicated That Unit 2 Mods Properly Installed & That Plant Matl Condition of Unit 2 Acceptable
ML20205S810
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/20/1999
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20205S814 List:
References
50-373-99-08, 50-373-99-8, 50-374-99-08, 50-374-99-8, NUDOCS 9904270029
Download: ML20205S810 (4)


See also: IR 05000373/1999008

Text

r

. .

.

.

April 20, 1999

'

Mr.' Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West lli

1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT: NRC INSPECTION REPORT 50-373/99008(DRS); 50-374/99008(DRS)

Dear Mr. Kingsley:

On March 26,1999, the NRC completed an inspection of your LaSalle Nuclear Generating

Plant, Units 1 and 2. The inspection was conducted from March 11 through 26,1999. At the

cerclusion of the inspection, on March 26,1999, the inspection results were discussed with

members of your staff,

Areas examined during the inspection are identified in the enclosed report. The inspection -

included an assessment and evaluation of engineering design change and modification activ:tiiis

with emphasis on the installation and testing of Unit 2 modifications. The material condition of I

. Unit 2 was also reviewed. Within these areas, we selectively observed activities in progress,

reviewed plant documents and representative records and discussed schedules and concems

with members of your staff.

Overall, our inspection results indicated that Unit 2 modifications were properly installed and that

the plant material condition of Unit 2 was acceptable. The installation and testing of installed -

modifications, including temporary modifications, appeared to be very good. No problems were

noted with the carry over of work not scheduled for completion during the outage. 'The System

~ Readiness Review & System Turnover to Operations Program provided a thorough review of

the status and material condition of important systems. Plant walkdowns indicated good plant

material condition and no issues were identified during the inspection that would affect the

start-up or have an impact on the operation of Unit 2.

l

,

9904270029

PDR

'/90420

G ADOCK 05000373

PM >

r

. .

g .

.

O. Kingsley -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules arjd Practices," a copy of this letter and

the enclosure will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have conceming the inspection.

Sincerely,

Original /s/ G. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure: Inspection Report 50-373/99008(DRS); 50-374/99008(DRS)

cc w/ encl: D. Helwig, Senior Vice President

H. Stanley, PWR Vice President

C. Crane, BWR Vice President

R. Krich, Vice President, Regulatory Services

DCD - Licensing

J. Benjamin, Site Vice President

T. O'Connor, Station Manager

R. Brady, Jr., Regulatory Assurance Supervisor

M. Aguilar, Assistant Attomey General

State Liaison Officer

Chairman, Illinois Commerce Commission

DOCUMENT NAME: GnDRS\LAS99008.WPD

  • See previous concurrence

gym . em e. c cue.e n m. w e em m .uce~avmiou, r cm e ne+~av.e.u. ,e=wem

OFFICE * Rill *Rlli l * Rill l Rlli

NAME AWalker:jp JJacobson MLeach GGrant/GC/

DATE 04/19/99 04/19/99 04/19/99 04ts/990O

OFFICIAL RECMD COPY

I

l

J

F1

l

. .- .

l

'

'.

O. Kingsley . -2- I

in accordance with 10 CFR 2.790 of the NRC's " Rules and Practices," a copy of this letter and

the enclosure will be placed in the NRC Public Document Room (PDR). ,

l

We will gladly discuss any questions you have concaming the inspection.

Sincerely,

l

l

L Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-373; 50-374 i

License Nos.: NPF-11; NPF-18 ; 1

! l

l Enclosure: Inspection Reports 50-373/99008(DRS); 50-374/99008(DRS)

.

!

cc w/ encl: D. Helwig, Senior Vice President

H. Stanley, PWR Vice President l

! C. Crane, BWR Vice President 1

l R. Krich, Vice Presider' Regulatory Services

l DCD - Licensing  ;

l J. Benjamin, Site Vice Nodent  ;

T. O'Connor, Station Manager

! R. Brady, Jr., Regulatory Assurance Supervisor

I

M. Aguilar, Assistant Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

!

DOCUMENT NAME: G:\DRS\LAS99008.WPD

r. - . . 6c.i. w v c- e m. cam.,w. = ,. v .c,a enm.ca,=,w.,iemur. v.%em

OFFICE Rlli Rlli -lh M Rill # Rlll l

NAME. Walker:jp N M Jacobso @ \ Leach #91&X.- Grant

DATE 04//4/99 ' 04699 M, 04JP/99 04/ /99

OFFICIAL REC 6RD -DOPY

---

7 .,

' f ,,, ; ,

,  ;

O. Kingsley -3 .

l

)

Distribution: l

AJM (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/ sod

J. Caldwell, Rill w/erici

B. Clayton, Rlll w/enct

SRI LaSalle w/enci

DRP w/enci

DRS w/enci

Rlli PRR w/enci

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

l i

,

I

3g0033

.

-

. -. . .a... - - d

.m..- -

-

-

.. ..i....... ..